Block 4028, lot 017
2245 18th St
- City’s use
- Multi-Family Residential
- Built
- 1956
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 4,112 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 29, 2022 | Expired or cancelled cancelled Feb 2024 | 2245 18th St | voluntary strengthening of building by adding anchor bolts 5/8" diameter x 10" at 4' oc with epoxy.Details
voluntary strengthening of building by adding anchor bolts 5/8" diameter x 10" at 4' oc with epoxy. | $500 | |
| Jan 13, 2020 | Never finaled issued Jan 2020, no final | 2245 18th St | Rozen Home Builders Inc | add new subpanel on lower level. replace one existing water heater; new insulation r-19 for ceilings of open joist for (e) laundry area in lower level.Details
add new subpanel on lower level. replace one existing water heater; new insulation r-19 for ceilings of open joist for (e) laundry area in lower level. | $2,100 |
| Aug 24, 2017 | Completed final sign-off Jan 2018 | 2245 18th St | Rozen - Const | unit #2:revision to app#2017-0712-1697. remove wall between living room and master bed room. relocate kitchen. convert exist. kitchen to officeDetails
unit #2:revision to app#2017-0712-1697. remove wall between living room and master bed room. relocate kitchen. convert exist. kitchen to office | $20,000 |
| Jul 12, 2017 | Completed final sign-off Jan 2018 | 2245 18th St | unit #2: replace three windows to match windows replaced by permit in 2012 and 2015.visable from street inkind replacement.Details
unit #2: replace three windows to match windows replaced by permit in 2012 and 2015.visable from street inkind replacement. | $5,000 | |
| Jul 12, 2017 | Completed final sign-off Jan 2018 | 2245 18th St | #2: remove existing kitchen and bath fixtures and appliances, replace in kind. no changes to wall locationsDetails
#2: remove existing kitchen and bath fixtures and appliances, replace in kind. no changes to wall locations | $20,000 | |
| Aug 18, 2015 | Completed final sign-off Jul 2018 | 2245 18th St | work in unit 1 & 2: replace 6 windows in front with aluminium clad fiberglass windows with profile similar to existing. u factor less than or equal to 0.32.Details
work in unit 1 & 2: replace 6 windows in front with aluminium clad fiberglass windows with profile similar to existing. u factor less than or equal to 0.32. | $14,000 | |
| Apr 7, 2015 | Expired or cancelled cancelled Jan 2026 | 2245 18th St | rev. to 201501095335 -remove old/water damaged stucco ( or pieces) and replace in kind. est. approx. 5 to 10 sfDetails
rev. to 201501095335 -remove old/water damaged stucco ( or pieces) and replace in kind. est. approx. 5 to 10 sf | $5,000 | |
| Apr 7, 2015 | Completed final sign-off Jul 2018 | 2245 18th St | 10 sf stucco inkind replacement associated w/ previously-approved window replacement on front facade (san bruno ave elevation) revision to permit app#201501095335. remove old/water damaged stucco or pieces and replace in kind. n/a maher ordinance #155-13Details
10 sf stucco inkind replacement associated w/ previously-approved window replacement on front facade (san bruno ave elevation) revision to permit app#201501095335. remove old/water damaged stucco or pieces and replace in kind. n/a maher ordinance #155-13 | $5,000 | |
| Jan 9, 2015 | Completed final sign-off Jul 2018 | 2245 18th St | unit 4. replacing 3 windows with energy efficient windows white folding handle with interior aluminum screen and chacoal fiberglass mesh, stone white surround. same windows as approved in november of 2011Details
unit 4. replacing 3 windows with energy efficient windows white folding handle with interior aluminum screen and chacoal fiberglass mesh, stone white surround. same windows as approved in november of 2011 | $9,500 | |
| Apr 6, 2012 | Completed final sign-off May 2012 | 2245 18th St | Jac Construction | unit #3 - revision to appl #2011.11.18.9255: work on 1st flr unit #2 - omit posts per plansDetails
unit #3 - revision to appl #2011.11.18.9255: work on 1st flr unit #2 - omit posts per plans | |
| Nov 18, 2011 | Completed final sign-off May 2012 | 2245 18th St | B Doyle Construction | #3 - replace windows (front & side), relocate kitchen & kitchen plumbing, replace cabinets, remove wall between living room & (e) bedroom. replace bathroom fixtures, remove tub & re-tileDetails
#3 - replace windows (front & side), relocate kitchen & kitchen plumbing, replace cabinets, remove wall between living room & (e) bedroom. replace bathroom fixtures, remove tub & re-tile | $35,000 |
| Apr 20, 2011 | Completed final sign-off May 2011 | 2245 18th St | Kobliska Construction | #4- 7 kitchen cabinets installed in existing kitchen.Details
#4- 7 kitchen cabinets installed in existing kitchen. | $2,800 |
| Aug 30, 2005 | Completed final sign-off Nov 2005 | 2245 18th St | Dinyari Construction Inc. | reroofingDetails
reroofing | $12,724 |
| Jul 13, 2005 | Expired or cancelled expired Jan 2012 | 2245 18th St | Dinyari Construction Inc. | reroofingDetails
reroofing | $9,870 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.