Cs Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Oct 2019
- Last 24 months
- 0 permits filed
18 permits since 2000: 17 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2019 | Completed final sign-off Feb 2020 | 878 Elizabeth St | new skylight and new pocket doors between living rm and kitchenDetails
new skylight and new pocket doors between living rm and kitchen | $5,000 |
| Sep 27, 2019 | Completed final sign-off Feb 2020 | 878 Elizabeth St | kitchen remodel. no demo of wall.Details
kitchen remodel. no demo of wall. | $45,000 |
| Apr 1, 2019 | Completed final sign-off May 2019 | 544 Mississippi St | kitchen / bathroom remodel. kitchen and bathroom 11' x 13' and 4' x 8' respectivelyDetails
kitchen / bathroom remodel. kitchen and bathroom 11' x 13' and 4' x 8' respectively | $25,000 |
| Sep 4, 2018 | Completed final sign-off Jan 2019 | 1625 Lake St | remove 6'-0" length of kitchen wall per plan (3rd fl). new kitchen cabinets & appliances. no work at lower levelsDetails
remove 6'-0" length of kitchen wall per plan (3rd fl). new kitchen cabinets & appliances. no work at lower levels | $19,000 |
| Jul 23, 2018 | Completed final sign-off Dec 2018 | 50 Woodhaven Ct | remodel bathroom in-kind, same location. no moving doors or walls. 30sf.Details
remodel bathroom in-kind, same location. no moving doors or walls. 30sf. | $15,000 |
| Apr 13, 2018 | Completed final sign-off Aug 2018 | 50 Woodhaven Ct | bathroom remodel - in kind. same location. no moving of doors or walls.Details
bathroom remodel - in kind. same location. no moving of doors or walls. | $20,000 |
| Sep 1, 2017 | Completed final sign-off Mar 2018 | 1544 Lake St | kitchen remodel: new cabinets, counter tops, sheet rock, flooring. no walls moved, removed, added or infilled. all (e) layouts to reamin unchanges.Details
kitchen remodel: new cabinets, counter tops, sheet rock, flooring. no walls moved, removed, added or infilled. all (e) layouts to reamin unchanges. | $27,000 |
| Sep 26, 2016 | Completed final sign-off Feb 2017 | 3526 Scott St | kitchen & bathroom remodel.Details
kitchen & bathroom remodel. | $35,000 |
| Apr 15, 2016 | Completed final sign-off Jul 2016 | 1 Amethyst Wy | kitchen remodel - to comply with cec150(k)Details
kitchen remodel - to comply with cec150(k) | $25,000 |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 170 11th Av | kitchen remodel in-kind.Details
kitchen remodel in-kind. | $20,000 |
| Dec 8, 2015 | Completed final sign-off Jul 2016 | 918 Teresita Bl | kitchen remodel and bathroom remodel.Details
kitchen remodel and bathroom remodel. | $30,000 |
| Jun 22, 2015 | Completed final sign-off Aug 2015 | 730 43rd Av | inkind stucco repair on upper portion of front facade (approx. 100 sf); no bbns or open pc code enforcement cases.Details
inkind stucco repair on upper portion of front facade (approx. 100 sf); no bbns or open pc code enforcement cases. | $2,500 |
| Jul 24, 2013 | Completed final sign-off Nov 2013 | 297 Magellan Av | interior only remodel of existing bathroom - new finishes, new fixtures, removal of non-load bearing partition, new lighting & fan, new built in cabinets.Details
interior only remodel of existing bathroom - new finishes, new fixtures, removal of non-load bearing partition, new lighting & fan, new built in cabinets. | $17,500 |
| May 9, 2011 | Completed final sign-off Oct 2011 | 7 Cottage Rw | ordinary in kind repair and maintenance of less than 50% of garbage shed and fence. dry rot in shed, fence broken at right side of backyardDetails
ordinary in kind repair and maintenance of less than 50% of garbage shed and fence. dry rot in shed, fence broken at right side of backyard | $10,000 |
| Apr 15, 2010 | Completed final sign-off Jul 2010 | 7 Cottage Rw | new boards on surface of deck to replace dry rot, prox 240 sq.ft. new doors on existing tool shed on webster-side of deck, replacement in kind, not visible from the streetDetails
new boards on surface of deck to replace dry rot, prox 240 sq.ft. new doors on existing tool shed on webster-side of deck, replacement in kind, not visible from the street | $5,000 |
| Sep 11, 2008 | Expired or cancelled withdrawn Sep 2008 | 743 45th Av | the front staircase has leak and need to be repaired or replaced before rainy season. less than 50% repair all work in kind.Details
the front staircase has leak and need to be repaired or replaced before rainy season. less than 50% repair all work in kind. | $10,000 |
| Jun 13, 2008 | Completed final sign-off Aug 2008 | 3294 Clay St | bathroom remodel and extend closet & linen.Details
bathroom remodel and extend closet & linen. | $15,000 |
| Aug 11, 2006 | Completed final sign-off Dec 2006 | 257 Whitney St | kitchen remodel (non-structural)Details
kitchen remodel (non-structural) | $50,000 |