Block 1649, lot 010
759 06th Ave
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 20
- Rooms
- 25 bathrooms
- Building
- 13,389 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2026 | Completed final sign-off Aug 2026 | 759 06th Av | Elemental Builders Incorporated | to comply with nov# 202650804 items 2 and 5: stucco replacement at the front of building and staircase repair (less than 50% repair) at the rear.Details
to comply with nov# 202650804 items 2 and 5: stucco replacement at the front of building and staircase repair (less than 50% repair) at the rear. | $10,000 |
| Dec 4, 2025 | In progress issued Dec 2025 | 759 06th Av | San Francisco Fire Protection | as built change log ref pa #202008242501. 1. corrected floor plans to reflect what is on site 1st fl & 2nd fl unit #759. 2. corrected location of the facu smoke detector pull station and aes radio is now located on 2nd fl.Details
as built change log ref pa #202008242501. 1. corrected floor plans to reflect what is on site 1st fl & 2nd fl unit #759. 2. corrected location of the facu smoke detector pull station and aes radio is now located on 2nd fl. | |
| Dec 22, 2022 | Completed final sign-off Mar 2023 | 759 06th Av | San Francisco Fire Protection | addition to existing fire alarm. install: remote power supply, sounders, monitoring modules.Details
addition to existing fire alarm. install: remote power supply, sounders, monitoring modules. | $3,000 |
| Jan 24, 2022 | Completed final sign-off Mar 2023 | 759 06th Av | Project Contractor Inc | installation of 37 fire sprinklers at g/f new units and related egress passage only. according to pa 201908027788 per nfpa 13 2016 and dedicated underground piping per nfpa 24. (trench, backfill and sidewalk repair by separate permit)Details
installation of 37 fire sprinklers at g/f new units and related egress passage only. according to pa 201908027788 per nfpa 13 2016 and dedicated underground piping per nfpa 24. (trench, backfill and sidewalk repair by separate permit) | $22,200 |
| Feb 22, 2021 | Completed final sign-off Dec 2023 | 759 06th Av | Sure, Inc. | revision to pa# 201707252899. layout revision due to change in plan from site conditions as well as grade change. architectural changes with no changes to structural. relocate washer/dryer in (3) units, relocate bathroom in 759-#9 & 767-#10. reconfigure kitchesn in (3) unitsDetails
revision to pa# 201707252899. layout revision due to change in plan from site conditions as well as grade change. architectural changes with no changes to structural. relocate washer/dryer in (3) units, relocate bathroom in 759-#9 & 767-#10. reconfigure kitchesn in (3) units | |
| Aug 24, 2020 | Never finaled issued Aug 2020, no final | 759 06th Av | San Francisco Fire Protection | like for like replacement and 2021 upgrade. replace existing smoke detector, manual pull station, remote led annunciator, power supply, motor bell and low frequency sounders.Details
like for like replacement and 2021 upgrade. replace existing smoke detector, manual pull station, remote led annunciator, power supply, motor bell and low frequency sounders. | $22,300 |
| Jan 24, 2020 | Expired or cancelled withdrawn May 2023 | 755 06th Av | revision to soft story permit 201709117652. modification to shearwall lengths and location.Details
revision to soft story permit 201709117652. modification to shearwall lengths and location. | ||
| Nov 20, 2019 | Completed final sign-off May 2021 | 759 06th Av | Sure, Inc. | unit 2, 2nd fl - reno new bedrooms and bathrooms, new kitchen cabinets, new plumbing fixtures, new bathroom, new lighting at (e) j-box locations. new dishwasher. no change to mech. no exterior work. no fire alarm or sprinkler work. no structural work affectedDetails
unit 2, 2nd fl - reno new bedrooms and bathrooms, new kitchen cabinets, new plumbing fixtures, new bathroom, new lighting at (e) j-box locations. new dishwasher. no change to mech. no exterior work. no fire alarm or sprinkler work. no structural work affected | $65,000 |
| Aug 28, 2019 | Completed final sign-off May 2021 | 755 06th Av | Sure, Inc. | reno of 1 apt - unit 767-02 on 2nd level.relocate kitchen: (n) cabinets, plm fixtures. remodel (e) bathroom and split into 2, lighting at (e) j-box locations, d/w. convert (e) kitchen into (n) bedroom. no change to mech/ext or structural.Details
reno of 1 apt - unit 767-02 on 2nd level.relocate kitchen: (n) cabinets, plm fixtures. remodel (e) bathroom and split into 2, lighting at (e) j-box locations, d/w. convert (e) kitchen into (n) bedroom. no change to mech/ext or structural. | $60,000 |
| Aug 2, 2019 | Completed final sign-off Dec 2023 | 759 06th Av | Halyard Inc, Sure, Inc. | revision to permit application #201707252899s per boa #19-011. add 3 units at ground floor per ord. 162-16. convert (e) storage space to (n) dwelling units with (e) envelope. retain (2) off street spaces & tenant storage.Details
revision to permit application #201707252899s per boa #19-011. add 3 units at ground floor per ord. 162-16. convert (e) storage space to (n) dwelling units with (e) envelope. retain (2) off street spaces & tenant storage. | |
| Mar 4, 2019 | Completed final sign-off May 2019 | 767 06th Av | Sure, Inc. | replace/repair rotted siding at rear of building. replace 8 window at rear of building. work not visible from street.Details
replace/repair rotted siding at rear of building. replace 8 window at rear of building. work not visible from street. | $15,000 |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 759 06th Av | street spaceDetails
street space | ||
| Jul 19, 2018 | Completed final sign-off Dec 2018 | 759 06th Av | Sure, Inc. | unit #5: renovation of one apartment on 1st floor. new bedroom, nw kitchen cabinets, nw plbmg fixtures, new dishwasher, new washer dryer, nw lighting at extg j box locations, no change to mech. no exterior work. no fire alarm or sprinkler work.Details
unit #5: renovation of one apartment on 1st floor. new bedroom, nw kitchen cabinets, nw plbmg fixtures, new dishwasher, new washer dryer, nw lighting at extg j box locations, no change to mech. no exterior work. no fire alarm or sprinkler work. | $20,000 |
| Oct 16, 2017 | Never finaled issued Oct 2017, no final | 759 06th Av | street spaceDetails
street space | ||
| Sep 11, 2017 | Completed final sign-off May 2023 | 755 06th Av | soft story retrofit in accordance with 2016 cebc chapter a4Details
soft story retrofit in accordance with 2016 cebc chapter a4 | $40,000 | |
| Jul 25, 2017 | Completed final sign-off Dec 2023 | 759 06th Av | Sure, Inc. | add (4) units at ground flr per ord 162-16. convert (e) storage space to (n) dwelling units within (e) envelope. (n) kitchen, baths & entry doors. sprinklers to nfpa-13 and fire alarm under separate application.Details
add (4) units at ground flr per ord 162-16. convert (e) storage space to (n) dwelling units within (e) envelope. (n) kitchen, baths & entry doors. sprinklers to nfpa-13 and fire alarm under separate application. | $200,000 |
| Jul 17, 2017 | Never finaled issued Jul 2017, no final | 759 06th Av | street spaceDetails
street space | ||
| Jun 15, 2017 | Completed final sign-off Feb 2019 | 759 06th Av | Sure, Inc. | renov of 5 apts:unit 5 on 2nd floor in 767. unit 6 on 2nd floor in 759. unit 7 on 3rd floor in 767 and units 4 & 8 on the 3rd floor in 759. new kitchen cabinets/plumbing/fixtures/appliances/lighting/finishes. new layout/new bedrooms, mech-t24. no exterior work, fire alarm under separate permits.Details
renov of 5 apts:unit 5 on 2nd floor in 767. unit 6 on 2nd floor in 759. unit 7 on 3rd floor in 767 and units 4 & 8 on the 3rd floor in 759. new kitchen cabinets/plumbing/fixtures/appliances/lighting/finishes. new layout/new bedrooms, mech-t24. no exterior work, fire alarm under separate permits. | $300,000 |
| Sep 13, 2016 | Expired or cancelled withdrawn May 2023 | 755 06th Av | seismic retrofit of soft story comply with sfbc 34b mandatory seismic retrofit per 2012 iebc appx a4Details
seismic retrofit of soft story comply with sfbc 34b mandatory seismic retrofit per 2012 iebc appx a4 | $85,000 | |
| Jun 11, 2015 | Completed final sign-off Jul 2015 | 767 06th Av | Szeto Construction | apt. #1: remove old cabinet and counter top and replace with new ones. all wor to be non structuralDetails
apt. #1: remove old cabinet and counter top and replace with new ones. all wor to be non structural | $5,000 |
| Apr 3, 2015 | Expired or cancelled cancelled Oct 2015 | 767 06th Av | apt #1: replace and remove kitchen cabinet, counter top.Details
apt #1: replace and remove kitchen cabinet, counter top. | $1,000 | |
| Dec 1, 2009 | Completed final sign-off Dec 2009 | 759 06th Av | unit #5-remove fireplace facade/mantel & install sheetrock, no structural changesDetails
unit #5-remove fireplace facade/mantel & install sheetrock, no structural changes | $300 | |
| Oct 2, 2009 | Never finaled issued Nov 2009, no final | 759 06th Av | Pro Design Builders | interior remodel of unit 4 to comply with nov 200921157 dated 9-30-09. convert (e) kitchen to den and convert (e) to kitchen.Details
interior remodel of unit 4 to comply with nov 200921157 dated 9-30-09. convert (e) kitchen to den and convert (e) to kitchen. | $3,000 |
| Sep 10, 2009 | Expired or cancelled cancelled Aug 2022 | 759 06th Av | revise pa# 2009-0826-5577-showing doors between unit #4 & unit #8. 90 min fire rating door (32"x80"), 90 min fire rating door (36"x80")Details
revise pa# 2009-0826-5577-showing doors between unit #4 & unit #8. 90 min fire rating door (32"x80"), 90 min fire rating door (36"x80") | $800 | |
| Aug 26, 2009 | Completed final sign-off Sep 2009 | 759 06th Av | per nov#200863117 (install 7'-6"x8'-6" new wall. 5/8" type "x" sheetrock on both sides of wall.Details
per nov#200863117 (install 7'-6"x8'-6" new wall. 5/8" type "x" sheetrock on both sides of wall. | $1,000 | |
| Jul 18, 2006 | Expired or cancelled expired Feb 2010 | 759 06th Av | All Four Season's Roofing | reroofingDetails
reroofing | $5,400 |
| Jun 2, 2006 | Expired or cancelled expired Feb 2010 | 759 06th Av | Luo's Construction Company **Check Id*** | reroofingDetails
reroofing | $8,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.