Block 0273, lot 005
730 Bush St
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 4
- Units
- 19
- Rooms
- 20 bathrooms
- Building
- 11,400 sq ft
- Lot
- 3,598 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2022 | Expired or cancelled cancelled Jan 2026 | 730 Bush St | upgrade to existing commercial entry to comply with accessible business entrance ordinance 51-16. ref abe 201812173061Details
upgrade to existing commercial entry to comply with accessible business entrance ordinance 51-16. ref abe 201812173061 | $8,000 | |
| Dec 8, 2022 | Expired or cancelled cancelled Jan 2026 | 722 Bush St | upgrade to existing commercial entry to comply with accessible business entrance ordinance 51-16. ref abe 201812173063Details
upgrade to existing commercial entry to comply with accessible business entrance ordinance 51-16. ref abe 201812173063 | $3,000 | |
| Dec 16, 2021 | Completed final sign-off Mar 2022 | 726 Bush St | Axel8 Construction | unit 403. revision to pa# 202110281351 (kitchen and bath - no plan). rehabilitate existing kitchen, rehab existing bathroom, install washer and dryer.Details
unit 403. revision to pa# 202110281351 (kitchen and bath - no plan). rehabilitate existing kitchen, rehab existing bathroom, install washer and dryer. | $5,000 |
| Oct 28, 2021 | Never finaled issued Oct 2021, no final | 726 Bush St | Axel8 Construction | unit 403: rehab (e) kitchen and rehab (e) bathroom. non structural, all in kind.Details
unit 403: rehab (e) kitchen and rehab (e) bathroom. non structural, all in kind. | $28,000 |
| May 13, 2021 | Completed final sign-off Nov 2021 | 726 Bush St | Au Electric Corporation/Aec Alarms | as-built submittal by fire inspetor's request. ref. pa # 2020-1030-7879. changes are circled in bubble on the plan. facp changes from nfw-100x to nfs-320. facp relocation from bsmt to 1st fl lobby. removed annunciator, relocated gateway to 2nd fl & 4th fl. install 3 additional smoke detectors, oDetails
as-built submittal by fire inspetor's request. ref. pa # 2020-1030-7879. changes are circled in bubble on the plan. facp changes from nfw-100x to nfs-320. facp relocation from bsmt to 1st fl lobby. removed annunciator, relocated gateway to 2nd fl & 4th fl. install 3 additional smoke detectors, o | |
| Apr 21, 2021 | Completed final sign-off Sep 2021 | 726 Bush St | Axel8 Construction | #301: 1)revision to app#202104098232. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
#301: 1)revision to app#202104098232. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $35,000 |
| Apr 9, 2021 | Completed final sign-off Sep 2021 | 726 Bush St | Axel8 Construction | unit 301 - rehabilitated (e) kitchan and bathroom. lighting comply w/ cec 150.0 (k)3 high efficacy in kitchen. lighting comply w/ cec 150.0 (k)5 high efficacy in bath. no removal of any wall.Details
unit 301 - rehabilitated (e) kitchan and bathroom. lighting comply w/ cec 150.0 (k)3 high efficacy in kitchen. lighting comply w/ cec 150.0 (k)5 high efficacy in bath. no removal of any wall. | $30,000 |
| Oct 30, 2020 | Completed final sign-off Nov 2021 | 726 Bush St | Au Electric Corporation/Aec Alarms | upgradde the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72.Details
upgradde the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72. | $50,000 |
| Oct 21, 2020 | Never finaled issued Oct 2020, no final | 726 Bush St | Axel8 Construction | unit 304: rehabilitate (e) kitchen and bathroom. install washer & dryer in (e) closet. no removal of any walls.Details
unit 304: rehabilitate (e) kitchen and bathroom. install washer & dryer in (e) closet. no removal of any walls. | $30,000 |
| May 7, 2019 | Expired or cancelled cancelled Jan 2026 | 726 Bush St | on 4th floor - unit 404 - rehabilitate existing kitchen and bathroom and install washer & dryerDetails
on 4th floor - unit 404 - rehabilitate existing kitchen and bathroom and install washer & dryer | $30,000 | |
| Mar 20, 2019 | Completed final sign-off Sep 2019 | 726 Bush St | Axel8 Construction | #404 - remodel kitchen & bathDetails
#404 - remodel kitchen & bath | $18,000 |
| Mar 1, 2019 | Never finaled issued Mar 2019, no final | 726 Bush St | Axel8 Construction | unit 302 - revision to pa 2018-1212-8094. convert existing kitchen to office, relocate kitchen, relocate bedroom/relocate living room, rehabilitate existing bathroomDetails
unit 302 - revision to pa 2018-1212-8094. convert existing kitchen to office, relocate kitchen, relocate bedroom/relocate living room, rehabilitate existing bathroom | |
| Dec 12, 2018 | Never finaled issued Dec 2018, no final | 726 Bush St | Axel8 Construction | unit #302 - rehabilitate (e) kitchen relocate bathroom, convert (e) bathroom to a study. install w/d maher naDetails
unit #302 - rehabilitate (e) kitchen relocate bathroom, convert (e) bathroom to a study. install w/d maher na | $40,000 |
| Mar 14, 2016 | Completed final sign-off Oct 2016 | 724 Bush St | Kobuksan Construction | remodel interior adjacent space for additonal seating. remodel bath and existing counter for service. frame new opening between 2n adjacent space. reinstall awningDetails
remodel interior adjacent space for additonal seating. remodel bath and existing counter for service. frame new opening between 2n adjacent space. reinstall awning | $35,000 |
| Feb 2, 2016 | Never finaled issued Feb 2016, no final | 722 Bush St | Rod Heisler Construction | replace storefront & clearstory windows at vacant tenant space. n/a ordinance #155-13. ti under separate permit. ab-017 applies.Details
replace storefront & clearstory windows at vacant tenant space. n/a ordinance #155-13. ti under separate permit. ab-017 applies. | $10,000 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 722 Bush St | street spaceDetails
street space | ||
| Oct 22, 2015 | Completed final sign-off Jan 2016 | 722 Bush St | Rain Defense | reroofingDetails
reroofing | |
| Jul 15, 2015 | Never finaled issued Jul 2015, no final | 722 Bush St | Kobuksan Construction | exploratory demo of existing space. tenant improvement under separate permit.Details
exploratory demo of existing space. tenant improvement under separate permit. | $1,500 |
| Mar 12, 2015 | Completed final sign-off Jul 2015 | 726 Bush St | Kwan Wo Ironworks Inc | #101- remodel kitchen & bathroom in kind. interior work only. n/a ordinace #155-13.Details
#101- remodel kitchen & bathroom in kind. interior work only. n/a ordinace #155-13. | $10,000 |
| Feb 27, 2015 | Never finaled issued Feb 2015, no final | 726 Bush St | street space permitDetails
street space permit | ||
| Jan 27, 2015 | Never finaled issued Jan 2015, no final | 726 Bush St | street space and mtaDetails
street space and mta | ||
| Nov 20, 2014 | Completed final sign-off Apr 2015 | 726 Bush St | Cal Inc. | interior renovation of existing 1 bedroom apartment unit (202) of a 4 story building with basement. remodel bath and kitchen. no change to building envelope. occupant load and gross area mechanical systemDetails
interior renovation of existing 1 bedroom apartment unit (202) of a 4 story building with basement. remodel bath and kitchen. no change to building envelope. occupant load and gross area mechanical system | $16,000 |
| Aug 20, 2013 | Completed final sign-off Nov 2013 | 724 Bush St | Kobuksan Construction | build a new service counterDetails
build a new service counter | $3,000 |
| Dec 2, 2008 | Never finaled issued Dec 2008, no final | 726 Bush St | street space permit only.Details
street space permit only. | ||
| Oct 15, 2008 | Never finaled issued Oct 2008, no final | 726 Bush St | street space.Details
street space. | ||
| Dec 3, 2004 | Completed final sign-off Dec 2004 | 726 Bush St | Wong Construction Inc | install r-30 insulation under roof (in attic)Details
install r-30 insulation under roof (in attic) | $4,500 |
| Oct 6, 2004 | Completed final sign-off Dec 2004 | 726 Bush St | Wong Construction Inc | reroofingDetails
reroofing | $9,500 |
| Aug 4, 2004 | Completed final sign-off May 2006 | 722 Bush St | Wong Construction Inc | seismic retrofit the subj ump by bolt plus procedure including installing lateral frames of steel toDetails
seismic retrofit the subj ump by bolt plus procedure including installing lateral frames of steel to | $90,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (8), Kobuksan Construction (3), Wong Construction Inc (3), Au Electric Corporation/Aec Alarms (2), Cal Inc., Kwan Wo Ironworks Inc, Rain Defense, Rod Heisler Construction
- Architects
- Serina Calhoun (2), Benjamin Tarcher, Troy Kashanipour
- Engineers
- Jefferson Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.