Dennis Construction & Painting Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Jun 2025
- Last 24 months
- 3 permits filed
31 permits since 2000: 31 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2025 | Completed final sign-off Feb 2026 | 163 Brighton Av | permit to address notice fo violation #201723901. permit to remove non-permitted garden shed, canopy structure, storage space and legalize stair. no new living area.Details
permit to address notice fo violation #201723901. permit to remove non-permitted garden shed, canopy structure, storage space and legalize stair. no new living area. | $7,500 |
| Apr 22, 2025 | Completed final sign-off May 2025 | 1735 Ocean Av | change of use from grocery store to nail & beauty spa; add furniture for beauty spa (no change to walls)Details
change of use from grocery store to nail & beauty spa; add furniture for beauty spa (no change to walls) | $1,000 |
| Nov 4, 2024 | Completed final sign-off Dec 2024 | 277 Dellbrook Av | bathroom remodel on the 2nd floor. no door or wall to be removed, convert the tub to a showerstall. add a fan and 2 recessed lights and 1 outlet.Details
bathroom remodel on the 2nd floor. no door or wall to be removed, convert the tub to a showerstall. add a fan and 2 recessed lights and 1 outlet. | $10,000 |
| Apr 8, 2024 | Completed final sign-off Oct 2024 | 833 Bosworth St | repair less than 50% of exterior secondary wood stairs in kind located at the rear to abate nov 202308316 item #8Details
repair less than 50% of exterior secondary wood stairs in kind located at the rear to abate nov 202308316 item #8 | $1,200 |
| Dec 13, 2023 | Completed final sign-off Apr 2026 | 878 38th Av | legalization & expansion of(e)ground fl dwelling unit. renovation of main fl living areas, kitchen & expansion of the plan including of a(n)bath. addition of interior staiway providing connection entrance for each unit.installation of fire sprinkler system as required by sf bldg code.Details
legalization & expansion of(e)ground fl dwelling unit. renovation of main fl living areas, kitchen & expansion of the plan including of a(n)bath. addition of interior staiway providing connection entrance for each unit.installation of fire sprinkler system as required by sf bldg code. | $450,000 |
| Dec 2, 2022 | Completed final sign-off Apr 2023 | 935 Burnett Av | unit 4: kitchen and bath 2nd fl to be remodled without removing any walls and doors. move the subpanel from a closet to hallway. add recessed lights (8) in the living room.Details
unit 4: kitchen and bath 2nd fl to be remodled without removing any walls and doors. move the subpanel from a closet to hallway. add recessed lights (8) in the living room. | $25,000 |
| Oct 13, 2022 | Completed final sign-off Aug 2023 | 2340 12th Av | interior remodel to include (n) ground floor family room, remodeled (e) bedroom , (e) bath, (n) laundry , bar, (n) internal estairs and 2nd floor (n) powder room, remodeled (e) kitchen and (e) bath. replace windows in kind.Details
interior remodel to include (n) ground floor family room, remodeled (e) bedroom , (e) bath, (n) laundry , bar, (n) internal estairs and 2nd floor (n) powder room, remodeled (e) kitchen and (e) bath. replace windows in kind. | $126,000 |
| Aug 4, 2022 | Completed final sign-off Aug 2023 | 2340 12th Av | dry rot repair & stucco repair @ front stairs. to be in-kind replacement limited to less than 50% approx. 20sf. general stucco repair @ exterior =100sf (<50%)Details
dry rot repair & stucco repair @ front stairs. to be in-kind replacement limited to less than 50% approx. 20sf. general stucco repair @ exterior =100sf (<50%) | $2,500 |
| Aug 4, 2022 | Completed final sign-off Nov 2022 | 2386 29th Av | one kitchen and one bath remodeling - no change to the layout in the kitchen and bathroom. no doors to be altered. install 10 led lights for dining room and living room. replace sub-panel. kitchen cabinet and counter.Details
one kitchen and one bath remodeling - no change to the layout in the kitchen and bathroom. no doors to be altered. install 10 led lights for dining room and living room. replace sub-panel. kitchen cabinet and counter. | $25,000 |
| Apr 25, 2022 | Completed final sign-off Aug 2022 | 129 Meadowbrook Dr | replace kitchen sink, cabinet and counter in kind, add 4 outlets. relocate furnace. replace water heater to tankless. modify furnace ductwork. no structural work - no framing modification.Details
replace kitchen sink, cabinet and counter in kind, add 4 outlets. relocate furnace. replace water heater to tankless. modify furnace ductwork. no structural work - no framing modification. | $12,000 |
| Jul 29, 2021 | Completed final sign-off Sep 2021 | 2278 21st Av | one kitchen remodel no doors and no walls will be altered and no structuralDetails
one kitchen remodel no doors and no walls will be altered and no structural | $15,000 |
| Jul 29, 2021 | Completed final sign-off Nov 2021 | 121 15th Av | one kitchen and (2) baths remodel bathroom replace fixtures. light led, vent, bathtub exhausted vent. no doors and no walls will be altered. no structural.Details
one kitchen and (2) baths remodel bathroom replace fixtures. light led, vent, bathtub exhausted vent. no doors and no walls will be altered. no structural. | $40,000 |
| Apr 28, 2021 | Completed final sign-off May 2022 | 1879 16th Av | interior remodel to upgrade stairs. relocate kitchen/ living/ dining areas to lower floor. new powder room on 1st fl. new 2nd fl master bath. new 2nd fl bath & 2 bedrooms at 2nd fl.202104289509Details
interior remodel to upgrade stairs. relocate kitchen/ living/ dining areas to lower floor. new powder room on 1st fl. new 2nd fl master bath. new 2nd fl bath & 2 bedrooms at 2nd fl.202104289509 | $165,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 1229 20th Av | #5: bathroom remodel - no walls & doors will be alltered; add a mechnichal fan.Details
#5: bathroom remodel - no walls & doors will be alltered; add a mechnichal fan. | $12,000 |
| Mar 17, 2021 | Completed final sign-off Jun 2021 | 2386 34th Av | kitchen & bath remodeling - no change to the layouts in the kitchen; remove a shower stall; no doors to be altered.Details
kitchen & bath remodeling - no change to the layouts in the kitchen; remove a shower stall; no doors to be altered. | $30,000 |
| Dec 23, 2020 | Completed final sign-off Apr 2021 | 935 Burnett Av | unit # 7: kitchen & bath remodeling - no change to the layouts. no doors to be altered.Details
unit # 7: kitchen & bath remodeling - no change to the layouts. no doors to be altered. | $45,000 |
| Sep 8, 2020 | Completed final sign-off Nov 2020 | 1859 Fulton St | unit #4: remodel bathroom @ 2nd floor, no change layout, no doors & walls to be removed.Details
unit #4: remodel bathroom @ 2nd floor, no change layout, no doors & walls to be removed. | $8,000 |
| Jul 14, 2020 | Completed final sign-off Sep 2020 | 1570 20th Av | #1: remodel two bathrooms, one kitchen. no wallas and doors will be altered or removed. add fans to the bathrooms. relocate the panel from inside a closet to a new area. work is on 2nd floor of house.Details
#1: remodel two bathrooms, one kitchen. no wallas and doors will be altered or removed. add fans to the bathrooms. relocate the panel from inside a closet to a new area. work is on 2nd floor of house. | $35,000 |
| Feb 25, 2020 | Completed final sign-off Sep 2021 | 3364 19th St | accessible business entrance program per ordinance 51-16. install power door operator.Details
accessible business entrance program per ordinance 51-16. install power door operator. | $2,000 |
| Oct 1, 2019 | Completed final sign-off Mar 2020 | 923 Vermont St | replace kitchen cabinets, flooring lighting, in kind. unit 925 -replace floor tiles, wall tiles, fixtures & plumbing fixtures in both bathrooms of unit 925. (e) layouts to remain, no structural changesDetails
replace kitchen cabinets, flooring lighting, in kind. unit 925 -replace floor tiles, wall tiles, fixtures & plumbing fixtures in both bathrooms of unit 925. (e) layouts to remain, no structural changes | $40,000 |
| Aug 14, 2019 | Completed final sign-off Aug 2019 | 575 Columbus Av | to address nov 201972351: #5 . at the rear stairway, guardrails passage is too wide. passage to be less than 4"Details
to address nov 201972351: #5 . at the rear stairway, guardrails passage is too wide. passage to be less than 4" | $1,000 |
| May 1, 2019 | Completed final sign-off Aug 2019 | 874 Sacramento St | all work in unit # 42: remodel kitchen and bathroom without changing the layouts. switche the tub to shower.Details
all work in unit # 42: remodel kitchen and bathroom without changing the layouts. switche the tub to shower. | $25,000 |
| Feb 21, 2019 | Completed final sign-off Mar 2019 | 899 Capp St | exterior wood stairway at rear of building, less than 40% of repairs, repair in-kind. to comply complaint #201874351.Details
exterior wood stairway at rear of building, less than 40% of repairs, repair in-kind. to comply complaint #201874351. | $3,500 |
| Jun 4, 2018 | Completed final sign-off Aug 2019 | 871 26th Av | remodel kitchen and baths and new bedroom upstairs. new bedroom, bath, laundry at garage level.Details
remodel kitchen and baths and new bedroom upstairs. new bedroom, bath, laundry at garage level. | $95,000 |
| May 9, 2018 | Completed final sign-off Dec 2018 | 370 Chicago Wy | relocate (e) ktichen & add 1 master bedroom with bath @ 2nd floor. install 4 windows on side, viynl, non-street visible. max u-factor 0.32, no structural or size changes.Details
relocate (e) ktichen & add 1 master bedroom with bath @ 2nd floor. install 4 windows on side, viynl, non-street visible. max u-factor 0.32, no structural or size changes. | $20,000 |
| Mar 19, 2018 | Completed final sign-off Oct 2018 | 35 Fulton St | replace existing sinks and add grab bar at existing bathroomDetails
replace existing sinks and add grab bar at existing bathroom | $2,800 |
| Feb 27, 2018 | Completed final sign-off Apr 2018 | 1601 23rd Av | remodel bathroom. no walls moved, removed, added or installed. all existing layut to remain unchanged.Details
remodel bathroom. no walls moved, removed, added or installed. all existing layut to remain unchanged. | $8,000 |
| Feb 20, 2018 | Completed final sign-off Apr 2018 | 1351 California St | comply with nov # 201724303 - completely. repair back stairwell 30% (not to exceed 50% repair). repair drainage pipes at exterior. install new sensor light fixture on backyard. to comply with nov # 201724303 items #2 - 6 (in it's entirety); n/a maherDetails
comply with nov # 201724303 - completely. repair back stairwell 30% (not to exceed 50% repair). repair drainage pipes at exterior. install new sensor light fixture on backyard. to comply with nov # 201724303 items #2 - 6 (in it's entirety); n/a maher | $4,000 |
| Feb 9, 2018 | Completed final sign-off Jun 2018 | 134 Bridgeview Dr | remodel (1) kitchen, new cabinet, new sink, new counter, new flooring 12'x9'. remodeling (2) bathrooms, new sink, new flooring, each 8' 1/2" x 5' 1/2". no rough frame or change in (e) layouts.Details
remodel (1) kitchen, new cabinet, new sink, new counter, new flooring 12'x9'. remodeling (2) bathrooms, new sink, new flooring, each 8' 1/2" x 5' 1/2". no rough frame or change in (e) layouts. | $12,000 |
| Feb 7, 2018 | Completed final sign-off Jul 2018 | 37 West Portal Av | remodel kitchen and bathroom and upgrade service panel.Details
remodel kitchen and bathroom and upgrade service panel. | $20,000 |
| Feb 7, 2018 | Completed final sign-off Jun 2018 | 849 39th Av | remodel kitchen and bathroom and upgrade service panel.Details
remodel kitchen and bathroom and upgrade service panel. | $20,000 |