Ingrid Schoenlank
- Listed as
- architect, authorized agent-others
- Firm
- Is Architects
- Based in
- San Rafael
- On San Francisco permits
- Jul 2007 to Sep 2026
9 permits since 2000 (architect on 8 permits, authorized agent-others on 1 permit): 2 completed, 2 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 308 Upper Tr | G&C Construction Services Inc. | replace rear porch and stairs, relocate door to interior on 1st levelDetails
replace rear porch and stairs, relocate door to interior on 1st level | $10,000 |
| Jun 2, 2025 | In progress issued Jun 2025 | 1273 28th Av | 1/f: add partition walls, insulation in exterior walls. replacement of handrail at interior stairway. 3/f: remodel 2 (e) bathrooms.Details
1/f: add partition walls, insulation in exterior walls. replacement of handrail at interior stairway. 3/f: remodel 2 (e) bathrooms. | $50,000 | |
| Mar 12, 2021 | Never finaled issued Dec 2022, no final | 1451 43rd Av | addition in backyard under (e) second story study. structure to be shored up, new structure to be installed, and new lighting to be installed. (e) plumbing to remainDetails
addition in backyard under (e) second story study. structure to be shored up, new structure to be installed, and new lighting to be installed. (e) plumbing to remain | $40,000 | |
| Sep 13, 2013 | Never finaled issued Oct 2013, no final | 189 Kearny St | Premier Structures Inc | for basement: new ada restroom, fitting room, floor and ceiling finishes, for gr fl lobby: new floor and ceiling finishes. all mep, ls and sprinklers to be under separate permits. jjcDetails
for basement: new ada restroom, fitting room, floor and ceiling finishes, for gr fl lobby: new floor and ceiling finishes. all mep, ls and sprinklers to be under separate permits. jjc | $150,000 |
| Aug 30, 2013 | Expired or cancelled cancelled Jan 2020 | 1750 Market St | change of use from deli to restaurant 49 persons occupancy partition wall to be addedDetails
change of use from deli to restaurant 49 persons occupancy partition wall to be added | $1,500 | |
| Mar 8, 2013 | Expired or cancelled withdrawn Aug 2013 | 1750 Market St | change of use. convert from deli to restuarant.Details
change of use. convert from deli to restuarant. | ||
| Aug 2, 2012 | Never finaled issued Nov 2012, no final | 1 Kearny St | Premier Structures Inc | installation of new material lift serving the lower basement, basement, 1st & 2nd floor, utilizing exisitng knock-out/shaft.Details
installation of new material lift serving the lower basement, basement, 1st & 2nd floor, utilizing exisitng knock-out/shaft. | $110,000 |
| Apr 6, 2012 | Completed final sign-off May 2012 | 2245 18th St | Jac Construction | unit #3 - revision to appl #2011.11.18.9255: work on 1st flr unit #2 - omit posts per plansDetails
unit #3 - revision to appl #2011.11.18.9255: work on 1st flr unit #2 - omit posts per plans | |
| Jul 23, 2007 | Completed final sign-off Apr 2009 | 1807 Jones St | #1807 and 1809- add additional bathroom and new washer/dryer hoop up.Details
#1807 and 1809- add additional bathroom and new washer/dryer hoop up. | $15,000 |