Back to bathroom remodel contractors
Talbco Development Corp Dba Supreme Buil
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Feb 2021
- Last 24 months
- 0 permits filed
21 permits since 2000: 18 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 286 days from filing to permit and 226 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2021 | Never finaled issued Apr 2021, no final | 4630 19th St | interior remodel of 1/f including new half bathroom and closet. replace 3 (e) windows with new clad wood units by marvin (building front facade). same size.Details
interior remodel of 1/f including new half bathroom and closet. replace 3 (e) windows with new clad wood units by marvin (building front facade). same size. | $14,000 |
| Sep 2, 2020 | Completed final sign-off Oct 2020 | 83 Farnsworth Ln | add new full bathroom on 2nd story. no structural work.Details
add new full bathroom on 2nd story. no structural work. | $15,000 |
| Mar 20, 2019 | Completed final sign-off Jan 2022 | 2731 California St | new room addtion of 206 sf @ nd fl level. install new bath. repair damaged roof deck & exterior stair & install (n) waterproofing. **maher n/a**Details
new room addtion of 206 sf @ nd fl level. install new bath. repair damaged roof deck & exterior stair & install (n) waterproofing. **maher n/a** | $100,000 |
| May 2, 2016 | Completed final sign-off Nov 2018 | 464 Gold Mine Dr | remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fire alarm work.Details
remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fire alarm work. | $80,000 |