Tipco Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Jul 2026
- Last 24 months
- 5 permits filed
38 permits since 2000: 30 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 4 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2024 | Completed final sign-off May 2025 | 3502 16th St | rebuild (e) deck and stair in same configuration at rear and side of buildingDetails
rebuild (e) deck and stair in same configuration at rear and side of building | $50,000 |
| Oct 5, 2020 | Completed final sign-off Jan 2024 | 2403 16th St | revert 2nd & 3rd floor office to residential units (original use before 1985 office conversion). minor interior remodel. add rear stair to 2nd floor deck for open space. all structural work under separate permitDetails
revert 2nd & 3rd floor office to residential units (original use before 1985 office conversion). minor interior remodel. add rear stair to 2nd floor deck for open space. all structural work under separate permit | $200,000 |
| Jun 18, 2009 | Completed final sign-off Nov 2009 | 200 Putnam St | relocate flat skylight, revise stair location at 4th floor, revise exterior concrete stair at grade at rear of building. structural to match revised architectural plans, revision to pa# 2009/06/02/9560, 2008/09/05/0923 & pa# 2000/08/25/8930 s1/r1.Details
relocate flat skylight, revise stair location at 4th floor, revise exterior concrete stair at grade at rear of building. structural to match revised architectural plans, revision to pa# 2009/06/02/9560, 2008/09/05/0923 & pa# 2000/08/25/8930 s1/r1. | $12,000 |
| Jun 2, 2009 | Completed final sign-off Nov 2009 | 200 Putnam St | revision to 200809050923, new slab on grade stairs at rear yardDetails
revision to 200809050923, new slab on grade stairs at rear yard | $4,500 |
| Feb 23, 2009 | Completed final sign-off Oct 2011 | 263 Dorland St | conversion of e single family residence into 2 family residence for existing rear cottage. removal of exterior stair and porch. new doors and windows.Details
conversion of e single family residence into 2 family residence for existing rear cottage. removal of exterior stair and porch. new doors and windows. | $300,000 |