Block 7523, lot 018
9 Jade Pl
- City’s use
- Single Family Residential
- Built
- 1977
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 3,603 sq ft
- Lot
- 7,673 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 19, 2023 | Completed final sign-off Mar 2024 | 9 Jade Pl | Excelsior Building Group | rev to pa 202207067817 & 202301049661 & 202304075262: install interior non-bearing walls and structural upgrades.Details
rev to pa 202207067817 & 202301049661 & 202304075262: install interior non-bearing walls and structural upgrades. | $2,000 |
| Apr 7, 2023 | Completed final sign-off Mar 2024 | 9 Jade Pl | Excelsior Building Group | revision to pa# 202207067817 & 202301049661, 2nd flr in-kind replacement of deteriorated sunroom window (street facing)Details
revision to pa# 202207067817 & 202301049661, 2nd flr in-kind replacement of deteriorated sunroom window (street facing) | $10,000 |
| Jan 4, 2023 | Completed final sign-off Mar 2024 | 9 Jade Pl | Excelsior Building Group | revision to 202207067817. ground floor: expand ground floor bathroom and laundry room, install pocket door. 1st & 2nd fl: remove non-bearing walls. 2nd fl: relocate non-bearing wall of bathroom, replace master bedroom w/ 36"door. install windows at ground floor and 1st floor. windows aluminumDetails
revision to 202207067817. ground floor: expand ground floor bathroom and laundry room, install pocket door. 1st & 2nd fl: remove non-bearing walls. 2nd fl: relocate non-bearing wall of bathroom, replace master bedroom w/ 36"door. install windows at ground floor and 1st floor. windows aluminum | $10,000 |
| Nov 1, 2022 | Expired or cancelled cancelled Dec 2022 | 9 Jade Pl | Soto Hvac | installation of one 4 zone ductless heat pump hvac (3 ton unit) mitusbishi mxz-4c36na3Details
installation of one 4 zone ductless heat pump hvac (3 ton unit) mitusbishi mxz-4c36na3 | $19,000 |
| Jul 6, 2022 | Completed final sign-off Mar 2024 | 9 Jade Pl | Excelsior Building Group, Gbi Construction Llc | 1 kitchen & 2 baths remodel. expand ground floor bathroom & add laundry. remove/ replace windows for entire bldg. voluntary seismic upgrade.Details
1 kitchen & 2 baths remodel. expand ground floor bathroom & add laundry. remove/ replace windows for entire bldg. voluntary seismic upgrade. | $50,000 |
| Sep 26, 2017 | Completed final sign-off Jun 2018 | 9 Jade Pl | Norwood Construction | replacing existing lanai on 2nd fl deck.Details
replacing existing lanai on 2nd fl deck. | $48,000 |
| Sep 15, 2009 | Completed final sign-off Dec 2009 | 9 Jade Pl | J.W.D. Construction | replace/rebuild entrance porch.Details
replace/rebuild entrance porch. | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Excelsior Building Group (4), Gbi Construction Llc, J.W.D. Construction, Norwood Construction, Soto Hvac
- Architects
- Rex Mclean (4), Van Ly, William Scott Ellsworth
- Engineers
- Engin Yagmur (2), Engin Yagmur, Matthew Tropp
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.