Katherine Fontaine
- Listed as
- architect, authorized agent-others, designer
- Firm
- Actually Design Build
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Sep 2026
88 permits since 2000 (architect on 83 permits, authorized agent-others on 4 permits, designer on 2 permits): 61 completed, 12 in progress, 6 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 2627 16th Av | revision to permits 202502251029,202507312075,202512081232. replace two street facing windows, revise title 24 documentation. change furnace to hydronic radiant heating.Details
revision to permits 202502251029,202507312075,202512081232. replace two street facing windows, revise title 24 documentation. change furnace to hydronic radiant heating. | $2,000 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1723 35th Av | Actually Design Build Inc | g/f: add 1 adu, 805sf adu 1-bed. remodel 2/f including 2 beds, 1 bath, 1 powder rm, kitchen and living area. add 3/f including laundry room, offie and master suite. add rear deck and spiral stair from 2/f to rear yard.project is subject to ab112 all-electric ordinance.Details
g/f: add 1 adu, 805sf adu 1-bed. remodel 2/f including 2 beds, 1 bath, 1 powder rm, kitchen and living area. add 3/f including laundry room, offie and master suite. add rear deck and spiral stair from 2/f to rear yard.project is subject to ab112 all-electric ordinance. | $525,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 159 Beaver St | Actually Design Build Inc | revision to pa#202507160911: structural repairs at rear concrete retaining wall. waterproofing at existing rear retaining wall.Details
revision to pa#202507160911: structural repairs at rear concrete retaining wall. waterproofing at existing rear retaining wall. | $8,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 1262 46th Av | Actually Design Build Inc | revision to bpa:202510207736- at rear southeast corner, step in south and west exterior walls in 6" @ 1st floor and add 1 skylight.Details
revision to bpa:202510207736- at rear southeast corner, step in south and west exterior walls in 6" @ 1st floor and add 1 skylight. | $1,500 |
| Jun 25, 2026 | In progress issued Jun 2026 | 27 Roanoke St | Actually Design Build Inc | remodel kitchen, install new slider door at l2 rear, eliminate wall between kitchen and family room.Details
remodel kitchen, install new slider door at l2 rear, eliminate wall between kitchen and family room. | $70,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 1262 46th Av | Actually Design Build Inc | revision to 202510207736. clarity deferred submittal note on title sheet. 13d sprinkler system to be provided.Details
revision to 202510207736. clarity deferred submittal note on title sheet. 13d sprinkler system to be provided. | |
| Jun 4, 2026 | In progress issued Jul 2026 | 378 Franconia St | Actually Design Build Inc | remodel ground level: add new bedroom, new bathroom. new window and door at rear wall.Details
remodel ground level: add new bedroom, new bathroom. new window and door at rear wall. | $125,000 |
| Apr 17, 2026 | Completed final sign-off Aug 2026 | 1250 42nd Av | Actually Design Build Inc | revision to pa#202506269526, t-24 revision, remodel of an existing second floor bathroom to include (n) plumbing fixtures.Details
revision to pa#202506269526, t-24 revision, remodel of an existing second floor bathroom to include (n) plumbing fixtures. | $10,000 |
| Apr 15, 2026 | Completed final sign-off Jun 2026 | 1260 46th Av | Actually Design Build Inc | provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential 1262 46th ave neighboring property structure under pa# 202510207736.Details
provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential 1262 46th ave neighboring property structure under pa# 202510207736. | $1,000 |
| Apr 15, 2026 | Completed final sign-off Jun 2026 | 1266 46th Av | Actually Design Build Inc | front building, provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential 1262 46th ave neighboring property structure under pa# 202510207736.Details
front building, provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential 1262 46th ave neighboring property structure under pa# 202510207736. | $1,000 |
| Apr 15, 2026 | Completed final sign-off Jun 2026 | 1264 46th Av | Actually Design Build Inc | provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential structure under pa#202510207736.Details
provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential structure under pa#202510207736. | $1,000 |
| Dec 3, 2025 | In progress issued Apr 2026 | 1262 46th Av | Actually Design Build Inc | erect a (n) type v-b, 3-story building with 2 residential units.Details
erect a (n) type v-b, 3-story building with 2 residential units. | $620,000 |
| Dec 3, 2025 | Completed final sign-off Jun 2026 | 1262 46th Av | Actually Design Build Inc | demolish existing type 5, 2-story 1-bedroom single family home.Details
demolish existing type 5, 2-story 1-bedroom single family home. | $30,000 |
| Dec 2, 2025 | Completed final sign-off Aug 2026 | 1250 42nd Av | Actually Design Build Inc | revision to pa # 2025-0626-9526. structural framing changes based on as built conditionsDetails
revision to pa # 2025-0626-9526. structural framing changes based on as built conditions | |
| Jul 31, 2025 | In progress issued Aug 2025 | 2627 16th Av | Mission Home Remodeling Inc, Soto Fernando | revision to 202502251029: level 2: remove center courtyard. add 2 skylights at kitchen, 2 skylights at office, 1 skylight at hallway. structural work included.Details
revision to 202502251029: level 2: remove center courtyard. add 2 skylights at kitchen, 2 skylights at office, 1 skylight at hallway. structural work included. | $25,000 |
| Jul 31, 2025 | Completed final sign-off Mar 2026 | 422 Funston Av | Actually Design Build Inc | revise pa #2025-0528-7428 to include the additional scope of work: replace 3 front-facing, level 4 windows, replace waterproofing and exterior siding at the entirety of level 4, add 1 skylight at level 3 roof, perform structural repairs to existing framing per field and construction conditions.Details
revise pa #2025-0528-7428 to include the additional scope of work: replace 3 front-facing, level 4 windows, replace waterproofing and exterior siding at the entirety of level 4, add 1 skylight at level 3 roof, perform structural repairs to existing framing per field and construction conditions. | $25,000 |
| Jul 18, 2025 | In progress issued Sep 2025 | 2339 39th Av | F C Company | rear deck and stair. replace two windows at front elevation. replace two rear windows with doors.Details
rear deck and stair. replace two windows at front elevation. replace two rear windows with doors. | $25,000 |
| Jul 16, 2025 | In progress issued Jul 2025 | 159 Beaver St | Actually Design Build Inc | replace damaged roof framing adn third floor framing. remodel 2 bathrooms and kitchen. add storage closet at laundry. new stucco at front. new windows at front and rear walls.Details
replace damaged roof framing adn third floor framing. remodel 2 bathrooms and kitchen. add storage closet at laundry. new stucco at front. new windows at front and rear walls. | $250,000 |
| Jul 16, 2025 | Completed final sign-off Aug 2026 | 1250 42nd Av | Actually Design Build Inc | at first floor: reconfigure existing bathroom and bedroom, add one bedroom. at second floor: extend primary bedroom and relocate powder room. adding 435 sf conditioned area. new windows and door at rear walls.Details
at first floor: reconfigure existing bathroom and bedroom, add one bedroom. at second floor: extend primary bedroom and relocate powder room. adding 435 sf conditioned area. new windows and door at rear walls. | $130,000 |
| Jul 7, 2025 | Completed final sign-off Jun 2026 | 422 Funston Av | Actually Design Build Inc | addition of adu located at ground floor to be submitted under state program . adu to be studio apartment (total 630sf) seismic upgrade to 1st floor.Details
addition of adu located at ground floor to be submitted under state program . adu to be studio apartment (total 630sf) seismic upgrade to 1st floor. | $100,000 |
| Jun 5, 2025 | Completed final sign-off Dec 2025 | 4035 20th St | Actually Design Build Inc | revision to 202505015600: replace waterproofing and plaster in kind on 250 sf of north and east facade.Details
revision to 202505015600: replace waterproofing and plaster in kind on 250 sf of north and east facade. | $5,000 |
| May 28, 2025 | Completed final sign-off Mar 2026 | 422 Funston Av | Actually Design Build Inc | unit# 422: remodel (e) bathroom and add powder room. unit# 424: remodel (e) kitchen, guest bathroon and primary bathroom. widen openings between kitchen/dining/living rooms. replace staircase to upper floor. replace rear windows and siding at both units.Details
unit# 422: remodel (e) bathroom and add powder room. unit# 424: remodel (e) kitchen, guest bathroon and primary bathroom. widen openings between kitchen/dining/living rooms. replace staircase to upper floor. replace rear windows and siding at both units. | $250,000 |
| May 21, 2025 | Completed final sign-off Aug 2025 | 4181 26th St | Actually Design Build Inc | add elevator from 1st floor to the 3rd floor.Details
add elevator from 1st floor to the 3rd floor. | $25,000 |
| May 1, 2025 | Completed final sign-off Dec 2025 | 4035 20th St | Actually Design Build Inc | replace 11 windows & 1 french door w/ new aluminum clad wood windows & doorsDetails
replace 11 windows & 1 french door w/ new aluminum clad wood windows & doors | $10,000 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 4035 20th St | Actually Design Build Inc | level 2: kitchen and bathroom remodel. replace flooring throughout. replace tile at patio. level 3: primary bathroom remodel. replace flooring throughoutDetails
level 2: kitchen and bathroom remodel. replace flooring throughout. replace tile at patio. level 3: primary bathroom remodel. replace flooring throughout | $75,000 |
| Apr 16, 2025 | In progress issued May 2025 | 2339 39th Av | F C Company | 1st fl: add office, bedroom and bathroom. enclose entryway 2nd fl: remodel (e) kitchen and remove dividing wall btwn dining and kitchen. remodel two existing bathrooms. replace doors and windows at rear wall. refinish flooringDetails
1st fl: add office, bedroom and bathroom. enclose entryway 2nd fl: remodel (e) kitchen and remove dividing wall btwn dining and kitchen. remodel two existing bathrooms. replace doors and windows at rear wall. refinish flooring | $200,000 |
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 1351 45th Av | Actually Design Build Inc | new rear deck with firewall. new exterior deck at level 3. remove interior secondary staircase & patch fl.Details
new rear deck with firewall. new exterior deck at level 3. remove interior secondary staircase & patch fl. | $40,000 |
| Dec 18, 2024 | Completed final sign-off Jul 2025 | 174 Santa Rosa Av | Actually Design Build Inc | relocate/remodel kitchen,remove wall between dining and living room. remodel (e) bathroom. add sink in toilet room. all work on second floor. add (n) skylight located in hallway not visible from street.Details
relocate/remodel kitchen,remove wall between dining and living room. remodel (e) bathroom. add sink in toilet room. all work on second floor. add (n) skylight located in hallway not visible from street. | $70,000 |
| Oct 25, 2024 | Completed final sign-off Mar 2025 | 650 46th Av | Actually Design Build Inc | revision to pa# 202312112256, remove 1 skylight, add 2 skylights over stairs, remove 2 windows at rear wall. change window to sliding door at rear wall.Details
revision to pa# 202312112256, remove 1 skylight, add 2 skylights over stairs, remove 2 windows at rear wall. change window to sliding door at rear wall. | |
| Sep 5, 2024 | Completed final sign-off Feb 2025 | 1340 38th Av | Actually Design Build Inc | remodel existing bathroom, add guest bathroom. replace one window at rear wall. add 2 (n) skylightsDetails
remodel existing bathroom, add guest bathroom. replace one window at rear wall. add 2 (n) skylights | $45,000 |
| Aug 29, 2024 | Completed final sign-off Jun 2025 | 1643 44th Av | Actually Design Build Inc | revision to pa # 2023-0627-0938 structural framing revisionsDetails
revision to pa # 2023-0627-0938 structural framing revisions | $1,000 |
| Aug 15, 2024 | Expired or cancelled expired Sep 2026 | 2542 Great Hy | Chl Construction Company | remove wall betweek kitchen/dining on 2nd flrDetails
remove wall betweek kitchen/dining on 2nd flr | $30,000 |
| Aug 15, 2024 | Completed final sign-off May 2025 | 1686 35th Av | Actually Design Build Inc | remove extg interior stair & add level 2 office nook. reconfigure extg level 2 bedroom to add nw interior stair. add family room, office, 2 bathrooms & laundry at level 1. add 2 slider doors at level one to backyard. replace retaining walls at rear yard.Details
remove extg interior stair & add level 2 office nook. reconfigure extg level 2 bedroom to add nw interior stair. add family room, office, 2 bathrooms & laundry at level 1. add 2 slider doors at level one to backyard. replace retaining walls at rear yard. | $100,000 |
| Jan 18, 2024 | Completed final sign-off Jul 2024 | 348 Magellan Av | Actually Design Build Inc | demo kitchen cabinets and dividing wall between kitchen and dining room, install new cabinets, fixtures, appliances, add kitchen island, replace exterior dining room door and kitchen windows @ rear.Details
demo kitchen cabinets and dividing wall between kitchen and dining room, install new cabinets, fixtures, appliances, add kitchen island, replace exterior dining room door and kitchen windows @ rear. | $40,000 |
| Dec 11, 2023 | Completed final sign-off Mar 2025 | 650 46th Av | Actually Design Build Inc | 1/f build out including bedroom, family room, bathroom and laundry closet. new interior stairs. structural work included.Details
1/f build out including bedroom, family room, bathroom and laundry closet. new interior stairs. structural work included. | $200,000 |
| Oct 24, 2023 | Completed final sign-off Apr 2024 | 491 27th St | Actually Design Build Inc | widen garage door opening 12". replace one wood window at front elevation. install new garage door. structural work included.Details
widen garage door opening 12". replace one wood window at front elevation. install new garage door. structural work included. | $30,000 |
| Sep 28, 2023 | Completed final sign-off Jun 2024 | 1887 45th Av | Actually Design Build Inc | add living room, bedroom & bathroom at 1st fl. add interior staircase to 1st fl. replace rear wall window and add exterior door. replace rear wood siding. add skylight.Details
add living room, bedroom & bathroom at 1st fl. add interior staircase to 1st fl. replace rear wall window and add exterior door. replace rear wood siding. add skylight. | $150,000 |
| Aug 10, 2023 | Completed final sign-off Apr 2024 | 2608 Diamond St | Actually Design Build Inc | conversion one bedroom and remodel one bathroom at ground floor. replace windows on rear exterior at ground floor. remove exterior door and replace with window on level 2 at rear wall.Details
conversion one bedroom and remodel one bathroom at ground floor. replace windows on rear exterior at ground floor. remove exterior door and replace with window on level 2 at rear wall. | $80,000 |
| Jul 13, 2023 | Completed final sign-off Oct 2023 | 470 Pacific Av | Cookline Construction Inc | revision to pa# 202304206094, existing mua unit on roof to remain, associated mech, elec & lsf revisions.Details
revision to pa# 202304206094, existing mua unit on roof to remain, associated mech, elec & lsf revisions. | |
| Jun 27, 2023 | Completed final sign-off Jun 2025 | 1643 44th Av | Actually Design Build Inc | add bedroom, family room & bath @ grounf fl. relocate kitchen @ 2nd fl, remodel bathroom & add laundry room. add 3rd fl with three bedrooms & 2 baths. replacement of front windows and doors. infill lightwell on northside and new rear deck.Details
add bedroom, family room & bath @ grounf fl. relocate kitchen @ 2nd fl, remodel bathroom & add laundry room. add 3rd fl with three bedrooms & 2 baths. replacement of front windows and doors. infill lightwell on northside and new rear deck. | $300,000 |
| Jun 22, 2023 | Completed final sign-off Jul 2023 | 2736 44th Av | Mireles Construction Inc | revision to pa# 202203049243, to remove skylight from scope of workDetails
revision to pa# 202203049243, to remove skylight from scope of work | |
| May 3, 2023 | Completed final sign-off Sep 2023 | 3926 Irving St | Actually Design Build Inc | revision to permit 202108126354. rear stair to be spiral staircase. remove existing window/door at rear wall.Details
revision to permit 202108126354. rear stair to be spiral staircase. remove existing window/door at rear wall. | |
| Apr 27, 2023 | Completed final sign-off Oct 2023 | 1870 47th Av | Actually Design Build Inc | kitchen and bathroom remodel- demo west wall of kitchen, add peninsula, all new fixtures and finishes, bathroom- all new finishes and tile. reroof flat roof only. no structural work -reroofing onlyDetails
kitchen and bathroom remodel- demo west wall of kitchen, add peninsula, all new fixtures and finishes, bathroom- all new finishes and tile. reroof flat roof only. no structural work -reroofing only | $85,000 |
| Apr 20, 2023 | Completed final sign-off Oct 2023 | 470 Pacific Av | Cookline Construction Inc | new hearth in (e) kitchen w/associated mep (fan/flue to roof) using coal max 250 lbs storage. fire alarm/sprinklers/hood & duct suppression system all under separate permits.Details
new hearth in (e) kitchen w/associated mep (fan/flue to roof) using coal max 250 lbs storage. fire alarm/sprinklers/hood & duct suppression system all under separate permits. | $30,000 |
| Oct 26, 2022 | Expired or cancelled withdrawn Aug 2024 | 2542 Great Hy | remove wall between kitchen/dining rm. remodel kitchen, new cabinetry, appliances, finishes. remodel bath, replace finishes and plumbing fixtures. no exterior changes.Details
remove wall between kitchen/dining rm. remodel kitchen, new cabinetry, appliances, finishes. remodel bath, replace finishes and plumbing fixtures. no exterior changes. | $35,000 | |
| Sep 28, 2022 | Expired or cancelled withdrawn Aug 2023 | 152 Beaver St | remodel of (e) upper unit 152 (3rd fl) and add new story. relocate kitchen from 3/f to new 4th fl. add bathroom & bedroom at 3/f. add staircase from 3/f to 4/f. 4/f to have powder room, office, living room and kitchen. new windows/doors at 4th fl. new roof. new roof deck. new stucco siding at 4/f.Details
remodel of (e) upper unit 152 (3rd fl) and add new story. relocate kitchen from 3/f to new 4th fl. add bathroom & bedroom at 3/f. add staircase from 3/f to 4/f. 4/f to have powder room, office, living room and kitchen. new windows/doors at 4th fl. new roof. new roof deck. new stucco siding at 4/f. | $200,000 | |
| Sep 16, 2022 | Never finaled issued Sep 2022, no final | 566 20th Av | add address 566a 20th ave for pa 202102044033Details
add address 566a 20th ave for pa 202102044033 | ||
| Aug 11, 2022 | Completed final sign-off Sep 2023 | 1550 45th Av | Actually Design Build Inc | revision to pa# 202012080507. replace front exterior stair and north retaining wall.Details
revision to pa# 202012080507. replace front exterior stair and north retaining wall. | $10,000 |
| Jul 28, 2022 | Completed final sign-off Sep 2023 | 1550 45th Av | Actually Design Build Inc | revision to pa# 202012080507- replace foundation at entry way and north perimeter wall. replace deteriorated framing at rear north/south perimeter waslls and north entry way walls. remove window 105. add windoww 212./ exterior siding to be wood shingles.Details
revision to pa# 202012080507- replace foundation at entry way and north perimeter wall. replace deteriorated framing at rear north/south perimeter waslls and north entry way walls. remove window 105. add windoww 212./ exterior siding to be wood shingles. | $15,000 |
| Jul 15, 2022 | Never finaled issued Jul 2022, no final | 566 20th Av | Actually Design Build Inc | revision to 202102044033: add exterior stair from 2nd fl deck to rear yard. remove and replace brick at front facadeDetails
revision to 202102044033: add exterior stair from 2nd fl deck to rear yard. remove and replace brick at front facade | $15,000 |
| Jun 30, 2022 | Completed final sign-off Dec 2022 | 491 27th St | Actually Design Build Inc | remodel (e) bathroom. relocate 2 interior walls to make bathroom larger. replace sliding door with new window in (e) bedroom (rear elevation). replace window with new bifold door in living room (rear elevation).Details
remodel (e) bathroom. relocate 2 interior walls to make bathroom larger. replace sliding door with new window in (e) bedroom (rear elevation). replace window with new bifold door in living room (rear elevation). | $50,000 |
| May 10, 2022 | Never finaled issued May 2022, no final | 566 20th Av | Actually Design Build Inc | revision to permit #202102044033. add 5' patio at rear yard level 1. add 5' retaining wall & stairs up to rear yard grade. add stairs from level 2 deck down to rear yard. at 1st floor: move wall at grid line b 3' to east and align wall at grid line c with walls above. at 3rd fl: change window w308Details
revision to permit #202102044033. add 5' patio at rear yard level 1. add 5' retaining wall & stairs up to rear yard grade. add stairs from level 2 deck down to rear yard. at 1st floor: move wall at grid line b 3' to east and align wall at grid line c with walls above. at 3rd fl: change window w308 | $5,000 |
| May 3, 2022 | Never finaled issued May 2022, no final | 2179 44th Av | Actually Design Build Inc | revision to pa# 202204132110. structural detail updated to show accurate location of new footing in relation to existing footings.Details
revision to pa# 202204132110. structural detail updated to show accurate location of new footing in relation to existing footings. | $500 |
| Apr 19, 2022 | Completed final sign-off Jun 2022 | 1409 Minnesota St | Plant Construction Co, Lp | ref to t.i. 202104239279. mep only. electrical distribution for ti work, add ducting to (e) hvac unitsDetails
ref to t.i. 202104239279. mep only. electrical distribution for ti work, add ducting to (e) hvac units | $60,000 |
| Mar 21, 2022 | Expired or cancelled cancelled Jan 2026 | 1658 Florida St | relocate and rebuild front stairs to the home that are in need of repair and also in need of relocation for safe and functional access to down stairs front unit/front door access.Details
relocate and rebuild front stairs to the home that are in need of repair and also in need of relocation for safe and functional access to down stairs front unit/front door access. | $8,000 | |
| Mar 9, 2022 | Never finaled issued Sep 2023, no final | 2100 46th Av | add 3rd story. addition to include 2 bedrooms. add internal staircase from 2nd fl to 3rd fl. new roof deck at 2nd fl. legalize (e) office, bedroom & bathroom at 1st fl.Details
add 3rd story. addition to include 2 bedrooms. add internal staircase from 2nd fl to 3rd fl. new roof deck at 2nd fl. legalize (e) office, bedroom & bathroom at 1st fl. | $175,000 | |
| Mar 4, 2022 | Completed final sign-off Jul 2023 | 2736 44th Av | Mireles Construction Inc | new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east)Details
new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east) | $100,000 |
| Dec 14, 2021 | Completed final sign-off Mar 2024 | 1371 40th Av | Tosick Remodels | add bathroom office and bedroom at ground floor. provide new wood flooring, new bathroom fixtures and tile, dry wall throughout including garage. replace extg slider door with wood french doors at rear elevation. no structural work.Details
add bathroom office and bedroom at ground floor. provide new wood flooring, new bathroom fixtures and tile, dry wall throughout including garage. replace extg slider door with wood french doors at rear elevation. no structural work. | $40,000 |
| Oct 20, 2021 | Expired or cancelled withdrawn Jul 2025 | 1250 42nd Av | add 3rd story to (e) house, including (3) bedrooms & (2) bathrooms, add internal staircase from 2nd floor to 3rd floor.Details
add 3rd story to (e) house, including (3) bedrooms & (2) bathrooms, add internal staircase from 2nd floor to 3rd floor. | $150,000 | |
| Oct 13, 2021 | Completed final sign-off Dec 2021 | 4542 Irving St | remodel front of house area to improve finisehs to include. add tile over (e) concrete floors, add eco-grip flooring to kitchen area. add tile on walls inkitchen and wood paneling in customer area. replace wood coutners with concrete counters,replace vandalized front window,replace front door.Details
remodel front of house area to improve finisehs to include. add tile over (e) concrete floors, add eco-grip flooring to kitchen area. add tile on walls inkitchen and wood paneling in customer area. replace wood coutners with concrete counters,replace vandalized front window,replace front door. | $35,000 | |
| Sep 27, 2021 | Completed final sign-off Mar 2022 | 1309 19th Av | Actually Design Build Inc, Actually Design Build | units 1309 & 1311: remove wall between kitchen/mudroom, relocate door opening into kitchen, replace kitchen flooring, cabinetry, plumbing fixtures & tile. reinish wood flooring, replace aluminum windows w/wood double hung windows @ rear elevation (6) totalDetails
units 1309 & 1311: remove wall between kitchen/mudroom, relocate door opening into kitchen, replace kitchen flooring, cabinetry, plumbing fixtures & tile. reinish wood flooring, replace aluminum windows w/wood double hung windows @ rear elevation (6) total | $75,000 |
| Aug 12, 2021 | Completed final sign-off Sep 2023 | 3926 Irving St | tenant improvement. remove partial interior wall. install new oven. new accessible bathroom. new cabinets and countertops. new dishwashing, mop and handwashing sinks. new storage closet. demo (e) interior staircase to first floor laundry area. relocate laundry to 2nd fl. build exterior staircase.Details
tenant improvement. remove partial interior wall. install new oven. new accessible bathroom. new cabinets and countertops. new dishwashing, mop and handwashing sinks. new storage closet. demo (e) interior staircase to first floor laundry area. relocate laundry to 2nd fl. build exterior staircase. | $140,000 | |
| Jun 23, 2021 | Completed final sign-off Feb 2024 | 1658 Florida St | unit 1660: add one skylight. unit 1658: add one skylight.Details
unit 1660: add one skylight. unit 1658: add one skylight. | $3,500 | |
| Apr 23, 2021 | Completed final sign-off Jun 2022 | 1409 Minnesota St | Actually Design Build, Plant Construction Co, Lp | add accessible bathroooms and sinks. interior wall framing, electrical, plumbing and drywall included. new plumbing fixtures and cabinetry to be installed.Details
add accessible bathroooms and sinks. interior wall framing, electrical, plumbing and drywall included. new plumbing fixtures and cabinetry to be installed. | $50,000 |
| Apr 23, 2021 | Completed final sign-off Jul 2024 | 348 Magellan Av | Actually Design Build | add 1 skylight in master bathroom. patch drywall as needed.Details
add 1 skylight in master bathroom. patch drywall as needed. | $1,500 |
| Apr 22, 2021 | Completed final sign-off Sep 2021 | 3732 Kirkham St | Actually Design Build | revision to pa 202102023849. 2nd fl bathroom remodel removed from scope. (e) finishes to remain. load bearing wall at 1/f to remain. new back door reduced to 6' width. 2nd fl windows to remain.Details
revision to pa 202102023849. 2nd fl bathroom remodel removed from scope. (e) finishes to remain. load bearing wall at 1/f to remain. new back door reduced to 6' width. 2nd fl windows to remain. | $500 |
| Apr 9, 2021 | Completed final sign-off Feb 2024 | 1658 Florida St | relocate and remodel kitchen. remodel bathrm. reconfig interior walls to move kitchen and living rm to s. side. add double door and replace windows at bact (west) elevation. new kitchen/bathrom finishes: cabinets, countertops, plumbing fixtures, drywall, tile.Details
relocate and remodel kitchen. remodel bathrm. reconfig interior walls to move kitchen and living rm to s. side. add double door and replace windows at bact (west) elevation. new kitchen/bathrom finishes: cabinets, countertops, plumbing fixtures, drywall, tile. | $60,000 | |
| Mar 17, 2021 | Completed final sign-off Aug 2021 | 1894 48th Av | Actually Design Build Inc | revision to pa# 202101062193. structural revision to cracked foundation, and psl beam and stair. architectural revision to stair replace in kind.Details
revision to pa# 202101062193. structural revision to cracked foundation, and psl beam and stair. architectural revision to stair replace in kind. | $5,000 |
| Feb 10, 2021 | Expired or cancelled cancelled Jan 2026 | 1924 Great Hy | revision to pa# 202001242705 to keep existing stairs per direction of building inspector. stairs as drawn do not fit in existing envelope.Details
revision to pa# 202001242705 to keep existing stairs per direction of building inspector. stairs as drawn do not fit in existing envelope. | ||
| Feb 4, 2021 | Never finaled issued Dec 2021, no final | 566 20th Av | Actually Design Build Inc | rear extension of 3-story. add unit @ ground fl. reconfigure kitchen, dining & bath @ 2nd fl. roof deck @ rear of 2nd fl. add master suite including bedrm & bathrm, laundry & closets @ 3rd fl. remove wood trim @ front elevation (not original) & patch plaster as needed.Details
rear extension of 3-story. add unit @ ground fl. reconfigure kitchen, dining & bath @ 2nd fl. roof deck @ rear of 2nd fl. add master suite including bedrm & bathrm, laundry & closets @ 3rd fl. remove wood trim @ front elevation (not original) & patch plaster as needed. | $200,000 |
| Feb 2, 2021 | Completed final sign-off Sep 2021 | 3732 Kirkham St | Actually Design Build | remove wall between kitchen/dining room. replace kitchen finishes. replace 2nd fl bathroom finishes. add family room, bathroom & laundry closet at 1st fl. replace 3 windows & 2 doors at rear. add 2 skylights.Details
remove wall between kitchen/dining room. replace kitchen finishes. replace 2nd fl bathroom finishes. add family room, bathroom & laundry closet at 1st fl. replace 3 windows & 2 doors at rear. add 2 skylights. | $100,000 |
| Jan 6, 2021 | Completed final sign-off Aug 2021 | 1894 48th Av | Actually Design Build Inc | revision to no-plans pa's 202012140906 & 202012281741. add shear walls, refinish bathroom & bedroom downstairs, add washer dryer, repair footings. replace lateral, repair dryrot/plaster, replace windows.Details
revision to no-plans pa's 202012140906 & 202012281741. add shear walls, refinish bathroom & bedroom downstairs, add washer dryer, repair footings. replace lateral, repair dryrot/plaster, replace windows. | $20,000 |
| Dec 8, 2020 | Completed final sign-off Sep 2023 | 1550 45th Av | Actually Design Build Inc, Actually Design Build | reconfigure 1st fl: relocate kitchen, bathroom, add office & staircase to (n) 2nd fl. add 2nd story including (3) bedrooms & (2) baths. replace all doors & windows. (n) stucco & wood siding @ (n) addition. (n) roof. rear extension of footprint (53 sq ft)Details
reconfigure 1st fl: relocate kitchen, bathroom, add office & staircase to (n) 2nd fl. add 2nd story including (3) bedrooms & (2) baths. replace all doors & windows. (n) stucco & wood siding @ (n) addition. (n) roof. rear extension of footprint (53 sq ft) | $350,000 |
| Nov 24, 2020 | Completed final sign-off Aug 2021 | 224 Roanoke St | Actually Design Build | add 315 sq ft of conditioned space at ground floor inclu fam room, bath, laundry. pour new slab & replace windows. add shear wall.Details
add 315 sq ft of conditioned space at ground floor inclu fam room, bath, laundry. pour new slab & replace windows. add shear wall. | $80,000 |
| Jun 24, 2020 | Completed final sign-off Dec 2020 | 456 Clementina St | Actually Design Build | first fl: add two offices and conference room, add built-in storage cabinets, add storage room in garage, add electrical outlets and lightings for new offices, conference room and storage room, intall 6 skylights at (e) roof, 2nd fl: remove/relocate two partition walls, relocate door to bathroom #2Details
first fl: add two offices and conference room, add built-in storage cabinets, add storage room in garage, add electrical outlets and lightings for new offices, conference room and storage room, intall 6 skylights at (e) roof, 2nd fl: remove/relocate two partition walls, relocate door to bathroom #2 | $200,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 1475 30th Av | Actually Design Build | kitchen remodel including: replace tile flooring in kitchen & mudroom. replace cabinetry and countertops and appliances. relocate 2 interior door openings in kitchen. add new lights and power outlets. patch & paint plaster/drywall.Details
kitchen remodel including: replace tile flooring in kitchen & mudroom. replace cabinetry and countertops and appliances. relocate 2 interior door openings in kitchen. add new lights and power outlets. patch & paint plaster/drywall. | $50,000 |
| Jan 24, 2020 | Completed final sign-off Apr 2021 | 1924 Great Hy | remodel existing kitchen and bathroom at 2nd floor. add master bedroom and reconfigure bedrooms on 2nd floor. add 441 sq ft of conditioned space at ground floor including bedroom, bathroom, and family room including wet bar. replace all windows and add 2 skylightsDetails
remodel existing kitchen and bathroom at 2nd floor. add master bedroom and reconfigure bedrooms on 2nd floor. add 441 sq ft of conditioned space at ground floor including bedroom, bathroom, and family room including wet bar. replace all windows and add 2 skylights | $160,000 | |
| Nov 18, 2019 | Completed final sign-off Jun 2020 | 491 27th St | Actually Design Build | remodel existing ground floor. relocate existing bathroom and closet. replace carpet with hardwood floooring. replace all bathroom finishes. replace drywall and trim as needed. no work on 2nd floor. no work on exterior or structural work.Details
remodel existing ground floor. relocate existing bathroom and closet. replace carpet with hardwood floooring. replace all bathroom finishes. replace drywall and trim as needed. no work on 2nd floor. no work on exterior or structural work. | $30,000 |
| Nov 4, 2019 | Expired or cancelled cancelled Jul 2024 | 37 Grattan St | 1st and 2nd floor addition at back of house. 1st floor to include new bedroom, bathroom and family room. 2nd floor addition to include new bedroom, bathroom laundry room and sunroom. remodel existing kitchen at 2nd floor and add half bathroom. include new interior stair connecting 1st and 2nd floorDetails
1st and 2nd floor addition at back of house. 1st floor to include new bedroom, bathroom and family room. 2nd floor addition to include new bedroom, bathroom laundry room and sunroom. remodel existing kitchen at 2nd floor and add half bathroom. include new interior stair connecting 1st and 2nd floor | $100,000 | |
| Sep 26, 2019 | Completed final sign-off Jan 2020 | 523 Octavia St | Gartan Construction | replace plm fixtures on 3 bathrooms. paint all interior and exterior surfaces. replace carpeting throughout 1st & 2nd flr. replace shower pan, tile glass at (e) shower. demo enclosed stair and closet at 1st flr to create hallway connecting entryway to waiting roomDetails
replace plm fixtures on 3 bathrooms. paint all interior and exterior surfaces. replace carpeting throughout 1st & 2nd flr. replace shower pan, tile glass at (e) shower. demo enclosed stair and closet at 1st flr to create hallway connecting entryway to waiting room | $25,000 |
| Apr 16, 2019 | Completed final sign-off Jun 2020 | 1423 44th Av | Actually Design Build Inc | 1st fl - add bedroom, bathroom and family room. adding 571 of conditioned space. rebuild staircast to 2st fl to be code compliant; 3rd fl - remodel bathroom. replace electrical and plumbing as needed. replace windows to match original wood windowsDetails
1st fl - add bedroom, bathroom and family room. adding 571 of conditioned space. rebuild staircast to 2st fl to be code compliant; 3rd fl - remodel bathroom. replace electrical and plumbing as needed. replace windows to match original wood windows | $150,000 |
| Jun 1, 2018 | Completed final sign-off Jul 2021 | 1429 46th Av | Actually Design Build | provide two story addition to back (west) of the existing house. new addition to include a family room at the 1st fl and a bedroom at the 2nd floorDetails
provide two story addition to back (west) of the existing house. new addition to include a family room at the 1st fl and a bedroom at the 2nd floor | $65,000 |
| Mar 16, 2018 | Completed final sign-off Feb 2019 | 1429 46th Av | Actually Design Build | replace windows at north and south elevations. provide interior staircase connecting 1st & 2nd floor. provide seismic strengthening. add bedroom and bathroom at 1st floor. remodel kitchen & bathroom at 2nd floor.Details
replace windows at north and south elevations. provide interior staircase connecting 1st & 2nd floor. provide seismic strengthening. add bedroom and bathroom at 1st floor. remodel kitchen & bathroom at 2nd floor. | $120,000 |
| Feb 26, 2018 | Completed final sign-off Jul 2019 | 222 Eucalyptus Dr | Actually Design Build | add adu to (e) 1st fl within (e) bldg footprint per ord# 95-17. including 1 bed, 1 bath and 1 kitchen.Details
add adu to (e) 1st fl within (e) bldg footprint per ord# 95-17. including 1 bed, 1 bath and 1 kitchen. | $100,000 |
| Feb 23, 2018 | Expired or cancelled cancelled Jan 2026 | 222 Eucalyptus Dr | seismic strengthening @ ground floorDetails
seismic strengthening @ ground floor | $28,000 | |
| Nov 13, 2017 | Completed final sign-off Apr 2018 | 3600 Lawton St | Actually Design Build Inc | enlarge window opening and install new alum. /glass window, new entry door & hardwar - as path of travel upgrade. replace vinyl siding with woood=ing siding around new window.Details
enlarge window opening and install new alum. /glass window, new entry door & hardwar - as path of travel upgrade. replace vinyl siding with woood=ing siding around new window. | $10,000 |
| Nov 1, 2017 | Expired or cancelled withdrawn Mar 2018 | 2646 San Bruno Av | remodel of existing restaurant space to creamery: some demolition. new finishes and equipment, new flooring, add in seating. electrical and plumbing work. maher naDetails
remodel of existing restaurant space to creamery: some demolition. new finishes and equipment, new flooring, add in seating. electrical and plumbing work. maher na | $150,000 | |
| May 29, 2014 | Completed final sign-off Apr 2015 | 1359 48th Av | bathroom remodel - replace tile floor and in shower, replace drywall (1 wall), new medicine cabinet install, new bathroom sink install. kitchen remodel - new lower cabinets, new appliances, new tile backsplash, new (2 walls) drywall. general - refinish wood floorsDetails
bathroom remodel - replace tile floor and in shower, replace drywall (1 wall), new medicine cabinet install, new bathroom sink install. kitchen remodel - new lower cabinets, new appliances, new tile backsplash, new (2 walls) drywall. general - refinish wood floors | $20,000 |