Block 1000, lot 026
3099 Washington St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 25
- Rooms
- 25 bathrooms
- Building
- 13,274 sq ft
- Lot
- 5,349 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 12, 2026 | Completed final sign-off Apr 2026 | 3099 Washington St | Stone And Stryder Llc | unit#7: kitchen and bathroom remodel(1 x 1)Details
unit#7: kitchen and bathroom remodel(1 x 1) | $48,000 |
| Mar 12, 2026 | Completed final sign-off Apr 2026 | 3099 Washington St | Stone And Stryder Llc | unit #19: kitchen and bathroom remodel(1x1)Details
unit #19: kitchen and bathroom remodel(1x1) | $45,000 |
| Jun 29, 2023 | Completed final sign-off Feb 2024 | 3099 Washington St | C & E Electric & Fire Alarm Services | revision to pa 2022-0228-8840 new drawings to reflect as built conditions as builtDetails
revision to pa 2022-0228-8840 new drawings to reflect as built conditions as built | |
| Feb 22, 2023 | Completed final sign-off Feb 2024 | 3099 Washington St | Sandbank Construction, Inc | revision to pa# 201805038157, 202111092129. no change to unit mix. no change to mechanical or structural, extend new permanent fire escape steps and wall mounted ladder to ground flr. non-combustible metalDetails
revision to pa# 201805038157, 202111092129. no change to unit mix. no change to mechanical or structural, extend new permanent fire escape steps and wall mounted ladder to ground flr. non-combustible metal | $5,200 |
| Feb 28, 2022 | Completed final sign-off Feb 2024 | 3099 Washington St | C & E Electric & Fire Alarm Services | voluntary system replacement and mandatory lf horns upgrade to meet sffc 2019 sfc 1103.7.6.1, installing facu power dupply, tg-7 wireless communicator, pull stations, smoke detectors, horn strobes, lf's, mini modules.Details
voluntary system replacement and mandatory lf horns upgrade to meet sffc 2019 sfc 1103.7.6.1, installing facu power dupply, tg-7 wireless communicator, pull stations, smoke detectors, horn strobes, lf's, mini modules. | $26,300 |
| Feb 18, 2022 | Never finaled filed Feb 2022, never issued | 3099 Washington St | C & E Electric & Fire Alarm Services | volutary fire alarm system replacement & mandatory upgrade to comply with sffc 2019 sfc 1103.7.6.1. devices include: fauc, pull stations, smoke detectors, telguard communitor, horn strobes, annunciator & low freq sounders.Details
volutary fire alarm system replacement & mandatory upgrade to comply with sffc 2019 sfc 1103.7.6.1. devices include: fauc, pull stations, smoke detectors, telguard communitor, horn strobes, annunciator & low freq sounders. | $26,300 |
| Feb 16, 2022 | Completed final sign-off Aug 2023 | 3099 Washington St | Fire Guard Protection Inc. | fire ref pa# 202109228938. apn pa# 201805038157. as build fire sprinler system - relocated main riser assemly. existing 4" fire service.Details
fire ref pa# 202109228938. apn pa# 201805038157. as build fire sprinler system - relocated main riser assemly. existing 4" fire service. | |
| Nov 15, 2021 | Completed final sign-off Nov 2022 | 3099 Washington St | Sandbank Construction, Inc | revision to 2019 0328 6493 to accomodate (e) conditions. revision include adjustments to (e) framing layout and addition of new steel framing to support (e) chimney.Details
revision to 2019 0328 6493 to accomodate (e) conditions. revision include adjustments to (e) framing layout and addition of new steel framing to support (e) chimney. | |
| Nov 9, 2021 | Completed final sign-off Feb 2024 | 3099 Washington St | Sandbank Construction, Inc | revision to pa 201805038157. architectural layout revised to accomodate existing conditions. revision to structural scope. no change to unit mix. no change to exterior. no change to mechanical. sprinkler system filed under pa 202109228938.Details
revision to pa 201805038157. architectural layout revised to accomodate existing conditions. revision to structural scope. no change to unit mix. no change to exterior. no change to mechanical. sprinkler system filed under pa 202109228938. | |
| Sep 22, 2021 | Completed final sign-off Aug 2023 | 3099 Washington St | Fire Guard Protection Inc. | install fire sprinkler system in 1/f new fire adu units per nfpa-13. install new undreground per nfpa 24, apn 201805038157Details
install fire sprinkler system in 1/f new fire adu units per nfpa-13. install new undreground per nfpa 24, apn 201805038157 | $35,000 |
| Sep 26, 2019 | Completed final sign-off Sep 2020 | 3099 Washington St | Us Construction California, Inc | unit 16 - new bedroom, relocate/ new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lightin at (e) j-box locations. no change to mechanical. no exterior work. sprinkler or structural work f/a under sep permitDetails
unit 16 - new bedroom, relocate/ new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lightin at (e) j-box locations. no change to mechanical. no exterior work. sprinkler or structural work f/a under sep permit | $65,000 |
| Sep 26, 2019 | Completed final sign-off Sep 2020 | 3099 Washington St | Us Construction California, Inc | unit 2, 3 and 10 - remodel of kitchen & bathrooms replace counters, cabinets, fixtures & appliances in-kind. replace (e) dishwashers & washer/dryers w/(n) models in (e) locations. all bathrooms 35 sf each. all kitchen = 70 sf eachDetails
unit 2, 3 and 10 - remodel of kitchen & bathrooms replace counters, cabinets, fixtures & appliances in-kind. replace (e) dishwashers & washer/dryers w/(n) models in (e) locations. all bathrooms 35 sf each. all kitchen = 70 sf each | $65,000 |
| Sep 26, 2019 | Completed final sign-off Sep 2020 | 3099 Washington St | Us Construction California, Inc | unit 20 - new bedroom, new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural workDetails
unit 20 - new bedroom, new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural work | $45,000 |
| Mar 28, 2019 | Completed final sign-off Nov 2022 | 3099 Washington St | Halyard Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $60,000 |
| Jul 24, 2018 | Completed final sign-off Oct 2018 | 3099 Washington St | Brighter Bay Builders Inc | unit 8: kitchen & bath remodel; upgrade electrical & plumbing to codeDetails
unit 8: kitchen & bath remodel; upgrade electrical & plumbing to code | $30,000 |
| May 3, 2018 | Completed final sign-off Feb 2024 | 3099 Washington St | Halyard Inc | add units per ord# 162-16. convert (e) garage space to (5) (n) dwelling units, within (e) envelope. (n) kitchens, baths & entry doors. (n) front windows. (n) plumbing and electrical. (n) dishwashers. (n) washer-dryers. renovation of (e) unit no. 26Details
add units per ord# 162-16. convert (e) garage space to (5) (n) dwelling units, within (e) envelope. (n) kitchens, baths & entry doors. (n) front windows. (n) plumbing and electrical. (n) dishwashers. (n) washer-dryers. renovation of (e) unit no. 26 | $500,000 |
| Mar 22, 2018 | Completed final sign-off Sep 2018 | 3099 Washington St | Us Construction California, Inc | unit #11: kitchen and bath remodel, new subpanel, kitchen cabinets, bath fixtures. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
unit #11: kitchen and bath remodel, new subpanel, kitchen cabinets, bath fixtures. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $35,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 3099 Washington St | street spaceDetails
street space | ||
| Feb 1, 2018 | Expired or cancelled cancelled Jan 2026 | 3099 Washington St | renovation of 1 apartment: unit 24 on 3rd, new kitchen cabinets, new w/d. new dishwasher, new plm fixture, new lighting at (e) j box locations. no change to mechanical. no ext work no fire alarm or sprinkler workDetails
renovation of 1 apartment: unit 24 on 3rd, new kitchen cabinets, new w/d. new dishwasher, new plm fixture, new lighting at (e) j box locations. no change to mechanical. no ext work no fire alarm or sprinkler work | $60,000 | |
| Nov 14, 2017 | Never finaled issued Nov 2017, no final | 3099 Washington St | Sure, Inc. | apt 18: kitchen & bathroomrmeodeling in-kind.Details
apt 18: kitchen & bathroomrmeodeling in-kind. | $30,000 |
| Jan 20, 2016 | Expired or cancelled withdrawn Mar 2019 | 3099 Washington St | the seismic retrofit is limited to only the soft story level. this includes shear walls, collectors, lateral clips & anchor bolts, all below the first level at the carport locationsDetails
the seismic retrofit is limited to only the soft story level. this includes shear walls, collectors, lateral clips & anchor bolts, all below the first level at the carport locations | $90,000 | |
| Jul 30, 2012 | Completed final sign-off Oct 2012 | 3099 Washington St | Michael Mc Nulty Construction***Ask Id | removal and replacement of eight deck footings in kind less than 50%Details
removal and replacement of eight deck footings in kind less than 50% | $6,200 |
| May 11, 2007 | Expired or cancelled cancelled Jun 2007 | 3099 Washington St | On-Site Maintenance | unit #17- install cabinets only in kind. no structural changes. no lighting work to be done. no electrical, no plumbing.Details
unit #17- install cabinets only in kind. no structural changes. no lighting work to be done. no electrical, no plumbing. | $8,170 |
| May 4, 2007 | Completed final sign-off Jun 2007 | 3099 Washington St | On-Site Maintenance | repair stairs in kind about 10% back common area. leding to garage no structural changes. less than 50% of structure. no comply with nov#200007457.Details
repair stairs in kind about 10% back common area. leding to garage no structural changes. less than 50% of structure. no comply with nov#200007457. | $2,000 |
| Jun 27, 2000 | Completed final sign-off Nov 2000 | 3099 Washington St | Advanced Design General Contractor | install 3/4 foam and vinyl siding to back side south side not visibleDetails
install 3/4 foam and vinyl siding to back side south side not visible | $10,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Us Construction California, Inc (4), C & E Electric & Fire Alarm Services (3), Sandbank Construction, Inc (3), Fire Guard Protection Inc. (2), Halyard Inc (2), On-Site Maintenance (2), Stone And Stryder Llc (2), Advanced Design General Contractor, Brighter Bay Builders Inc, Michael Mc Nulty Construction***Ask Id, Sure, Inc.
- Architects
- Jacob Herczeg (6)
- Engineers
- Kathryn Briggs (3), S.K Noravian
- Designers
- Carlos A. Garcia, Donald Dammen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.