Back to bathroom remodel contractors
Kobuksan Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Aug 2026
- Last 24 months
- 18 permits filed
105 permits since 2000: 66 completed, 16 in progress, 10 never finaled, 13 expired or cancelled.
Of the 10 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 26 completed, 2 in progress, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 640 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2026 | In progress issued May 2026 | 2603 23rd St | 2603 23rd st: kitchen & bathroom remodel, new skylight, new bathroom next to kitchen. 1206 utah: kitchen & bathroom remodel, new skylight, new bathroom next to rear bedroom.Details
2603 23rd st: kitchen & bathroom remodel, new skylight, new bathroom next to kitchen. 1206 utah: kitchen & bathroom remodel, new skylight, new bathroom next to rear bedroom. | $65,000 |
| Mar 10, 2025 | Completed final sign-off Mar 2026 | 2234 40th Av | remodel kitchen with new cabinets and counter no layout change, remodel bathroom with new vanity and tile work no layout change. no removal of wall for both roomsDetails
remodel kitchen with new cabinets and counter no layout change, remodel bathroom with new vanity and tile work no layout change. no removal of wall for both rooms | $8,500 |
| Mar 4, 2025 | In progress issued Mar 2025 | 2384 Fulton St | first floor (ref 202211176715) - to include adding hardie siding. unit a- addition of 1 (n) window opening located in kitchen. unit b- relocate kitchen . second floor (ref 202009204569) unit 1 - 2x bathroom remodel to include relocate sinks and toilets.Details
first floor (ref 202211176715) - to include adding hardie siding. unit a- addition of 1 (n) window opening located in kitchen. unit b- relocate kitchen . second floor (ref 202009204569) unit 1 - 2x bathroom remodel to include relocate sinks and toilets. | $5,000 |
| Dec 19, 2022 | Never finaled issued Feb 2023, no final | 1506 Sanchez St | (3)kitchen and bath remodel. repair minor dry rot at rear stair and close permit complaint# 202285976 and permit complaint 202285979 (dirty water heater water). all work for units: 1506, 1508, and 1510. stair dryrot repair in kind, less than 50%.Details
(3)kitchen and bath remodel. repair minor dry rot at rear stair and close permit complaint# 202285976 and permit complaint 202285979 (dirty water heater water). all work for units: 1506, 1508, and 1510. stair dryrot repair in kind, less than 50%. | $25,000 |
| Jan 26, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | unit 207: kitchen & bath remodel. no layout change.Details
unit 207: kitchen & bath remodel. no layout change. | $51,300 |
| Jan 26, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | unit 208: kitchen & bath remodel. no layout change.Details
unit 208: kitchen & bath remodel. no layout change. | $51,300 |
| Jan 25, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (unit 205): kitchen & bathroom remodel in kind.Details
(unit 205): kitchen & bathroom remodel in kind. | $51,300 |
| Jan 25, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (unit 203): kitchen & bathroom remodel in kind.Details
(unit 203): kitchen & bathroom remodel in kind. | $51,300 |
| Jan 25, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (unit 206): kitchen & bathroom remodel in kind.Details
(unit 206): kitchen & bathroom remodel in kind. | $51,300 |
| Jan 22, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (1) kitchen and (2) bath romodel, no layout changesDetails
(1) kitchen and (2) bath romodel, no layout changes | $51,300 |
| Jan 22, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (1) kitchen and (2) bath romodel, no layout changesDetails
(1) kitchen and (2) bath romodel, no layout changes | $51,300 |
| Jan 22, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | (1) kitchen and (2) bath romodel, no layout changesDetails
(1) kitchen and (2) bath romodel, no layout changes | $51,300 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | kitchen & bath remodel. no layout changes.Details
kitchen & bath remodel. no layout changes. | $51,300 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | kitchen & bath remodel. no layout changes.Details
kitchen & bath remodel. no layout changes. | $51,300 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | kitchen & bath remodel. no layout changes.Details
kitchen & bath remodel. no layout changes. | $51,300 |
| Jan 13, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | kitchen & bath remodel. no layout changes.Details
kitchen & bath remodel. no layout changes. | $51,300 |
| Jan 13, 2021 | Completed final sign-off Dec 2022 | 2418 20th Av | install new cabinets in kitchen and new plumbing fixture replace for sink and 2 bathrooms. replace 6 fci receptacles no layout changes.Details
install new cabinets in kitchen and new plumbing fixture replace for sink and 2 bathrooms. replace 6 fci receptacles no layout changes. | $51,300 |
| Feb 26, 2020 | Completed final sign-off Sep 2020 | 3790 16th St | repair/replace all wall & floor tiles in 2x bathrooms due to leak & damage. layouts to remain & reinstall vanities, toilets, etc to existing after new tile. reuse existing fixtures. replace in kindDetails
repair/replace all wall & floor tiles in 2x bathrooms due to leak & damage. layouts to remain & reinstall vanities, toilets, etc to existing after new tile. reuse existing fixtures. replace in kind | $12,000 |
| Feb 12, 2020 | Completed final sign-off Sep 2020 | 8200 Oceanview Tr | apt 121: replace sheetrock only: to run lights & reinstall sheetrock & fixtures in kitchen & bathroom once electrical is complete.Details
apt 121: replace sheetrock only: to run lights & reinstall sheetrock & fixtures in kitchen & bathroom once electrical is complete. | $12,000 |
| Jun 21, 2019 | Completed final sign-off Nov 2019 | 3212 Broderick St | the project generally consistes of the alteration of the 3rd floor to alter an extg bathroom and add one new bathroom. no exterior work to be done. all work is contained within the extg bldg envelope. n/a for maher.Details
the project generally consistes of the alteration of the 3rd floor to alter an extg bathroom and add one new bathroom. no exterior work to be done. all work is contained within the extg bldg envelope. n/a for maher. | $35,000 |
| Jul 27, 2018 | Completed final sign-off Nov 2019 | 189 Commonwealth Av | int. remodel unit #1: (e) kitchen converted to (n) bedroom, (e) bath converted to (n) kitchen, (e) den converted to (n) bath., (n) closet between (e) bathroom & (e) living room. mep and structural work per scope/plan.Details
int. remodel unit #1: (e) kitchen converted to (n) bedroom, (e) bath converted to (n) kitchen, (e) den converted to (n) bath., (n) closet between (e) bathroom & (e) living room. mep and structural work per scope/plan. | $80,000 |
| Aug 18, 2016 | Expired or cancelled expired Sep 2018 | 3233 22nd St | change of use from vacant comm retail to commercial workshop teaching kitchen. plbg & elec, new ada compliance unisex bathroom. new light fixtures. exterior work - demolition of plywood & signage at front glass transom to restore orig transom. replace storefront door. signage under separate permit.Details
change of use from vacant comm retail to commercial workshop teaching kitchen. plbg & elec, new ada compliance unisex bathroom. new light fixtures. exterior work - demolition of plywood & signage at front glass transom to restore orig transom. replace storefront door. signage under separate permit. | $50,000 |
| Jun 9, 2016 | Expired or cancelled cancelled Jan 2026 | 2701 40th Av | first bathroom remodel: replace ext storage/closet with shower to make it a full bathroom.Details
first bathroom remodel: replace ext storage/closet with shower to make it a full bathroom. | $2,500 |
| Mar 31, 2016 | Completed final sign-off Aug 2016 | 1058 Hyde St | remodel ada bathroom single use.Details
remodel ada bathroom single use. | $5,000 |
| Mar 14, 2016 | Completed final sign-off Oct 2016 | 724 Bush St | remodel interior adjacent space for additonal seating. remodel bath and existing counter for service. frame new opening between 2n adjacent space. reinstall awningDetails
remodel interior adjacent space for additonal seating. remodel bath and existing counter for service. frame new opening between 2n adjacent space. reinstall awning | $35,000 |
| Feb 29, 2016 | Completed final sign-off Oct 2017 | 767 Pine St | remodeling to 2nd,3rd & 4th floor including kitchen & bathrooms, replace (e) windows with marvin integrity wood/ultrex, replace (e) foundation in front half of bldg.Details
remodeling to 2nd,3rd & 4th floor including kitchen & bathrooms, replace (e) windows with marvin integrity wood/ultrex, replace (e) foundation in front half of bldg. | $60,000 |
| Feb 24, 2016 | Completed final sign-off Aug 2016 | 2701 40th Av | 1 kitchen & 2 bathroom remodel. all layout in-kind. upgrade appliances. no walls to be altered.Details
1 kitchen & 2 bathroom remodel. all layout in-kind. upgrade appliances. no walls to be altered. | $35,000 |
| Nov 5, 2015 | Completed final sign-off May 2016 | 1177 California St | install 36" door in partition wall for bathroom access, remove tub and tile for stading shower, relocate outlet for gfciDetails
install 36" door in partition wall for bathroom access, remove tub and tile for stading shower, relocate outlet for gfci | $13,500 |
| Nov 5, 2015 | Completed final sign-off Dec 2015 | 601 Van Ness Av | replace tub surround & floor tiles in bathroom. change shower fixt, vanity & install new ceiling (2x) recessed lights. replace ceiling fan. change floor tiles in kitchen. n/a for maher.Details
replace tub surround & floor tiles in bathroom. change shower fixt, vanity & install new ceiling (2x) recessed lights. replace ceiling fan. change floor tiles in kitchen. n/a for maher. | $11,000 |
| Sep 30, 2010 | Completed final sign-off Nov 2010 | 1446 Moraga St | to comply with nov 201039379; remove kitchen cabinets (illegal existing use) in garage space. install 5/8" drywall in garage wall for 1hr. fire rated wall. legalize basement room/bathroom, bedroom and living room.Details
to comply with nov 201039379; remove kitchen cabinets (illegal existing use) in garage space. install 5/8" drywall in garage wall for 1hr. fire rated wall. legalize basement room/bathroom, bedroom and living room. | $30,000 |
| Jul 25, 2007 | Completed final sign-off May 2009 | 328 Joost Av | 2nd story bath room addition (new), includes (n) plumnbihng, electrical, windows, roof etc. as required for bath room addition.Details
2nd story bath room addition (new), includes (n) plumnbihng, electrical, windows, roof etc. as required for bath room addition. | $18,500 |