Back to bathroom remodel contractors
Tipco Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Jul 2026
- Last 24 months
- 5 permits filed
38 permits since 2000: 30 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 83 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2025 | In progress issued Jan 2025 | 2100 Jones St | unit 4- remodel kitchen and bathroom . repair lat and plaster as needed.Details
unit 4- remodel kitchen and bathroom . repair lat and plaster as needed. | $50,000 |
| Jul 19, 2024 | Expired or cancelled cancelled Feb 2025 | 520 Lombard St | apartment c: remodel one kitchen and (2) bathrooms, remove lath and plaster and repair where needed @ kitchen & bathsDetails
apartment c: remodel one kitchen and (2) bathrooms, remove lath and plaster and repair where needed @ kitchen & baths | $30,000 |
| Sep 26, 2023 | Completed final sign-off Mar 2024 | 1141 Bay St | (bath remodel) demo one bathroom down to studs and replacing same.Details
(bath remodel) demo one bathroom down to studs and replacing same. | $30,000 |
| Aug 28, 2023 | Completed final sign-off Aug 2024 | 2100 Jones St | unit #1: remodel one kitchen and one bathroom repair latt and plaster where needed.Details
unit #1: remodel one kitchen and one bathroom repair latt and plaster where needed. | $48,000 |
| Jul 28, 2023 | Completed final sign-off Mar 2024 | 2100 Jones St | unit 3: remodel one kitchen and one bathroom repair, latt and plaster where needed. non structuralDetails
unit 3: remodel one kitchen and one bathroom repair, latt and plaster where needed. non structural | $48,000 |
| Jul 11, 2023 | Completed final sign-off Mar 2024 | 2100 Jones St | unit #6: remodel 1 kitchen and 1 bathroom. repair lath and plaster where needed. all work in-kind.Details
unit #6: remodel 1 kitchen and 1 bathroom. repair lath and plaster where needed. all work in-kind. | $48,000 |
| Jan 13, 2022 | Completed final sign-off Feb 2022 | 2421 16th St | unit # 401: demo tile in (1) bathroom due to water damage and replace. remove entry door and frame and replace. repair hardwood floor due to water damage.Details
unit # 401: demo tile in (1) bathroom due to water damage and replace. remove entry door and frame and replace. repair hardwood floor due to water damage. | $42,500 |
| Oct 26, 2021 | Completed final sign-off Dec 2021 | 2423 16th St | one bathroom remodel,replace insulation,sheetrock and tile in bath due to waterdamage. one kitchen , office,replace insulation & sheetrock in ceiling due to water damage.Details
one bathroom remodel,replace insulation,sheetrock and tile in bath due to waterdamage. one kitchen , office,replace insulation & sheetrock in ceiling due to water damage. | $31,750 |
| Aug 31, 2021 | Completed final sign-off Oct 2021 | 2421 16th St | adminstrative correction: one bathroom remodel, remove some sheetrock & wall & floor tile and replace in kind. change wording to bathroom remodel per inspector's request. ref pa# 202108246970.Details
adminstrative correction: one bathroom remodel, remove some sheetrock & wall & floor tile and replace in kind. change wording to bathroom remodel per inspector's request. ref pa# 202108246970. | |
| Aug 24, 2021 | Completed final sign-off Oct 2021 | 2421 16th St | one bathroom and kitchen repair. replace insulation and sheetrock in kitchen ceiling due to water damage. replace sheetrock, and tile in bathroom due to water damage. insulation installed in bathroom.Details
one bathroom and kitchen repair. replace insulation and sheetrock in kitchen ceiling due to water damage. replace sheetrock, and tile in bathroom due to water damage. insulation installed in bathroom. | $31,800 |
| Aug 10, 2021 | Completed final sign-off Nov 2021 | 1250 Vallejo St | unit 11: remodel 1 kitchen & 1 bath. demo existing kitchen cabinets, countertop and floor tile. repplace all previous items in kind. demo bathroom tub, sink, and toilet and tile floor in one bathroom. replace all item's removed in kind. remove and replace one bathroom closet.Details
unit 11: remodel 1 kitchen & 1 bath. demo existing kitchen cabinets, countertop and floor tile. repplace all previous items in kind. demo bathroom tub, sink, and toilet and tile floor in one bathroom. replace all item's removed in kind. remove and replace one bathroom closet. | $36,869 |