Block 0293, lot 001
211 Sutter St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 11
- Units
- 3
- Rooms
- 9 bathrooms
- Building
- 42,819 sq ft
- Lot
- 3,510 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
114 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 25, 2026 | Completed final sign-off Jun 2026 | 211 Sutter St | Cjc Management Group Inc. | front window box: repair/replace tile veneer at under storefront windows. normal maintenance to replaced cracked tiles/veneers in-kind as needed. 40lf.Details
front window box: repair/replace tile veneer at under storefront windows. normal maintenance to replaced cracked tiles/veneers in-kind as needed. 40lf. | $500 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 211 Sutter St | Mastec Network Solutions Inc | revision to 202412237338 to document the relocation of rf cabinet 6160 and battery cabinet b160 and fiber winder box. remove rbs 6102 existing cabinet.Details
revision to 202412237338 to document the relocation of rf cabinet 6160 and battery cabinet b160 and fiber winder box. remove rbs 6102 existing cabinet. | |
| Dec 23, 2024 | Completed final sign-off Dec 2025 | 211 Sutter St | Mastec Network Solutions Inc | t-mobile: remove (4) (e) antennas. install (6) (n) antennas. remove (1) (e) cabinet and install (2) (n) cabinets. install (n) electrical panel. install (12) (n) batteries.Details
t-mobile: remove (4) (e) antennas. install (6) (n) antennas. remove (1) (e) cabinet and install (2) (n) cabinets. install (n) electrical panel. install (12) (n) batteries. | $95,000 |
| Jul 30, 2024 | Completed final sign-off Jan 2025 | 211 Sutter St | Diablo Telecom & Construction Inc | att mobility modification consisting r/r 6 existing antennas,relocate 2 antennss, remove 3 rruw, install 1 new 6648 baseband unit in e purcell cabinet. install rf barricades, paint, strip signs on roof topDetails
att mobility modification consisting r/r 6 existing antennas,relocate 2 antennss, remove 3 rruw, install 1 new 6648 baseband unit in e purcell cabinet. install rf barricades, paint, strip signs on roof top | $35,000 |
| Jul 6, 2022 | Expired or cancelled cancelled Jan 2026 | 211 Sutter St | Modus Rex Llc | dish: install (6)(n) antennas, (12)(m) rrus, (1)(n) platform w/ (1) (n) cabinet (2)(n) batteries.Details
dish: install (6)(n) antennas, (12)(m) rrus, (1)(n) platform w/ (1) (n) cabinet (2)(n) batteries. | $125,000 |
| Aug 27, 2021 | Completed final sign-off Apr 2022 | 211 Sutter St | Richbay Construction | rev pa201810264308: 5/f-change both restroom to all-genger restroom andonly 1 restroom is fully ada accessible restroom. at 8th & 9th floor: change all-gender restroom configuration, both restrooms are full ada accessible.Details
rev pa201810264308: 5/f-change both restroom to all-genger restroom andonly 1 restroom is fully ada accessible restroom. at 8th & 9th floor: change all-gender restroom configuration, both restrooms are full ada accessible. | $100 |
| Apr 13, 2021 | Completed final sign-off Jul 2021 | 211 Sutter St | San Francisco Fire Protection | add-on installation to an existing fire alarm system in a sprinklered building. install of new smoke detectors, install of new monitor modules and relay modules. fire alarm ref # 2017-0310-1196 sprinkler ref #2012-0809-7006Details
add-on installation to an existing fire alarm system in a sprinklered building. install of new smoke detectors, install of new monitor modules and relay modules. fire alarm ref # 2017-0310-1196 sprinkler ref #2012-0809-7006 | $7,000 |
| Nov 13, 2020 | Expired or cancelled cancelled Nov 2024 | 211 Sutter St | remove and replace 3 cabinets. r/r 3 antennas with 3 new antennas. r/r 3 rru's with 3 new rru's. install 6 diplexers. install 3 hybrid antennas. install new bb unit inside cabinet. remove 4 diplexers & 2 cabinetsDetails
remove and replace 3 cabinets. r/r 3 antennas with 3 new antennas. r/r 3 rru's with 3 new rru's. install 6 diplexers. install 3 hybrid antennas. install new bb unit inside cabinet. remove 4 diplexers & 2 cabinets | $25,000 | |
| Sep 4, 2020 | Completed final sign-off Jul 2022 | 211 Sutter St | Electric Tech Construction Inc | at&t proposes to modify an existing facility as follows: remove & replace 3 existing antennas, remove 6 existing rru's, install 3 rru's. all other related equipment being placed in existing cabinets.Details
at&t proposes to modify an existing facility as follows: remove & replace 3 existing antennas, remove 6 existing rru's, install 3 rru's. all other related equipment being placed in existing cabinets. | $21,000 |
| Dec 17, 2019 | Expired or cancelled cancelled Jan 2026 | 211 Sutter St | replacement of leather bench in dining room with new section of metal railing match existingDetails
replacement of leather bench in dining room with new section of metal railing match existing | $6,000 | |
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 211 Sutter St | street spaceDetails
street space | ||
| Oct 1, 2019 | Never finaled issued Oct 2019, no final | 211 Sutter St | street space w/mtaDetails
street space w/mta | ||
| Sep 3, 2019 | Completed final sign-off Oct 2019 | 211 Sutter St | Jose Martinez | change of use from retail to limited restaurant. install prep kitchen.Details
change of use from retail to limited restaurant. install prep kitchen. | $7,500 |
| May 30, 2019 | Expired or cancelled withdrawn Dec 2024 | 211 Sutter St | t-mobile - install 4 (n) antennas behind (n) frp screen on (e) roof; installing 2 (n) antennas on (n) curb of (e) penthouse roof; install 2 (n) frp screens; install 3 (n) radio; install 3 (n) rrus; install 3 (n) hybrid cables; install (n) cable trays on (e) roof; install (n0 xmu & (n) 1x6630 forDetails
t-mobile - install 4 (n) antennas behind (n) frp screen on (e) roof; installing 2 (n) antennas on (n) curb of (e) penthouse roof; install 2 (n) frp screens; install 3 (n) radio; install 3 (n) rrus; install 3 (n) hybrid cables; install (n) cable trays on (e) roof; install (n0 xmu & (n) 1x6630 for | $25,000 | |
| Dec 18, 2018 | Completed final sign-off Apr 2019 | 211 Sutter St | Metropolitan Electrical Construction | att modificatoin: install 3 new antennas, and other sm equip. r&r 1 (e) purcell cabiney w/1 new purcell cabinet no changes to batteiesDetails
att modificatoin: install 3 new antennas, and other sm equip. r&r 1 (e) purcell cabiney w/1 new purcell cabinet no changes to batteies | $18,000 |
| Oct 26, 2018 | Completed final sign-off Apr 2022 | 211 Sutter St | Richbay Construction | floors 5th,8th and 9th(mezzanine): prepare (e) vanilla shell at 5th, 8th & 8th flr mezz for future tenants. work incl modify (e) 8th & 8th flr mezz restrooms. (n) conference rooms at 5th & 8th flr and (n) breakrooms for all remodeled floors. new lighting & hvacDetails
floors 5th,8th and 9th(mezzanine): prepare (e) vanilla shell at 5th, 8th & 8th flr mezz for future tenants. work incl modify (e) 8th & 8th flr mezz restrooms. (n) conference rooms at 5th & 8th flr and (n) breakrooms for all remodeled floors. new lighting & hvac | $200,000 |
| Oct 16, 2018 | Completed final sign-off Feb 2019 | 211 Sutter St | Metropolitan Electrical Construction | att modification. remove and replace 9 extg antennas with 9 new antennas; install 9 new rrus and other small equip; install new cabinetws with batteries. remove unused equip. n/a for maher.Details
att modification. remove and replace 9 extg antennas with 9 new antennas; install 9 new rrus and other small equip; install new cabinetws with batteries. remove unused equip. n/a for maher. | $58,000 |
| May 15, 2017 | Never finaled issued May 2017, no final | 211 Sutter St | street space w/mtaDetails
street space w/mta | ||
| Mar 10, 2017 | Completed final sign-off Oct 2018 | 211 Sutter St | San Francisco Fire Protection | like for like fire system replacement due to elev modernatization. replace (e) control panel. smoke det & pull station w.new at the same location. install relay modules for new ele recall. install monitor modules to tie-in (e) waterflow & tamper switchesDetails
like for like fire system replacement due to elev modernatization. replace (e) control panel. smoke det & pull station w.new at the same location. install relay modules for new ele recall. install monitor modules to tie-in (e) waterflow & tamper switches | $8,000 |
| Oct 18, 2016 | Never finaled issued Oct 2016, no final | 211 Sutter St | Monarch Builders Inc | revision to pa #201609147720: title -24 lighting informationDetails
revision to pa #201609147720: title -24 lighting information | $800 |
| Sep 14, 2016 | Never finaled issued Sep 2016, no final | 211 Sutter St | Monarch Builders Inc | gift retail space construct new ada restroomDetails
gift retail space construct new ada restroom | $12,500 |
| Aug 25, 2016 | Completed final sign-off May 2017 | 211 Sutter St | Metropolitan Electrical Construction | at&t modification: r&r 4(e) antennas with 4(n) antennas, paint to match; r&r and relocate 2(e) antennas with 2(n) antennas; relocate 1(e) antennas, 2(e) rruw-01, (e) rrus-11; r&r (e) rrus-11 with (n) rrus-b2; install 3(n) rrus-32b66; relocate fiber box & dc6; install purcell cabinet with dus41 insidDetails
at&t modification: r&r 4(e) antennas with 4(n) antennas, paint to match; r&r and relocate 2(e) antennas with 2(n) antennas; relocate 1(e) antennas, 2(e) rruw-01, (e) rrus-11; r&r (e) rrus-11 with (n) rrus-b2; install 3(n) rrus-32b66; relocate fiber box & dc6; install purcell cabinet with dus41 insid | $36,000 |
| Jul 6, 2016 | Expired or cancelled cancelled Jan 2026 | 211 Sutter St | addition of a mailbox and fire rated partition on the ground floor lobby.Details
addition of a mailbox and fire rated partition on the ground floor lobby. | $7,500 | |
| Apr 28, 2016 | Completed final sign-off Sep 2017 | 211 Sutter St | Amone Corp | demolition of existing non-structural partitions, doors & suspended ceiling floors 5, 8 and 9- light fixtures, fire life safety & fire sprinklers to remain, no change.Details
demolition of existing non-structural partitions, doors & suspended ceiling floors 5, 8 and 9- light fixtures, fire life safety & fire sprinklers to remain, no change. | $40,000 |
| Dec 18, 2015 | Completed final sign-off Sep 2016 | 211 Sutter St | Metropolitan Electrical Construction | modification to att telecom facility consisting of 3 n rrus, 32 units install new purcell with n dvs41, 6 n dg6 surge supp,n fiber winder box, n fider and dc pwr,rr 3 e antennas w 3 n antennas,paint to match,remve unused cables,rmv 3 e dc2 surge supp,raycap,rmve 1 rrvwDetails
modification to att telecom facility consisting of 3 n rrus, 32 units install new purcell with n dvs41, 6 n dg6 surge supp,n fiber winder box, n fider and dc pwr,rr 3 e antennas w 3 n antennas,paint to match,remve unused cables,rmv 3 e dc2 surge supp,raycap,rmve 1 rrvw | $16,000 |
| Oct 20, 2014 | Never finaled issued Oct 2014, no final | 211 Sutter St | Bilcor Inc | install 6 wall mount horn-strobes. install 2 ceiling mount horn-strobes. install 1 booster panel. ti# 201407151349Details
install 6 wall mount horn-strobes. install 2 ceiling mount horn-strobes. install 1 booster panel. ti# 201407151349 | $4,400 |
| Jul 15, 2014 | Completed final sign-off Mar 2015 | 211 Sutter St | Rockaway Construction Inc. | existing office suite remodel on 2nd floor. add one conference room and 2 private offices. mep and fire safety on separate permitsDetails
existing office suite remodel on 2nd floor. add one conference room and 2 private offices. mep and fire safety on separate permits | $20,000 |
| Apr 10, 2014 | Never finaled issued Sep 2014, no final | 211 Sutter St | Johnson United Inc Dba United Sign Syste | install single faced electric illuminated wall sign.Details
install single faced electric illuminated wall sign. | $7,000 |
| Jan 2, 2014 | Never finaled issued Jan 2014, no final | 189 Kearny St | San Francisco Fire Protection | add one keypad for resetting fire alarm panel. ref app#201312204757Details
add one keypad for resetting fire alarm panel. ref app#201312204757 | $200 |
| Dec 20, 2013 | Never finaled issued Dec 2013, no final | 189 Kearny St | San Francisco Fire Protection | added matrix for elevator recall to plans. added 1 damper and 1 duct detector to plan, as built to pa# 201311222632Details
added matrix for elevator recall to plans. added 1 damper and 1 duct detector to plan, as built to pa# 201311222632 | |
| Nov 22, 2013 | Never finaled issued Nov 2013, no final | 189 Kearny St | San Francisco Fire Protection | fire alarm 5 notification devices intalled and tie in to existing power supply #2 located on 1st fl next to existing control panel 2010 nfpa 72 central system monitoringDetails
fire alarm 5 notification devices intalled and tie in to existing power supply #2 located on 1st fl next to existing control panel 2010 nfpa 72 central system monitoring | $2,000 |
| Nov 8, 2013 | Never finaled issued Nov 2013, no final | 189 Kearny St | O'connor Plumbing & Fire Protection | add 30 new heads due to new drop ceiling in basement only. t.i. 201309136797Details
add 30 new heads due to new drop ceiling in basement only. t.i. 201309136797 | $10,000 |
| Oct 30, 2013 | Never finaled issued Nov 2013, no final | 189 Kearny St | Premier Structures Inc | distribution of mechanical/hvac, power, lighting, and new ada restroom for retail t.i. (reference bldg pa #201309136797)Details
distribution of mechanical/hvac, power, lighting, and new ada restroom for retail t.i. (reference bldg pa #201309136797) | $100,000 |
| Oct 25, 2013 | Completed final sign-off Mar 2016 | 211 Sutter St | Triton Tower Inc | modification to an (e) unmanned telecommunication facility consisting of adding (3)(n) rrus-11 units. new signs, baracades & striping required.Details
modification to an (e) unmanned telecommunication facility consisting of adding (3)(n) rrus-11 units. new signs, baracades & striping required. | $6,000 |
| Sep 23, 2013 | Never finaled issued Sep 2013, no final | 189 Kearny St | street spaceDetails
street space | ||
| Sep 13, 2013 | Never finaled issued Oct 2013, no final | 189 Kearny St | Premier Structures Inc | for basement: new ada restroom, fitting room, floor and ceiling finishes, for gr fl lobby: new floor and ceiling finishes. all mep, ls and sprinklers to be under separate permits. jjcDetails
for basement: new ada restroom, fitting room, floor and ceiling finishes, for gr fl lobby: new floor and ceiling finishes. all mep, ls and sprinklers to be under separate permits. jjc | $150,000 |
| Sep 12, 2013 | Never finaled issued Sep 2013, no final | 189 Kearny St | new address to commercial space at block 0293, lot 001 as; 189 kearny st.Details
new address to commercial space at block 0293, lot 001 as; 189 kearny st. | ||
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 211 Sutter St | to obtain final inspection for work approved under pa # 200101119663 all work is complete.Details
to obtain final inspection for work approved under pa # 200101119663 all work is complete. | ||
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 211 Sutter St | to obtain final inspection for work approved under pa # 200102162421. all work is complete.Details
to obtain final inspection for work approved under pa # 200102162421. all work is complete. | ||
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 211 Sutter St | to obtain final inspection for work approved under pa # 200010314518. all work is complete.Details
to obtain final inspection for work approved under pa # 200010314518. all work is complete. | ||
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 211 Sutter St | to obtain final inspection for work approved under pa # 09916199. all work is complete.Details
to obtain final inspection for work approved under pa # 09916199. all work is complete. | ||
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 211 Sutter St | to obtain final inspection for work approved under pa # 200103013269. all work is complete.Details
to obtain final inspection for work approved under pa # 200103013269. all work is complete. | ||
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 211 Sutter St | to obtain final inspection for work approved under pa # 9124018. all work is complete.Details
to obtain final inspection for work approved under pa # 9124018. all work is complete. | ||
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 211 Sutter St | to obtain final inspection for work approved under pa # 200011105396. all work is complete.Details
to obtain final inspection for work approved under pa # 200011105396. all work is complete. | ||
| Nov 15, 2012 | Completed final sign-off Nov 2012 | 211 Sutter St | San Francisco Fire Protection | as built to pa# 201209210311 to show equipment installed by others. equipment is 1 duct detector and 1 pcu.Details
as built to pa# 201209210311 to show equipment installed by others. equipment is 1 duct detector and 1 pcu. | |
| Nov 9, 2012 | Completed final sign-off Nov 2012 | 211 Sutter St | Aaa Restaurant Fire Control/Dba Aaa Fire | 1st floor:amend permit #201208097006 to install 1 1/2 pipe supply to pollution control unit. app#201204037427Details
1st floor:amend permit #201208097006 to install 1 1/2 pipe supply to pollution control unit. app#201204037427 | $1,500 |
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 211 Sutter St | Certified Fire & Safety Co | hook up ansell fire system in kitchen hood and hook-up core fire system in pollution control unit. ref. sprinkler pa#201204037427 fire alarm + sprinkler on seperate permit.Details
hook up ansell fire system in kitchen hood and hook-up core fire system in pollution control unit. ref. sprinkler pa#201204037427 fire alarm + sprinkler on seperate permit. | $8,000 |
| Nov 1, 2012 | Completed final sign-off Nov 2012 | 211 Sutter St | Golden Gate Sign Company Inc. | installation of 1 electric projecting double faced sign.Details
installation of 1 electric projecting double faced sign. | $10,000 |
| Oct 22, 2012 | Completed final sign-off Nov 2012 | 211 Sutter St | San Francisco Fire Protection | add elevator recall control unit to service new future space from 1st floor to basement. 1 heat detector, 2 s/d, 3 relays. ref. pa# 2012-0403-7411Details
add elevator recall control unit to service new future space from 1st floor to basement. 1 heat detector, 2 s/d, 3 relays. ref. pa# 2012-0403-7411 | $2,000 |
| Oct 11, 2012 | Completed final sign-off Nov 2012 | 211 Sutter St | Tri-Quest Builders & Developers Inc | hardship request for use of ada door operator with button as well as sloped entrance 1:12 max per code section 113b.1111 exception 3 ref ti 201204037427Details
hardship request for use of ada door operator with button as well as sloped entrance 1:12 max per code section 113b.1111 exception 3 ref ti 201204037427 | $2,000 |
| Sep 21, 2012 | Never finaled issued Sep 2012, no final | 211 Sutter St | San Francisco Fire Protection | add 1 power supply, 2 strobes, and 6 horn/strobes to existing system.Details
add 1 power supply, 2 strobes, and 6 horn/strobes to existing system. | $5,000 |
| Aug 14, 2012 | Completed final sign-off Sep 2012 | 211 Sutter St | O'connor Plumbing & Fire Protection | add (5) new fire sprinkler needs at new stairway and elevator lobby facing kearny streetDetails
add (5) new fire sprinkler needs at new stairway and elevator lobby facing kearny street | $1,500 |
| Aug 9, 2012 | Never finaled issued Aug 2012, no final | 211 Sutter St | Aaa Restaurant Fire Control/Dba Aaa Fire | fire sprinkler system alteration in existing restaurant space at ground floor and mezzanine, supplied from existing system. (5 adds, 16 relocates)Details
fire sprinkler system alteration in existing restaurant space at ground floor and mezzanine, supplied from existing system. (5 adds, 16 relocates) | $8,000 |
| Jun 7, 2012 | Completed final sign-off Jul 2012 | 211 Sutter St | ground & mezzanine floor - install (60) heads for future tenant, space remain vacant.Details
ground & mezzanine floor - install (60) heads for future tenant, space remain vacant. | $16,000 | |
| Apr 26, 2012 | Never finaled issued Nov 2012, no final | 211 Sutter St | Tri-Quest Builders & Developers Inc, Tom Lewis Restoration And Consulting | to erect electric, wall, double faced sign.Details
to erect electric, wall, double faced sign. | $1,000 |
| Apr 26, 2012 | Expired or cancelled cancelled Jan 2026 | 211 Sutter St | Tom Lewis Restoration And Consulting | to erect non-electric, projecting, double faced sign.Details
to erect non-electric, projecting, double faced sign. | $3,000 |
| Apr 26, 2012 | Completed final sign-off Nov 2012 | 211 Sutter St | Tri-Quest Builders & Developers Inc, Tom Lewis Restoration And Consulting | to erect electric, wall, single faced, indirect, replacement sign.Details
to erect electric, wall, single faced, indirect, replacement sign. | $3,500 |
| Apr 23, 2012 | Never finaled issued Nov 2012, no final | 211 Sutter St | Tri-Quest Builders & Developers Inc | new door at kearny st. tenant space entry door. remove existing storefront and install new metal & glass storefront system.Details
new door at kearny st. tenant space entry door. remove existing storefront and install new metal & glass storefront system. | $25,000 |
| Apr 23, 2012 | Never finaled issued Nov 2012, no final | 211 Sutter St | Tri-Quest Builders & Developers Inc, Tom Lewis Restoration And Consulting | new door at kearny st. chipotle restaurant entry doorDetails
new door at kearny st. chipotle restaurant entry door | $25,000 |
| Apr 16, 2012 | Completed final sign-off Aug 2013 | 211 Sutter St | Triton Tower Inc | construction of an unmanned telecommunication facility consisting of 7 equipment cabinets & 9 antennasDetails
construction of an unmanned telecommunication facility consisting of 7 equipment cabinets & 9 antennas | $125,000 |
| Apr 3, 2012 | Never finaled issued May 2012, no final | 211 Sutter St | install new stair and elevator to serve current vacant space in the basement. new wheelchair lift t0 serve future retail tenant. gr fl and mezz retail tenant work and all related mech/elec will be under seperate permits.Details
install new stair and elevator to serve current vacant space in the basement. new wheelchair lift t0 serve future retail tenant. gr fl and mezz retail tenant work and all related mech/elec will be under seperate permits. | $300,000 | |
| Apr 3, 2012 | Completed final sign-off Nov 2012 | 211 Sutter St | Tri-Quest Builders & Developers Inc | tenant improvement for 5328 sq ft restaurant, electrical, mechanical & plumbing. exterior changes under separate permit.Details
tenant improvement for 5328 sq ft restaurant, electrical, mechanical & plumbing. exterior changes under separate permit. | $538,181 |
| Jan 26, 2012 | Completed final sign-off Feb 2012 | 211 Sutter St | Ayoob & Peery Plumbing Co Inc | add 4 sprinkler uprights and 1 concealed pendant in atm walk up area. total is 5. tenant improvement.Details
add 4 sprinkler uprights and 1 concealed pendant in atm walk up area. total is 5. tenant improvement. | $3,000 |
| Nov 14, 2011 | Completed final sign-off Jan 2012 | 211 Sutter St | San Francisco Fire Protection | create plans of extg system and change smoke detector on 3rd floor to activate smoke guards.Details
create plans of extg system and change smoke detector on 3rd floor to activate smoke guards. | $2,000 |
| Sep 30, 2011 | Completed final sign-off Jan 2012 | 211 Sutter St | 3rd floor:2 new bathrooms and new lighting through out. add 1 sink for kitchenette. smoke guards at elevators and fire alarm under separate permits.Details
3rd floor:2 new bathrooms and new lighting through out. add 1 sink for kitchenette. smoke guards at elevators and fire alarm under separate permits. | $39,000 | |
| Aug 25, 2011 | Never finaled issued Aug 2011, no final | 211 Sutter St | street space permitDetails
street space permit | ||
| Jul 25, 2011 | Never finaled issued Jul 2011, no final | 211 Sutter St | mta parking meter onlyDetails
mta parking meter only | ||
| Jul 25, 2011 | Never finaled issued Jul 2011, no final | 211 Sutter St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Jun 17, 2011 | Never finaled issued Jun 2011, no final | 211 Sutter St | M G Demolition | demo interior partition walls and suspended ceilings @ 3rd floor commercial unit (entire floor) per ab-017.Details
demo interior partition walls and suspended ceilings @ 3rd floor commercial unit (entire floor) per ab-017. | $4,500 |
| Jun 15, 2011 | Never finaled issued Jun 2011, no final | 211 Sutter St | street space and mta parkingDetails
street space and mta parking | ||
| Jun 15, 2011 | Never finaled issued Jun 2011, no final | 211 Sutter St | mta parkingDetails
mta parking | ||
| Jun 13, 2011 | Never finaled issued Dec 2011, no final | 211 Sutter St | Security Vault Works Inc. | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | $1,500 |
| May 19, 2011 | Never finaled issued Nov 2011, no final | 211 Sutter St | Security Vault Works Inc. | (e) storefront glass to be retained & new atm installed w/ vestibule for chase bank.Details
(e) storefront glass to be retained & new atm installed w/ vestibule for chase bank. | $15,000 |
| May 17, 2011 | Never finaled issued May 2011, no final | 211 Sutter St | street space & mtaDetails
street space & mta | ||
| Apr 11, 2011 | Never finaled issued Apr 2011, no final | 211 Sutter St | street space & mtaDetails
street space & mta | ||
| Mar 29, 2011 | Expired or cancelled cancelled Jul 2016 | 211 Sutter St | installation of an at & t unmanned wireless telecommunication facility consisting of 9 panel antennas & associated equipment cabinets on roof.Details
installation of an at & t unmanned wireless telecommunication facility consisting of 9 panel antennas & associated equipment cabinets on roof. | $125,000 | |
| Mar 9, 2011 | Never finaled issued Mar 2011, no final | 211 Sutter St | street space and mtaDetails
street space and mta | ||
| Feb 24, 2011 | Expired or cancelled cancelled Feb 2020 | 211 Sutter St | remove one (e) t-mobile equipment cabinet and replace with one (n) equipment cabinet.Details
remove one (e) t-mobile equipment cabinet and replace with one (n) equipment cabinet. | $3,500 | |
| Feb 9, 2011 | Never finaled issued Feb 2011, no final | 211 Sutter St | street space permitDetails
street space permit | ||
| Feb 1, 2011 | Completed final sign-off May 2011 | 211 Sutter St | Tom Lewis Restoration And Consulting | replace damage cornices on 10th fl with new gfrc.Details
replace damage cornices on 10th fl with new gfrc. | $500,000 |
| Jan 11, 2011 | Never finaled issued Jan 2011, no final | 211 Sutter St | street space and mta parkingDetails
street space and mta parking | ||
| Dec 8, 2010 | Never finaled issued Dec 2010, no final | 211 Sutter St | street space permitDetails
street space permit | ||
| Nov 10, 2010 | Never finaled issued Nov 2010, no final | 211 Sutter St | street spaceDetails
street space | ||
| Oct 6, 2010 | Never finaled issued Oct 2010, no final | 211 Sutter St | street spaceDetails
street space | ||
| Sep 29, 2010 | Completed final sign-off May 2011 | 211 Sutter St | Tom Lewis Restoration And Consulting | to legalize installation and removal of shoring and replacement of beams and columns performed without permit.Details
to legalize installation and removal of shoring and replacement of beams and columns performed without permit. | $75,000 |
| Sep 3, 2010 | Never finaled issued Sep 2010, no final | 211 Sutter St | street space & meterDetails
street space & meter | ||
| Aug 26, 2010 | Never finaled issued Aug 2010, no final | 211 Sutter St | Tear-N-It-Up Demolition Ince | remove interior finishes: partitions/carpet /suspended ceiling, cabinetsDetails
remove interior finishes: partitions/carpet /suspended ceiling, cabinets | $12,000 |
| Aug 11, 2010 | Never finaled issued Aug 2010, no final | 211 Sutter St | street spaceDetails
street space | ||
| Jul 13, 2010 | Never finaled issued Jul 2010, no final | 211 Sutter St | street space permit & mtaDetails
street space permit & mta | ||
| Jun 7, 2010 | Never finaled issued Jun 2010, no final | 211 Sutter St | street space and mtaDetails
street space and mta | ||
| Apr 27, 2010 | Never finaled issued Apr 2010, no final | 211 Sutter St | street space and mta parkingDetails
street space and mta parking | ||
| Mar 26, 2010 | Never finaled issued Sep 2010, no final | 211 Sutter St | Tom Lewis Restoration And Consulting | demo terracotta at exterior cornice. replace with gfrc on kearny st. elevation only.Details
demo terracotta at exterior cornice. replace with gfrc on kearny st. elevation only. | $50,000 |
| Mar 18, 2010 | Completed final sign-off May 2011 | 211 Sutter St | D A Pope Inc | 6th floor - to comply with bid nov 200456096 and installation of a moveable partition, str. details & calculations only. ref ap# 2009/1118/1521 for arch and (see pa #200911181521) no fire insp req.Details
6th floor - to comply with bid nov 200456096 and installation of a moveable partition, str. details & calculations only. ref ap# 2009/1118/1521 for arch and (see pa #200911181521) no fire insp req. | |
| Mar 16, 2010 | Never finaled issued Mar 2010, no final | 211 Sutter St | street space and mta parkingDetails
street space and mta parking | ||
| Mar 11, 2010 | Completed final sign-off Jan 2013 | 209 Sutter St | C B F Inc | 6th floor-life safety modifications at 211 sutter st, 6th fl, 5 wall mount strobes lights, 5 wall mount horn/strob, 1 remote notification power supply & 1 dual sync module & 1 new smoke detector & 2 new manual pull stations; smoke guard device on elevator under sep permit (p/a 200911181521)Details
6th floor-life safety modifications at 211 sutter st, 6th fl, 5 wall mount strobes lights, 5 wall mount horn/strob, 1 remote notification power supply & 1 dual sync module & 1 new smoke detector & 2 new manual pull stations; smoke guard device on elevator under sep permit (p/a 200911181521) | $6,000 |
| Mar 11, 2010 | Completed final sign-off Apr 2010 | 211 Sutter St | Ayoob & Peery Plumbing Co Inc | 6th floor-install fire sprinkler heads at fire escape windows. total of 2 heads. connect to (e), demo 2 (e) headsDetails
6th floor-install fire sprinkler heads at fire escape windows. total of 2 heads. connect to (e), demo 2 (e) heads | $900 |
| Feb 9, 2010 | Never finaled issued Feb 2010, no final | 211 Sutter St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Dec 21, 2009 | Completed final sign-off Sep 2010 | 211 Sutter St | Fnj Construction | furnish and install new ventialtion for 4th., 5th. 7th. floor restrooms, revision to 2009/1210/2983.Details
furnish and install new ventialtion for 4th., 5th. 7th. floor restrooms, revision to 2009/1210/2983. | $2,000 |
| Dec 18, 2009 | Never finaled issued Feb 2010, no final | 211 Sutter St | D A Pope Inc | office ti on ground floor lobby. work to include entry improvement, new entry doors, new storefront and finishes. fire alarm and mech separate permit....Details
office ti on ground floor lobby. work to include entry improvement, new entry doors, new storefront and finishes. fire alarm and mech separate permit.... | $37,620 |
| Dec 10, 2009 | Completed final sign-off Sep 2010 | 211 Sutter St | Fnj Construction | demo existing toilet room on 4th, 5th and 7th floors and construct new ada compliant toilet roomsDetails
demo existing toilet room on 4th, 5th and 7th floors and construct new ada compliant toilet rooms | $30,000 |
| Dec 8, 2009 | Never finaled issued Dec 2009, no final | 211 Sutter St | street spaceDetails
street space | ||
| Nov 18, 2009 | Completed final sign-off May 2010 | 211 Sutter St | D A Pope Inc | 6th floor: construction of 3-conf. rm., 1-storage, 1-break rm., 2 restrooms 7 3-private offices, mech., elec., life safety and sprinkler not under this permit.Details
6th floor: construction of 3-conf. rm., 1-storage, 1-break rm., 2 restrooms 7 3-private offices, mech., elec., life safety and sprinkler not under this permit. | $85,000 |
| Oct 5, 2009 | Never finaled issued Oct 2009, no final | 211 Sutter St | street space and mta parkingDetails
street space and mta parking | ||
| Sep 28, 2009 | Never finaled issued Oct 2009, no final | 211 Sutter St | Tear-N-It-Up Demolition Ince | project consists of demo only, space is unoccpupied, refer to ab017 for demo permits. maintain emerg lites, existing fire sprinklers and fire alarm system on floor.Details
project consists of demo only, space is unoccpupied, refer to ab017 for demo permits. maintain emerg lites, existing fire sprinklers and fire alarm system on floor. | $12,000 |
| Jan 30, 2008 | Never finaled issued Jan 2008, no final | 211 Sutter St | street space permitDetails
street space permit | ||
| Oct 30, 2003 | Never finaled issued Dec 2003, no final | 211 Sutter St | Golden Gate Sign Company Inc. | erect sign for electric, wall, sinngle facedDetails
erect sign for electric, wall, sinngle faced | $3,500 |
| Oct 30, 2003 | Never finaled issued Dec 2003, no final | 211 Sutter St | Golden Gate Sign Company Inc. | erect sign for electric , projecting, double facedDetails
erect sign for electric , projecting, double faced | $1,500 |
| Apr 8, 2003 | Expired or cancelled cancelled Sep 2007 | 165 Kearny St | Partee Construction Co | repair damage from previous tenant: dry wall as needed replace suspended ceilings replace lighting,Details
repair damage from previous tenant: dry wall as needed replace suspended ceilings replace lighting, | $42,000 |
| Apr 25, 2001 | Expired or cancelled cancelled Feb 2003 | 211 Sutter St | 2nd floor int improvements-legalize exist construction-2865 sf int non structural alterations to anDetails
2nd floor int improvements-legalize exist construction-2865 sf int non structural alterations to an | $20,000 | |
| Mar 1, 2001 | Expired or cancelled expired Sep 2001 | 211 Sutter St | Kim Lee Constrtuction | demolish existing non load bearing partitions on the 8th floor officeDetails
demolish existing non load bearing partitions on the 8th floor office | $7,500 |
| Feb 16, 2001 | Expired or cancelled expired Jun 2001 | 211 Sutter St | construction under sep permit (non structural work on 2nd flr)Details
construction under sep permit (non structural work on 2nd flr) | $2,000 | |
| Jan 11, 2001 | Expired or cancelled expired May 2001 | 211 Sutter St | one-stop:mk.tjoe legalize exisitng const. in (e) penthouse only includes sliding panels & coffee coDetails
one-stop:mk.tjoe legalize exisitng const. in (e) penthouse only includes sliding panels & coffee co | $4,800 | |
| Nov 10, 2000 | Expired or cancelled expired May 2001 | 211 Sutter St | International Waterproofing | install waterproof to sidewalkDetails
install waterproof to sidewalk | $22,000 |
| Oct 31, 2000 | Expired or cancelled expired Jun 2001 | 211 Sutter St | Metropolitan Electrical Construction | installation of 4 antennas and related equipmentDetails
installation of 4 antennas and related equipment | $25,000 |
Find contractors for work like this