Block 0125, lot 007
1250 Vallejo St
- City’s use
- Multi-Family Residential
- Built
- 1918
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 10,860 sq ft
- Lot
- 6,011 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2021 | Completed final sign-off Nov 2021 | 1250 Vallejo St | Tipco Construction Inc | unit 11: remodel 1 kitchen & 1 bath. demo existing kitchen cabinets, countertop and floor tile. repplace all previous items in kind. demo bathroom tub, sink, and toilet and tile floor in one bathroom. replace all item's removed in kind. remove and replace one bathroom closet.Details
unit 11: remodel 1 kitchen & 1 bath. demo existing kitchen cabinets, countertop and floor tile. repplace all previous items in kind. demo bathroom tub, sink, and toilet and tile floor in one bathroom. replace all item's removed in kind. remove and replace one bathroom closet. | $36,869 |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 1250 Vallejo St | streetspaceDetails
streetspace | ||
| Apr 24, 2018 | Completed final sign-off Aug 2018 | 1250 Vallejo St | Fire & Security & Alarm Co/ F.S.A.C. | like for like fire system replacement with upgrade w/new control panel, smoke & heat detector & pull stations at the same location. install radio communicator low requency sounders in every unit & tie-in (e) horn strobes to new panel 2017-0621-0010Details
like for like fire system replacement with upgrade w/new control panel, smoke & heat detector & pull stations at the same location. install radio communicator low requency sounders in every unit & tie-in (e) horn strobes to new panel 2017-0621-0010 | $18,000 |
| Nov 3, 2017 | Completed final sign-off Jan 2018 | 1250 Vallejo St | Nabi Construction & Engineering Inc | revision to pa 2017-0621-0010 & 2017-1013-1222 - shift steel frame @ line 1; revise shear wallsDetails
revision to pa 2017-0621-0010 & 2017-1013-1222 - shift steel frame @ line 1; revise shear walls | |
| Oct 23, 2017 | Never finaled issued Oct 2017, no final | 1250 Vallejo St | street spaceDetails
street space | ||
| Oct 13, 2017 | Completed final sign-off Jan 2018 | 1250 Vallejo St | Nabi Construction & Engineering Inc | revision to pa 2017-0621-0010, revise shear wallsDetails
revision to pa 2017-0621-0010, revise shear walls | |
| Jun 21, 2017 | Completed final sign-off Jan 2018 | 1250 Vallejo St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4 | $110,000 |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 1250 Vallejo St | Chau Construction | to comply with nov # 201245962. remodeling kitchen and bathroom. replace cabinets, sink top plumbing system, tub, faucet, vanity and electricalDetails
to comply with nov # 201245962. remodeling kitchen and bathroom. replace cabinets, sink top plumbing system, tub, faucet, vanity and electrical | $15,000 |
| Nov 17, 2005 | Expired or cancelled expired Dec 2008 | 1250 Vallejo St | Mashal Builders & Contractors Inc | cosmetic changes, kitchen and bathroom remodels, minimal plumbing and electrical workDetails
cosmetic changes, kitchen and bathroom remodels, minimal plumbing and electrical work | $85,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nabi Construction & Engineering Inc (3), Chau Construction, Fire & Security & Alarm Co/ F.S.A.C., Mashal Builders & Contractors Inc, Tipco Construction Inc
- Engineers
- Javed Tharani (2)