Block 0629, lot 021
2222 Fillmore St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 3
- Rooms
- 2 bathrooms
- Building
- 3,687 sq ft
- Lot
- 2,262 sq ft
- Zoning
- FILLMR
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Sep 2026 | 2222 Fillmore St | Sweitzer Inc. | defferred mechanical, electrical, plumbing and food service. ref 202603268336Details
defferred mechanical, electrical, plumbing and food service. ref 202603268336 | $130,000 |
| May 13, 2026 | In progress issued May 2026 | 2220 Fillmore St | Nabi Construction & Engineering Inc | revision to pa# 202508042264: add (n) 2x8 @ 16" o.c to 2nd floor framing to support additional (n) clg. wt. of 10psf at 2nd floor as shown on plans.Details
revision to pa# 202508042264: add (n) 2x8 @ 16" o.c to 2nd floor framing to support additional (n) clg. wt. of 10psf at 2nd floor as shown on plans. | $10,000 |
| Mar 26, 2026 | In progress issued Jun 2026 | 2222 Fillmore St | t.i.-exterior:remove (e) marquee; replace (e) storefront windows w/ (n) aluminum windows. interior: (n) accessible unisex bathroom; dining room w/ (n) finishes and furniture. signage, food service & mep (including lighting) will be under separate permit.Details
t.i.-exterior:remove (e) marquee; replace (e) storefront windows w/ (n) aluminum windows. interior: (n) accessible unisex bathroom; dining room w/ (n) finishes and furniture. signage, food service & mep (including lighting) will be under separate permit. | $210,586 | |
| Oct 27, 2025 | In progress issued Oct 2025 | 2220 Fillmore St | Nabi Construction & Engineering Inc | revision to pa # 2025-0804-2264. provide new steel beam at 2nd fl midspan between grid line 3.2 & 4Details
revision to pa # 2025-0804-2264. provide new steel beam at 2nd fl midspan between grid line 3.2 & 4 | |
| Aug 4, 2025 | In progress issued Aug 2025 | 2220 Fillmore St | Nabi Construction & Engineering Inc | lower floor at back at vacant space for future t.i. accessiblity deferred per ab17. lower portion of (e) first floor between grid line 3 & 4 and provide new steel moment frame.Details
lower floor at back at vacant space for future t.i. accessiblity deferred per ab17. lower portion of (e) first floor between grid line 3 & 4 and provide new steel moment frame. | $55,000 |
| Aug 31, 2016 | Never finaled issued Aug 2016, no final | 2222 Fillmore St | street space w/mtaDetails
street space w/mta | ||
| Aug 31, 2016 | Never finaled issued Aug 2016, no final | 2222 Fillmore St | street spaceDetails
street space | ||
| Sep 23, 2013 | Never finaled issued Sep 2013, no final | 2222 Fillmore St | street space permitDetails
street space permit | ||
| Sep 12, 2013 | Expired or cancelled cancelled Jan 2026 | 2222 Fillmore St | replacement of exterior finishes, door hardware. (e) canopy & workmark to remain & be cleaned & painted. replacement of removable outdoor furniture with built in flip bench. signage under seperate permitDetails
replacement of exterior finishes, door hardware. (e) canopy & workmark to remain & be cleaned & painted. replacement of removable outdoor furniture with built in flip bench. signage under seperate permit | $5,000 | |
| Aug 14, 2013 | Completed final sign-off Oct 2013 | 2222 Fillmore St | Kdc Construction | interior t.i. to existing coffee shop. new floor, casework, lighting, ceiling & mechanical system. reconfigure backbar & restroom. minor improvements to existing workroom, relocation & installation of equipment.Details
interior t.i. to existing coffee shop. new floor, casework, lighting, ceiling & mechanical system. reconfigure backbar & restroom. minor improvements to existing workroom, relocation & installation of equipment. | $226,000 |
| Jun 3, 2013 | Completed final sign-off Jul 2013 | 2222 Fillmore St | Adullam Dba County Roofing Co | reroofingDetails
reroofing | $16,200 |
| Feb 23, 2012 | Never finaled issued Feb 2012, no final | 2222 Fillmore St | street space & sidewalkDetails
street space & sidewalk | ||
| Jun 15, 2010 | Completed final sign-off Nov 2010 | 2222 Fillmore St | Wells Construction Inc | remove (e) casework @ backbar & install tile & undercounter refrigerator & microwave & associated electrical outlets for both.Details
remove (e) casework @ backbar & install tile & undercounter refrigerator & microwave & associated electrical outlets for both. | $5,000 |
| Jul 1, 2008 | Never finaled issued Jul 2008, no final | 2222 Fillmore St | street space permit only.Details
street space permit only. | ||
| Jan 15, 2008 | Completed final sign-off Jul 2008 | 2222 Fillmore St | renovation of existing starbucks-replacement of some finishes, cabinets, some equipment and lighting. lighting modifications shall not exceed 50% of existing wattage use therefore title 24 not required. no structural work.Details
renovation of existing starbucks-replacement of some finishes, cabinets, some equipment and lighting. lighting modifications shall not exceed 50% of existing wattage use therefore title 24 not required. no structural work. | $25,000 | |
| Jun 16, 2000 | Expired or cancelled expired Dec 2000 | 2222 Fillmore St | The Lawson Roofing Co Inc. | re roofingDetails
re roofing | $9,982 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nabi Construction & Engineering Inc (3), Adullam Dba County Roofing Co, Kdc Construction, Sweitzer Inc., The Lawson Roofing Co Inc., Wells Construction Inc
- Architects
- Caroline Nassif (2), Barry Bourbon
- Engineers
- Javed J. Tharavi (3), Antonio Jacksalem, Meng Hsiu Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.