Tipco Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Jul 2026
- Last 24 months
- 5 permits filed
38 permits since 2000: 30 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2026 | In progress issued Aug 2026 | 2346 Lombard St | ground floor: ti to existing space for studio retail.Details
ground floor: ti to existing space for studio retail. | $10,000 |
| Apr 15, 2025 | Completed final sign-off May 2025 | 164 South Park | revision to 202305248506 and 202406104101 to include revision to corner detail in order to elimnate (5b1) all other welding requirement and replace with fillet weld.Details
revision to 202305248506 and 202406104101 to include revision to corner detail in order to elimnate (5b1) all other welding requirement and replace with fillet weld. | |
| Jan 13, 2025 | In progress issued Jan 2025 | 2100 Jones St | unit 4- remodel kitchen and bathroom . repair lat and plaster as needed.Details
unit 4- remodel kitchen and bathroom . repair lat and plaster as needed. | $50,000 |
| Nov 22, 2024 | In progress issued Nov 2024 | 520 Lombard St | unit c at rear bldg- remodel lower level unit including bathrooom and kitchen. add and modify windows at rear and front. provide (n) electrical heat pump at both bedrooms and living area. provide concrete footings all arounmd and new sheer walls.Details
unit c at rear bldg- remodel lower level unit including bathrooom and kitchen. add and modify windows at rear and front. provide (n) electrical heat pump at both bedrooms and living area. provide concrete footings all arounmd and new sheer walls. | $80,000 |
| Nov 5, 2024 | Completed final sign-off May 2025 | 3502 16th St | rebuild (e) deck and stair in same configuration at rear and side of buildingDetails
rebuild (e) deck and stair in same configuration at rear and side of building | $50,000 |
| Jul 19, 2024 | Expired or cancelled cancelled Feb 2025 | 520 Lombard St | apartment c: remodel one kitchen and (2) bathrooms, remove lath and plaster and repair where needed @ kitchen & bathsDetails
apartment c: remodel one kitchen and (2) bathrooms, remove lath and plaster and repair where needed @ kitchen & baths | $30,000 |
| Jun 10, 2024 | Completed final sign-off May 2025 | 164 South Park | rev 202305248506- replacement of foundation details due to discovery of partial basement; replacement of (e) brick foundation and replacement (e) beam at gridline a.4 at roofDetails
rev 202305248506- replacement of foundation details due to discovery of partial basement; replacement of (e) brick foundation and replacement (e) beam at gridline a.4 at roof | $50,000 |
| Feb 15, 2024 | Completed final sign-off Apr 2024 | 1139 Bay St | demo laundry room and replace with sameDetails
demo laundry room and replace with same | $10,000 |
| Oct 16, 2023 | Completed final sign-off Mar 2024 | 2100 Jones St | replace 20 windows on jones st 2nd and 3rd flr. and in units 3 and 6. alum clad wood double hung.Details
replace 20 windows on jones st 2nd and 3rd flr. and in units 3 and 6. alum clad wood double hung. | $15,000 |
| Sep 26, 2023 | Completed final sign-off Mar 2024 | 1141 Bay St | (bath remodel) demo one bathroom down to studs and replacing same.Details
(bath remodel) demo one bathroom down to studs and replacing same. | $30,000 |
| Aug 28, 2023 | Completed final sign-off Aug 2024 | 2100 Jones St | unit #1: remodel one kitchen and one bathroom repair latt and plaster where needed.Details
unit #1: remodel one kitchen and one bathroom repair latt and plaster where needed. | $48,000 |
| Aug 14, 2023 | Completed final sign-off Mar 2024 | 2100 Jones St | @ 3rd & 4th floor, units 3 and 6 remove 6 ft of non-load bearing wall between living room and hallway. must comply with sffc sec 1103.7.6.1.Details
@ 3rd & 4th floor, units 3 and 6 remove 6 ft of non-load bearing wall between living room and hallway. must comply with sffc sec 1103.7.6.1. | $4,000 |
| Jul 28, 2023 | Completed final sign-off Mar 2024 | 2100 Jones St | unit 3: remodel one kitchen and one bathroom repair, latt and plaster where needed. non structuralDetails
unit 3: remodel one kitchen and one bathroom repair, latt and plaster where needed. non structural | $48,000 |
| Jul 14, 2023 | In progress issued Apr 2024 | 6 Caine Av | erect a 2 story, 2 dwelling bldg with 1 basement, type vbDetails
erect a 2 story, 2 dwelling bldg with 1 basement, type vb | $900,000 |
| Jul 11, 2023 | Completed final sign-off Mar 2024 | 2100 Jones St | unit #6: remodel 1 kitchen and 1 bathroom. repair lath and plaster where needed. all work in-kind.Details
unit #6: remodel 1 kitchen and 1 bathroom. repair lath and plaster where needed. all work in-kind. | $48,000 |
| Jul 6, 2023 | Completed final sign-off Aug 2024 | 2102 Jones St | remodel one kitchen and one bedroom, repair latt and plaster where needed. no wall removalDetails
remodel one kitchen and one bedroom, repair latt and plaster where needed. no wall removal | $23,000 |
| May 24, 2023 | Completed final sign-off May 2025 | 164 South Park | improvements to bldg facade to improve access & address sf planning storefront transparency guidelines for commercial businesses. limited to exterior improvements to bldg facade at the south park frontage. imrpovements have no impact on bldg layout, heigh, bldg area, use/occupancy.Details
improvements to bldg facade to improve access & address sf planning storefront transparency guidelines for commercial businesses. limited to exterior improvements to bldg facade at the south park frontage. imrpovements have no impact on bldg layout, heigh, bldg area, use/occupancy. | $179,615 |
| Apr 6, 2023 | Completed final sign-off Feb 2024 | 2100 Jones St | revision to pa# 2022-1206-7725 & 2022-1215-8429, field revisions per site conditions, shearwall updates add grade beam, revise details at front moment frameDetails
revision to pa# 2022-1206-7725 & 2022-1215-8429, field revisions per site conditions, shearwall updates add grade beam, revise details at front moment frame | $7,500 |
| Oct 6, 2022 | Never finaled issued Oct 2022, no final | 2401 16th St | due to fire damange: temporary shoring of the 2/f floor along bryant street and removal of hazadous fire damaged awning and replace in-kind - comply to nov202296300 bldg not occupiedDetails
due to fire damange: temporary shoring of the 2/f floor along bryant street and removal of hazadous fire damaged awning and replace in-kind - comply to nov202296300 bldg not occupied | $20,000 |
| Aug 2, 2022 | Completed final sign-off Mar 2023 | 520 Lombard St | replace exterior siding on front and back walls only and replace dryrot where needed. approximately 20' wide by 20' tall (material hardy plank))Details
replace exterior siding on front and back walls only and replace dryrot where needed. approximately 20' wide by 20' tall (material hardy plank)) | $45,000 |
| Jun 29, 2022 | Completed final sign-off Apr 2026 | 2100 Jones St | convert the existing 2nd floor commercial space to one two-level adu unit at the 1st and 2nd floors per the local adu program.Details
convert the existing 2nd floor commercial space to one two-level adu unit at the 1st and 2nd floors per the local adu program. | $60,000 |
| Feb 10, 2022 | Completed final sign-off Oct 2022 | 628 Central Av | repairing and replacing siding on exterior wall locatd at back area of building. not visible from street.Details
repairing and replacing siding on exterior wall locatd at back area of building. not visible from street. | $32,750 |
| Jan 13, 2022 | Completed final sign-off Feb 2022 | 2421 16th St | unit # 401: demo tile in (1) bathroom due to water damage and replace. remove entry door and frame and replace. repair hardwood floor due to water damage.Details
unit # 401: demo tile in (1) bathroom due to water damage and replace. remove entry door and frame and replace. repair hardwood floor due to water damage. | $42,500 |
| Oct 26, 2021 | Completed final sign-off Dec 2021 | 2423 16th St | one bathroom remodel,replace insulation,sheetrock and tile in bath due to waterdamage. one kitchen , office,replace insulation & sheetrock in ceiling due to water damage.Details
one bathroom remodel,replace insulation,sheetrock and tile in bath due to waterdamage. one kitchen , office,replace insulation & sheetrock in ceiling due to water damage. | $31,750 |
| Aug 31, 2021 | Completed final sign-off Oct 2021 | 2421 16th St | adminstrative correction: one bathroom remodel, remove some sheetrock & wall & floor tile and replace in kind. change wording to bathroom remodel per inspector's request. ref pa# 202108246970.Details
adminstrative correction: one bathroom remodel, remove some sheetrock & wall & floor tile and replace in kind. change wording to bathroom remodel per inspector's request. ref pa# 202108246970. | |
| Aug 24, 2021 | Completed final sign-off Oct 2021 | 2421 16th St | one bathroom and kitchen repair. replace insulation and sheetrock in kitchen ceiling due to water damage. replace sheetrock, and tile in bathroom due to water damage. insulation installed in bathroom.Details
one bathroom and kitchen repair. replace insulation and sheetrock in kitchen ceiling due to water damage. replace sheetrock, and tile in bathroom due to water damage. insulation installed in bathroom. | $31,800 |
| Aug 10, 2021 | Completed final sign-off Nov 2021 | 1250 Vallejo St | unit 11: remodel 1 kitchen & 1 bath. demo existing kitchen cabinets, countertop and floor tile. repplace all previous items in kind. demo bathroom tub, sink, and toilet and tile floor in one bathroom. replace all item's removed in kind. remove and replace one bathroom closet.Details
unit 11: remodel 1 kitchen & 1 bath. demo existing kitchen cabinets, countertop and floor tile. repplace all previous items in kind. demo bathroom tub, sink, and toilet and tile floor in one bathroom. replace all item's removed in kind. remove and replace one bathroom closet. | $36,869 |
| Feb 11, 2021 | Never finaled issued Apr 2021, no final | 2410 33rd Av | install emergency responder radio courage system.Details
install emergency responder radio courage system. | $50,000 |
| Oct 5, 2020 | Completed final sign-off Jan 2024 | 2403 16th St | revert 2nd & 3rd floor office to residential units (original use before 1985 office conversion). minor interior remodel. add rear stair to 2nd floor deck for open space. all structural work under separate permitDetails
revert 2nd & 3rd floor office to residential units (original use before 1985 office conversion). minor interior remodel. add rear stair to 2nd floor deck for open space. all structural work under separate permit | $200,000 |
| Apr 2, 2019 | Never finaled issued Sep 2023, no final | 1347 27th Av | erect a 4 story, two unit dwelling, no basement type vbDetails
erect a 4 story, two unit dwelling, no basement type vb | $900,000 |
| Nov 18, 2014 | Completed final sign-off Feb 2015 | 2421 16th St | revision to app#201208248160. structural modification.Details
revision to app#201208248160. structural modification. | $10,000 |
| Nov 17, 2014 | Completed final sign-off Feb 2015 | 2421 16th St | new communication opening with ab-010 in previously approved applications: 201208248160,201308285503 and 201404294429; revise 1-hour door from sliding to roll up; maher n/aDetails
new communication opening with ab-010 in previously approved applications: 201208248160,201308285503 and 201404294429; revise 1-hour door from sliding to roll up; maher n/a | |
| Jun 20, 2012 | Completed final sign-off Jun 2021 | 2255 Taraval St | to erect 4 stories, 10 dwelling units, no basement, with retail & parking, mixed use building.Details
to erect 4 stories, 10 dwelling units, no basement, with retail & parking, mixed use building. | $1,750,000 |
| Jun 18, 2009 | Completed final sign-off Nov 2009 | 200 Putnam St | relocate flat skylight, revise stair location at 4th floor, revise exterior concrete stair at grade at rear of building. structural to match revised architectural plans, revision to pa# 2009/06/02/9560, 2008/09/05/0923 & pa# 2000/08/25/8930 s1/r1.Details
relocate flat skylight, revise stair location at 4th floor, revise exterior concrete stair at grade at rear of building. structural to match revised architectural plans, revision to pa# 2009/06/02/9560, 2008/09/05/0923 & pa# 2000/08/25/8930 s1/r1. | $12,000 |
| Jun 5, 2009 | Completed final sign-off Nov 2009 | 200 Putnam St | revision to pa# 2000.08.25.8930. revision of roof hatch from electrical to manual operatedDetails
revision to pa# 2000.08.25.8930. revision of roof hatch from electrical to manual operated | |
| Jun 2, 2009 | Completed final sign-off Nov 2009 | 200 Putnam St | renew pa# 2000/08/25/8930 to complete work & obtain final inspection.Details
renew pa# 2000/08/25/8930 to complete work & obtain final inspection. | $10,000 |
| Jun 2, 2009 | Completed final sign-off Nov 2009 | 200 Putnam St | revision to 200809050923, new slab on grade stairs at rear yardDetails
revision to 200809050923, new slab on grade stairs at rear yard | $4,500 |
| Feb 23, 2009 | Completed final sign-off Oct 2011 | 263 Dorland St | conversion of e single family residence into 2 family residence for existing rear cottage. removal of exterior stair and porch. new doors and windows.Details
conversion of e single family residence into 2 family residence for existing rear cottage. removal of exterior stair and porch. new doors and windows. | $300,000 |