Gbi Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2021 to Sep 2026
- Last 24 months
- 8 permits filed
12 permits since 2000: 6 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 60 Stonecrest Dr | remodel kitchen in kind appx 19x13. update mep. repair dry not damage exterior eastern no visible from street. replace (2) windows in kind not visible from street (max. u-factor=0.27)Details
remodel kitchen in kind appx 19x13. update mep. repair dry not damage exterior eastern no visible from street. replace (2) windows in kind not visible from street (max. u-factor=0.27) | $18,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 60 Stonecrest Dr | repair and replace dry rot damage at north east dining room corner. window and stucco replacement. repair and replace dry rot hamage and north exterior wall. 3 windows and stucco replacement. (no work is street visible.)Details
repair and replace dry rot damage at north east dining room corner. window and stucco replacement. repair and replace dry rot hamage and north exterior wall. 3 windows and stucco replacement. (no work is street visible.) | $8,500 |
| May 1, 2026 | In progress issued May 2026 | 60 Stonecrest Dr | removal of interior wall between kitchen & dining roomDetails
removal of interior wall between kitchen & dining room | $2,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 60 Stonecrest Dr | remodel 3rd floor primary bath in kind, shower double vanity, remodel 3rd floor hallway bath in kind tub/shower combo, single vanity, replace forced air heater for 1st & 2nd floor, mini split air & heat for 3rd floor.Details
remodel 3rd floor primary bath in kind, shower double vanity, remodel 3rd floor hallway bath in kind tub/shower combo, single vanity, replace forced air heater for 1st & 2nd floor, mini split air & heat for 3rd floor. | $35,600 |
| Feb 4, 2026 | Completed final sign-off Jun 2026 | 955 Corbett Av | remodel existing bathroom in kind, add ventless laundry to existing closet w/ ventless electric dryer, upgrade electrical wiring & panel, repair & replace 2 windows & exterior door in kindDetails
remodel existing bathroom in kind, add ventless laundry to existing closet w/ ventless electric dryer, upgrade electrical wiring & panel, repair & replace 2 windows & exterior door in kind | $32,000 |
| Aug 28, 2025 | In progress issued Sep 2025 | 822 27th Av | revision to pa#202103317639: new stucco replacement throughout front facade. (dryrot remediation)Details
revision to pa#202103317639: new stucco replacement throughout front facade. (dryrot remediation) | $25,000 |
| May 16, 2025 | Completed final sign-off Nov 2025 | 433 Pacheco St | 1/f: interior remodel. creating home office, mudroom, full bath, laundry.Details
1/f: interior remodel. creating home office, mudroom, full bath, laundry. | $100,000 |
| Feb 11, 2025 | Completed final sign-off Dec 2025 | 822 27th Av | revision to pa 2021-0331-7639 structural amendments to permitted plans based on (e) conditions. expanded area of slab on grade work new footing at south wall framing modificationsDetails
revision to pa 2021-0331-7639 structural amendments to permitted plans based on (e) conditions. expanded area of slab on grade work new footing at south wall framing modifications | |
| Jun 28, 2024 | Completed final sign-off Sep 2024 | 1518 10th Av | remodel (e) bathroom in kind remove (e) tub/shower and replace. replace(e) single vanity add bathroom bath change in swing door to pocket door new tile no wall removalDetails
remodel (e) bathroom in kind remove (e) tub/shower and replace. replace(e) single vanity add bathroom bath change in swing door to pocket door new tile no wall removal | $18,000 |
| Oct 6, 2022 | Completed final sign-off Dec 2024 | 1874 Church St | second floor bathroom remodel & addition of interior laundry. remove closet door & portion of wall & install new sliding doors. remove non bearing inteior walls.Details
second floor bathroom remodel & addition of interior laundry. remove closet door & portion of wall & install new sliding doors. remove non bearing inteior walls. | $30,000 |
| Jul 6, 2022 | Completed final sign-off Mar 2024 | 9 Jade Pl | 1 kitchen & 2 baths remodel. expand ground floor bathroom & add laundry. remove/ replace windows for entire bldg. voluntary seismic upgrade.Details
1 kitchen & 2 baths remodel. expand ground floor bathroom & add laundry. remove/ replace windows for entire bldg. voluntary seismic upgrade. | $50,000 |
| Mar 31, 2021 | In progress issued Dec 2024 | 822 27th Av | interior renovation of sfd w/ renovated bathrooms & kitchen at 2nd floor. infill of (e) open air patio at 2nd floor. addition of 2nd floor deck at rear primary bedroom. exterior cosmetic repairs & replacement of front facade finish material to fix cracked plaster stucco. replace guardrails, handrailDetails
interior renovation of sfd w/ renovated bathrooms & kitchen at 2nd floor. infill of (e) open air patio at 2nd floor. addition of 2nd floor deck at rear primary bedroom. exterior cosmetic repairs & replacement of front facade finish material to fix cracked plaster stucco. replace guardrails, handrail | $250,000 |