Back to bathroom remodel contractors
Gbi Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2021 to Sep 2026
- Last 24 months
- 8 permits filed
12 permits since 2000: 6 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 1 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2026 | In progress issued Mar 2026 | 60 Stonecrest Dr | remodel 3rd floor primary bath in kind, shower double vanity, remodel 3rd floor hallway bath in kind tub/shower combo, single vanity, replace forced air heater for 1st & 2nd floor, mini split air & heat for 3rd floor.Details
remodel 3rd floor primary bath in kind, shower double vanity, remodel 3rd floor hallway bath in kind tub/shower combo, single vanity, replace forced air heater for 1st & 2nd floor, mini split air & heat for 3rd floor. | $35,600 |
| Feb 4, 2026 | Completed final sign-off Jun 2026 | 955 Corbett Av | remodel existing bathroom in kind, add ventless laundry to existing closet w/ ventless electric dryer, upgrade electrical wiring & panel, repair & replace 2 windows & exterior door in kindDetails
remodel existing bathroom in kind, add ventless laundry to existing closet w/ ventless electric dryer, upgrade electrical wiring & panel, repair & replace 2 windows & exterior door in kind | $32,000 |
| May 16, 2025 | Completed final sign-off Nov 2025 | 433 Pacheco St | 1/f: interior remodel. creating home office, mudroom, full bath, laundry.Details
1/f: interior remodel. creating home office, mudroom, full bath, laundry. | $100,000 |
| Jun 28, 2024 | Completed final sign-off Sep 2024 | 1518 10th Av | remodel (e) bathroom in kind remove (e) tub/shower and replace. replace(e) single vanity add bathroom bath change in swing door to pocket door new tile no wall removalDetails
remodel (e) bathroom in kind remove (e) tub/shower and replace. replace(e) single vanity add bathroom bath change in swing door to pocket door new tile no wall removal | $18,000 |
| Oct 6, 2022 | Completed final sign-off Dec 2024 | 1874 Church St | second floor bathroom remodel & addition of interior laundry. remove closet door & portion of wall & install new sliding doors. remove non bearing inteior walls.Details
second floor bathroom remodel & addition of interior laundry. remove closet door & portion of wall & install new sliding doors. remove non bearing inteior walls. | $30,000 |
| Jul 6, 2022 | Completed final sign-off Mar 2024 | 9 Jade Pl | 1 kitchen & 2 baths remodel. expand ground floor bathroom & add laundry. remove/ replace windows for entire bldg. voluntary seismic upgrade.Details
1 kitchen & 2 baths remodel. expand ground floor bathroom & add laundry. remove/ replace windows for entire bldg. voluntary seismic upgrade. | $50,000 |
| Mar 31, 2021 | In progress issued Dec 2024 | 822 27th Av | interior renovation of sfd w/ renovated bathrooms & kitchen at 2nd floor. infill of (e) open air patio at 2nd floor. addition of 2nd floor deck at rear primary bedroom. exterior cosmetic repairs & replacement of front facade finish material to fix cracked plaster stucco. replace guardrails, handrailDetails
interior renovation of sfd w/ renovated bathrooms & kitchen at 2nd floor. infill of (e) open air patio at 2nd floor. addition of 2nd floor deck at rear primary bedroom. exterior cosmetic repairs & replacement of front facade finish material to fix cracked plaster stucco. replace guardrails, handrail | $250,000 |