Scott Cibotti
- Listed as
- architect, engineer
- Firm
- Cibotti Engineering
- Based in
- San Ramon
- On San Francisco permits
- Mar 2014 to Feb 2026
18 permits since 2000 (engineer on 16 permits, architect on 2 permits): 6 completed, 4 in progress, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2026 | In progress filed Feb 2026, not yet issued | 416 Molimo Dr | to develop (e) basement to create 2 new bedrooms & 1 bathroom, wet bar. new 609 sq. ft. (including staircase). relocate tank water heater & furnace in the crawlspace behind the new bathroom.Details
to develop (e) basement to create 2 new bedrooms & 1 bathroom, wet bar. new 609 sq. ft. (including staircase). relocate tank water heater & furnace in the crawlspace behind the new bathroom. | $44,900 | |
| Feb 6, 2026 | In progress issued Feb 2026 | 156 Tucker Av | K&H Construction Development Inc | replace affected framing and stucco siding per attached structural drawing. work in kindDetails
replace affected framing and stucco siding per attached structural drawing. work in kind | $7,200 |
| Jan 21, 2026 | In progress issued Jan 2026 | 24 White St | Tao Mountain Construction Inc | revision to pa #2025-1031-8701: repair basement floor side wall foundation at remodeled area. replace all single pane windows & doors to energy compliant windows.Details
revision to pa #2025-1031-8701: repair basement floor side wall foundation at remodeled area. replace all single pane windows & doors to energy compliant windows. | $5,000 |
| Oct 31, 2025 | In progress issued Nov 2025 | 24 White St | 47 sf new addition of the main floor by converting the part of couryard to a dinning space. convert part of living room into one additional bedroom in front of building. repair (e) rear yard wood deck & stair - no expanstion or (n) stair. alteration of 2 bath rooms(including 1(n) bathroom @ 1st flr.Details
47 sf new addition of the main floor by converting the part of couryard to a dinning space. convert part of living room into one additional bedroom in front of building. repair (e) rear yard wood deck & stair - no expanstion or (n) stair. alteration of 2 bath rooms(including 1(n) bathroom @ 1st flr. | $25,000 | |
| Nov 20, 2023 | Completed final sign-off Oct 2024 | 516 Oak St | Gmbc Construction Inc | addition of 365 sq. ft. for new steam shower next to (e) bathroomDetails
addition of 365 sq. ft. for new steam shower next to (e) bathroom | $110,000 |
| Sep 6, 2023 | Completed final sign-off Apr 2024 | 4528 17th St | A2z Remodeling Inc. | revision to 202301170261. remove bearing & non-bearing walls in the kitchen and provide a new kitchen cabinet layout including island, change (e) arched insulated glass/aluminum windows to new aluminum frames & install 4 new aluminum windows in office, remove non-load bearing wall in upstair bath &Details
revision to 202301170261. remove bearing & non-bearing walls in the kitchen and provide a new kitchen cabinet layout including island, change (e) arched insulated glass/aluminum windows to new aluminum frames & install 4 new aluminum windows in office, remove non-load bearing wall in upstair bath & | $40,000 |
| Aug 15, 2022 | Completed final sign-off Aug 2023 | 424 Grafton Av | Future Vision Remodeling Inc. | revision to pa# 202203150052. engineering footing for kitchen remodel.Details
revision to pa# 202203150052. engineering footing for kitchen remodel. | |
| Mar 15, 2022 | Completed final sign-off Dec 2022 | 424 Grafton Av | Future Vision Remodeling Inc. | kitchen & bathroom remodel. remove wall between kiitchen & living room. install new floor in kitchen. add kitchen island. relocate toilet & remove (e) shower. tub position like for like. open a niche in tub area.Details
kitchen & bathroom remodel. remove wall between kiitchen & living room. install new floor in kitchen. add kitchen island. relocate toilet & remove (e) shower. tub position like for like. open a niche in tub area. | $60,000 |
| Jan 4, 2018 | Never finaled issued May 2021, no final | 313 Castro St | Kanler Inc, Connemara Fine Trim Inc Dba Highland Bui | add 1 bedroom & 1 office on 3rd fl. revision to expired bpa# 201708225549 (vertical addition on the 3rd fl roof deck)Details
add 1 bedroom & 1 office on 3rd fl. revision to expired bpa# 201708225549 (vertical addition on the 3rd fl roof deck) | $55,000 |
| Jan 4, 2018 | Never finaled issued Feb 2018, no final | 313 Castro St | Kanler Inc | revision to app#201708225549, refer (3) - demolish the bathroom on the 2nd floor and re-framing the extg deck and deck stair on the 2nd floor.Details
revision to app#201708225549, refer (3) - demolish the bathroom on the 2nd floor and re-framing the extg deck and deck stair on the 2nd floor. | $45,000 |
| Oct 16, 2017 | Expired or cancelled cancelled Jan 2026 | 313 Castro St | Kanler Inc | revision to app#201708225549 and 201705015342 and 201701267992. demolition the bathroom on the 2nd floors and framing the extg deckDetails
revision to app#201708225549 and 201705015342 and 201701267992. demolition the bathroom on the 2nd floors and framing the extg deck | $25,000 |
| Sep 29, 2017 | Never finaled issued Oct 2017, no final | 313 Castro St | Kanler Inc | shoring for the basement foundation. app 201708225549Details
shoring for the basement foundation. app 201708225549 | $8,000 |
| Aug 22, 2017 | Expired or cancelled expired Sep 2018 | 313 Castro St | Kanler Inc, Ace Drilling & Excavation | revision to pa 2017-0501-5342 and 2017-0126-7992 - add laundry rm. on 2/f, add (2) (n) bathrooms in 3rd fl. add a retaining wall at the front of 1st fl.Details
revision to pa 2017-0501-5342 and 2017-0126-7992 - add laundry rm. on 2/f, add (2) (n) bathrooms in 3rd fl. add a retaining wall at the front of 1st fl. | $15,000 |
| Aug 18, 2017 | Never finaled issued Feb 2018, no final | 313 Castro St | Kanler Inc | convert (e) 1st floor to a 2nd unit. add 2 bedrooms, 1 bathroom, kitchen, living area & dining area in the 1st floor.Details
convert (e) 1st floor to a 2nd unit. add 2 bedrooms, 1 bathroom, kitchen, living area & dining area in the 1st floor. | $70,000 |
| May 1, 2017 | Expired or cancelled expired Sep 2018 | 313 Castro St | Kanler Inc | revision to pa 2017-0126-7992, revision to stairs and foundationDetails
revision to pa 2017-0126-7992, revision to stairs and foundation | $40,000 |
| Jul 14, 2014 | Never finaled issued Aug 2014, no final | 240 Ewing Tr | Cesar Garcia General Contractor Inc | revision to existing pa #2012.1025.2861 - structural reinforcement on ground floorDetails
revision to existing pa #2012.1025.2861 - structural reinforcement on ground floor | $1,000 |
| Apr 30, 2014 | Completed final sign-off Jun 2015 | 720 02nd Av | Bai Construction | soft story retrofit per sfbc chapter 34b. 2012 iebc app a-4Details
soft story retrofit per sfbc chapter 34b. 2012 iebc app a-4 | $60,000 |
| Mar 21, 2014 | Completed final sign-off Jun 2015 | 332 Presidio Av | Bai Construction | soft story retrofit per sfbc chapter 34b. engineering criteria is asce41-06.Details
soft story retrofit per sfbc chapter 34b. engineering criteria is asce41-06. | $60,000 |