Permit GraphShortlistSan Francisco building permits since 2000

Actually Design Build

Contractor license
1035799
State license record
Based in
San Francisco
On San Francisco permits
May 2017 to Sep 2021
Last 24 months
0 permits filed

18 permits since 2000: 18 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 1Stairs 2Kitchen remodel 6Bathroom remodel 12

2 stairs permits: 2 completed. Typically 218 days from filing to permit and 460 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 8, 2020Completed
final sign-off Sep 2023
1550 45th Avreconfigure 1st fl: relocate kitchen, bathroom, add office & staircase to (n) 2nd fl. add 2nd story including (3) bedrooms & (2) baths. replace all doors & windows. (n) stucco & wood siding @ (n) addition. (n) roof. rear extension of footprint (53 sq ft)
Details
Permit
202012080507
Status
complete
Filed
Dec 8, 2020
Permit issued
Jan 14, 2022
Final sign-off
Sep 27, 2023
Declared cost
$350,000
Address
1550 45th Av

reconfigure 1st fl: relocate kitchen, bathroom, add office & staircase to (n) 2nd fl. add 2nd story including (3) bedrooms & (2) baths. replace all doors & windows. (n) stucco & wood siding @ (n) addition. (n) roof. rear extension of footprint (53 sq ft)

Open the permit page

$350,000
Mar 16, 2018Completed
final sign-off Feb 2019
1429 46th Avreplace windows at north and south elevations. provide interior staircase connecting 1st & 2nd floor. provide seismic strengthening. add bedroom and bathroom at 1st floor. remodel kitchen & bathroom at 2nd floor.
Details
Permit
201803163929
Status
complete
Filed
Mar 16, 2018
Permit issued
Apr 20, 2018
Final sign-off
Feb 13, 2019
Declared cost
$120,000
Address
1429 46th Av

replace windows at north and south elevations. provide interior staircase connecting 1st & 2nd floor. provide seismic strengthening. add bedroom and bathroom at 1st floor. remodel kitchen & bathroom at 2nd floor.

Open the permit page

$120,000