Peter Rosenthal
- Listed as
- authorized agent-others, contractor
- Firm
- Buzzer 9 Development Inc
- Based in
- Sausalito
- On San Francisco permits
- Jan 2014 to Jan 2025
26 permits since 2000 (contractor on 26 permits, authorized agent-others on 1 permit): 18 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 17, 2025 | In progress issued Feb 2025 | 3106 Gough St | Buzzer 9 Development Inc | voluntary seismic strengthening of ground fl/ 1st fl levelDetails
voluntary seismic strengthening of ground fl/ 1st fl level | $15,000 |
| Jan 2, 2025 | In progress issued Sep 2025 | 500 Castro St | Buzzer 9 Development Inc | prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors.Details
prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors. | $550,000 |
| Mar 15, 2024 | Completed final sign-off May 2024 | 16 Guerrero St | Buzzer 9 Development Inc | change of use and occupancy to convert a ground floor retail store to a hair studio . add (1) new sinkDetails
change of use and occupancy to convert a ground floor retail store to a hair studio . add (1) new sink | $3,000 |
| Dec 20, 2023 | In progress filed Dec 2023, not yet issued | 1220 Church St | Buzzer 9 Development Inc | interior demolition of drywall and plaster for structural observaton repair in kindDetails
interior demolition of drywall and plaster for structural observaton repair in kind | $3,000 |
| Oct 3, 2023 | Completed final sign-off Jul 2024 | 1809 Gough St | Buzzer 9 Development Inc | remodel of (e) 1st and 2nd level condo in area of bedrooms, baths, study, hall, kitchen & family rm. addition of washer/dryer at 2nd level. replace 3 windows in kind. remove (e) balcony at 2nd level on side yard. extend wood deck at side yard at less than 30" above grade. new elec/plumbing at areasDetails
remodel of (e) 1st and 2nd level condo in area of bedrooms, baths, study, hall, kitchen & family rm. addition of washer/dryer at 2nd level. replace 3 windows in kind. remove (e) balcony at 2nd level on side yard. extend wood deck at side yard at less than 30" above grade. new elec/plumbing at areas | $185,000 |
| May 2, 2023 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | add new concrete footings in the rear of the buildingDetails
add new concrete footings in the rear of the building | $15,000 |
| Jan 10, 2023 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | revision to permit #202205043540 & #202210315571. 3/f: interior layout change. add (3) dormers to roof.Details
revision to permit #202205043540 & #202210315571. 3/f: interior layout change. add (3) dormers to roof. | $10,000 |
| Oct 31, 2022 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | new exterior stair at rear of property, convert roof at rear to habitable deck on 2nd floor, add guardrails around deck, replace window with door. add (1) new dormer to roof at chenery street side. minor modifications to rear exterior window frame materials.Details
new exterior stair at rear of property, convert roof at rear to habitable deck on 2nd floor, add guardrails around deck, replace window with door. add (1) new dormer to roof at chenery street side. minor modifications to rear exterior window frame materials. | $20,000 |
| Oct 31, 2022 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | revision to 202205043540. modify 2nd fl height & structure, minor layout chenge to accomodate modify roof joist depths and fl joist depthsDetails
revision to 202205043540. modify 2nd fl height & structure, minor layout chenge to accomodate modify roof joist depths and fl joist depths | |
| Oct 21, 2022 | Completed final sign-off Aug 2023 | 12 Retiro Wy | Buzzer 9 Development Inc | replacement 8 front windows with wood casement windows.Details
replacement 8 front windows with wood casement windows. | $10,000 |
| Sep 20, 2022 | Expired or cancelled withdrawn Oct 2023 | 12 Retiro Wy | Buzzer 9 Development Inc | in kind kitchen and bathroom renovation at 14 retiro way.Details
in kind kitchen and bathroom renovation at 14 retiro way. | $10,000 |
| May 4, 2022 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | interior remodel to existing mixed use building. minor exterior improvements to include window and siding replacment. add dormer. 1/f ti under separate permitDetails
interior remodel to existing mixed use building. minor exterior improvements to include window and siding replacment. add dormer. 1/f ti under separate permit | $50,000 |
| Oct 6, 2021 | Completed final sign-off Sep 2022 | 908 Cabrillo St | Buzzer 9 Development Inc | adding cement footing to middle spine of house non-stuctural closet framing on second story rev to pa#2021-0607-1791Details
adding cement footing to middle spine of house non-stuctural closet framing on second story rev to pa#2021-0607-1791 | $5,000 |
| Jun 23, 2021 | Completed final sign-off Sep 2022 | 908 Cabrillo St | Buzzer 9 Development Inc | removal of fire damage drywall as needed for structural observation, replace drywall in kind afterwards. any structural work in a separate permit application.Details
removal of fire damage drywall as needed for structural observation, replace drywall in kind afterwards. any structural work in a separate permit application. | $5,000 |
| Jun 7, 2021 | Completed final sign-off Sep 2022 | 908 Cabrillo St | Buzzer 9 Development Inc | fire repair. replace damaged interior finishes w/ new, typical to 1st and 2nd flrs. replace damaged walls on 2nd flr. replace damaged roof rafters.Details
fire repair. replace damaged interior finishes w/ new, typical to 1st and 2nd flrs. replace damaged walls on 2nd flr. replace damaged roof rafters. | $150,000 |
| Mar 17, 2021 | Never finaled issued Nov 2021, no final | 24 Presidio Av | Buzzer 9 Development Inc | demo plaster & drywall to studs. remove cabinetry & fireplace as required. add 91 can lights. upgrade electrical in kitchen & baths. new drywall throughout. new molding/base/case/crown. new cabinetry & custom closets. new bath fixtures, tile & hardwood.Details
demo plaster & drywall to studs. remove cabinetry & fireplace as required. add 91 can lights. upgrade electrical in kitchen & baths. new drywall throughout. new molding/base/case/crown. new cabinetry & custom closets. new bath fixtures, tile & hardwood. | $600,000 |
| Nov 25, 2020 | Completed final sign-off Nov 2022 | 2566 35th Av | Buzzer 9 Development Inc | 2/f:reconfigure (e) bathroom, closet & add 2nd bathroom. 1/f: add full bathroom & recessed entry door. replace windows, skylights, lights & electrical.Details
2/f:reconfigure (e) bathroom, closet & add 2nd bathroom. 1/f: add full bathroom & recessed entry door. replace windows, skylights, lights & electrical. | $150,000 |
| Dec 6, 2019 | Completed final sign-off Oct 2020 | 2054 34th Av | Buzzer 9 Development Inc | kitchen remodel. relocate 1 bath at 2nd fl. re-configure bedrooms and add full master bath. replace 2 front windows & 3 rear windows and water heater. add drywall at ground fl. remove rear patio & construction new rear stair,Details
kitchen remodel. relocate 1 bath at 2nd fl. re-configure bedrooms and add full master bath. replace 2 front windows & 3 rear windows and water heater. add drywall at ground fl. remove rear patio & construction new rear stair, | $150,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 3749 Scott St | Buzzer 9 Development Inc | bathroom remodel. no structural 7 ft by 8 ft.Details
bathroom remodel. no structural 7 ft by 8 ft. | $16,061 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 3749 Scott St | Buzzer 9 Development Inc | remodel (e) kitchen & dining roommDetails
remodel (e) kitchen & dining roomm | $65,000 |
| Mar 19, 2019 | Completed final sign-off Sep 2019 | 1629 Jackson St | Buzzer 9 Development Inc | install demising wall & ada restroom; rewire & replace (e) lights.Details
install demising wall & ada restroom; rewire & replace (e) lights. | $60,000 |
| Sep 11, 2018 | Completed final sign-off Sep 2019 | 1629 Jackson St | Buzzer 9 Development Inc | to comply with accessible business entrance ordinance 51-16. provide ramp & door buttonsDetails
to comply with accessible business entrance ordinance 51-16. provide ramp & door buttons | $20,000 |
| Aug 31, 2018 | Completed final sign-off Sep 2019 | 1627 Jackson St | Buzzer 9 Development Inc | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201808318958Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201808318958 | $60,000 |
| Aug 31, 2018 | Completed final sign-off Sep 2019 | 1629 Jackson St | Buzzer 9 Development Inc | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201808318959Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201808318959 | $60,000 |
| Jan 24, 2014 | Completed final sign-off Feb 2014 | 17 Palm Av | Buzzer 9 Development Inc | to comply with physycal inspection report # cc-7472, restore 6x6 post in garage, wrap duct work in gargae with r-3 insulation repair stacks on roof,the 2 downpouts to sewer.electric & plumbing on seperate permits.Details
to comply with physycal inspection report # cc-7472, restore 6x6 post in garage, wrap duct work in gargae with r-3 insulation repair stacks on roof,the 2 downpouts to sewer.electric & plumbing on seperate permits. | $13,000 |
| Jan 9, 2014 | Expired or cancelled cancelled Feb 2014 | 1571 11th Av | Buzzer 9 Development Inc | dry rot repair at rear of house.Details
dry rot repair at rear of house. | $5,300 |