Elio Marroquin Construction
- Based in
- San Mateo
- On San Francisco permits
- Aug 2018 to Jun 2026
- Last 24 months
- 5 permits filed
10 permits since 2000: 4 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Aug 2026 | 240 Santa Rosa Av | reconfigure 1st/f add n) bathroom, remodel family & bedroom. 2nd/f: reconfigure kitchen, bathroom & add n) bathroom. no expansion of bldg footprint or height proposed.Details
reconfigure 1st/f add n) bathroom, remodel family & bedroom. 2nd/f: reconfigure kitchen, bathroom & add n) bathroom. no expansion of bldg footprint or height proposed. | $199,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 281 Chenery St | remodel for existing structural in back of property. we will repair siding, reframe interior, redo plumbing for bathroom. ref pa#202506209146. comply with nov# 202316672Details
remodel for existing structural in back of property. we will repair siding, reframe interior, redo plumbing for bathroom. ref pa#202506209146. comply with nov# 202316672 | $25,000 |
| May 5, 2026 | In progress issued May 2026 | 2040 Oakdale Av | structural revision to pa 202010066034Details
structural revision to pa 202010066034 | |
| Feb 2, 2026 | Expired or cancelled withdrawn Feb 2026 | 2040 Oakdale Av | adding footings for platform that will support roof rafters for hvac unit to sit on. installing posts up to 2nd floor to support wood beams that will support roof. building platform on the beams which will hold supports for the roof for the hvac units and the opening for the hvac vents to go outDetails
adding footings for platform that will support roof rafters for hvac unit to sit on. installing posts up to 2nd floor to support wood beams that will support roof. building platform on the beams which will hold supports for the roof for the hvac units and the opening for the hvac vents to go out | $15,000 |
| Jan 8, 2025 | Completed final sign-off Jun 2025 | 1177 California St | unit#: 1215; in-kind work for bathroom. in-kind work for kitchen w/new installation of ventless electric stacked. washer/dryers. replace all carpet in/lvp. no structural work upgrade existing electrical switches and recepticals.Details
unit#: 1215; in-kind work for bathroom. in-kind work for kitchen w/new installation of ventless electric stacked. washer/dryers. replace all carpet in/lvp. no structural work upgrade existing electrical switches and recepticals. | $60,000 |
| Apr 26, 2023 | Completed final sign-off Jun 2023 | 291 Santos St | unit's 4 and 6: deck repair (leaks) remove existing waterproofing torch dow: replace sub floor plywood and dry rot if app. install new torch down deck 12x5 each deck. repair in kind less than 50%.Details
unit's 4 and 6: deck repair (leaks) remove existing waterproofing torch dow: replace sub floor plywood and dry rot if app. install new torch down deck 12x5 each deck. repair in kind less than 50%. | $6,000 |
| Sep 30, 2022 | Never finaled issued Nov 2022, no final | 653 Kearny St | remodel for new retail gift shop, new stairs, elevator, ada restroom, finish to wall/floor, new light fixtures. new north front entrance w/door controller, remove upper north facade w/new aluminum windows.Details
remodel for new retail gift shop, new stairs, elevator, ada restroom, finish to wall/floor, new light fixtures. new north front entrance w/door controller, remove upper north facade w/new aluminum windows. | $100,000 |
| Apr 27, 2022 | Completed final sign-off May 2022 | 3330 Folsom St | remove 5 front windows and replace with double panel mahogany wood windows with integral ogee lugs. in kind uf < 0.3Details
remove 5 front windows and replace with double panel mahogany wood windows with integral ogee lugs. in kind uf < 0.3 | $8,000 |
| Oct 6, 2020 | In progress issued Apr 2026 | 2040 Oakdale Av | add footings for platform to support roof rafters for hvac unit to site. installing posts to support wood beams that w/ support roof. bldg platforms on beams which will hold supports for the roof for the hvac units & opening for hvac vents to go out roofDetails
add footings for platform to support roof rafters for hvac unit to site. installing posts to support wood beams that w/ support roof. bldg platforms on beams which will hold supports for the roof for the hvac units & opening for hvac vents to go out roof | $42,000 |
| Aug 8, 2018 | Completed final sign-off Nov 2022 | 1926 Divisadero St | vertical & horizontal addition. a 2nd story addition of a master bathroom & a closet on top of the existing roof at the rear of the house. a kitchen window will be enlarged. maher n/a.Details
vertical & horizontal addition. a 2nd story addition of a master bathroom & a closet on top of the existing roof at the rear of the house. a kitchen window will be enlarged. maher n/a. | $150,000 |