Casey Burdett Ramirez
- Listed as
- architect
- Firm
- Caha Design Group
- Based in
- Oakland
- On San Francisco permits
- Feb 2023 to Apr 2026
19 permits since 2000 (architect on 19 permits): 15 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2026 | Completed final sign-off Sep 2026 | 801 Wisconsin St | remodel of (e) bathroom and new second guest bathroom (e) partition and door. (n) non structural partitions. (n) 100 am sub panel, (n) ducted heat pump system on l2. replace rear siding.replace 2 (e) skylights .Details
remodel of (e) bathroom and new second guest bathroom (e) partition and door. (n) non structural partitions. (n) 100 am sub panel, (n) ducted heat pump system on l2. replace rear siding.replace 2 (e) skylights . | $10,000 | |
| Dec 29, 2025 | In progress issued Jun 2026 | 3215 Broderick St | Tolentino Construction & Restoration Inc | vertical addition. renovation & expansion of (e) 2 units. add level 4, set back from front & rear. reduction of north lightwell. reduce footprint of garage. expand lower unit down into rear garage level (level 1). expand upper unit up to new level 4.Details
vertical addition. renovation & expansion of (e) 2 units. add level 4, set back from front & rear. reduction of north lightwell. reduce footprint of garage. expand lower unit down into rear garage level (level 1). expand upper unit up to new level 4. | $1,000,000 |
| Jul 9, 2025 | Completed final sign-off Feb 2026 | 2241 Fillmore St | David A Nice Builders Inc | ref 202506259427- electrical work for ti. redevelopment of existing electrical for retail.Details
ref 202506259427- electrical work for ti. redevelopment of existing electrical for retail. | $100,000 |
| May 16, 2025 | Completed final sign-off Oct 2025 | 909 Broderick St | revision to pa# 202501168457, demo (e) kitchen windows, demo (e) bedroom windows, replace bedroom and kitchen windows in-kind. windows not visible from streetDetails
revision to pa# 202501168457, demo (e) kitchen windows, demo (e) bedroom windows, replace bedroom and kitchen windows in-kind. windows not visible from street | $50,000 | |
| May 9, 2025 | Completed final sign-off Sep 2025 | 917 Broderick St | renovation of (e) 2-story multi family. remove and replace front facade window in office in kind. demolish (e) deck. new deck with staircase. remove interior partition in kitchen. no addition of plumbing fixtures.Details
renovation of (e) 2-story multi family. remove and replace front facade window in office in kind. demolish (e) deck. new deck with staircase. remove interior partition in kitchen. no addition of plumbing fixtures. | $20,000 | |
| Jan 30, 2025 | Completed final sign-off Feb 2025 | 917 Broderick St | Drake Construction | 3rd fl - renovation of (e) 3-story two-family home (flats).3rd floor: remove brick chimney -infill framing and roof, patch and repair roofing and flooring. (n) 2x4 office wall partition with pocket door. (n) lighting and electrical for office move hvac supply focred air duct to different location.Details
3rd fl - renovation of (e) 3-story two-family home (flats).3rd floor: remove brick chimney -infill framing and roof, patch and repair roofing and flooring. (n) 2x4 office wall partition with pocket door. (n) lighting and electrical for office move hvac supply focred air duct to different location. | $50,000 |
| Jan 16, 2025 | Completed final sign-off Oct 2025 | 909 Broderick St | Y& G Construction Inc | demo (e) kitchen & partition wall and associated electrical and gas lines.r/r electrical subpanel.demo (e) rear facade door and window with new in-kind.demo (e0 kitchen window. new kitchen: new appliances,finishes and cabinets. new plumb & elect. add bedroom at rear and move kitchen from rearDetails
demo (e) kitchen & partition wall and associated electrical and gas lines.r/r electrical subpanel.demo (e) rear facade door and window with new in-kind.demo (e0 kitchen window. new kitchen: new appliances,finishes and cabinets. new plumb & elect. add bedroom at rear and move kitchen from rear | $50,000 |
| May 17, 2024 | In progress issued Jun 2024 | 255 Turk St | Bryan Leon | comply with nov 202420612: renovation of laundromat. new non rated interior framing, new drywall, new dropped ceiling grid, new ductwork, new lighting, new finishes, restroom remodel.Details
comply with nov 202420612: renovation of laundromat. new non rated interior framing, new drywall, new dropped ceiling grid, new ductwork, new lighting, new finishes, restroom remodel. | $50,000 |
| Apr 19, 2024 | Completed final sign-off Sep 2024 | 909 Broderick St | demolish (e) rear exterior level 3 deck and staircase. replace deck and staircase with (n) footprint.Details
demolish (e) rear exterior level 3 deck and staircase. replace deck and staircase with (n) footprint. | $5,000 | |
| Mar 1, 2024 | Completed final sign-off Mar 2024 | 1056 Florida St | revision to pa# 202309186830 rennovation of (e) entry staircase. removal and replace staircase in kind.Details
revision to pa# 202309186830 rennovation of (e) entry staircase. removal and replace staircase in kind. | ||
| Dec 21, 2023 | Expired or cancelled expired Apr 2026 | 2511 Octavia St | foundation upgrade and seismic strengthening at crawlspace. complete encapsulation of (e) brick foundation with concrete foundation. (n) interior shear walls in crawlspace.Details
foundation upgrade and seismic strengthening at crawlspace. complete encapsulation of (e) brick foundation with concrete foundation. (n) interior shear walls in crawlspace. | $50,000 | |
| Nov 15, 2023 | Completed final sign-off Jul 2024 | 2808 23rd St | to comply with nov 202311364. to replace existing exterior 2nd level rear deck.Details
to comply with nov 202311364. to replace existing exterior 2nd level rear deck. | $2,500 | |
| Oct 27, 2023 | Completed final sign-off Dec 2024 | 2052 Greenwich St | Verona Remodeling, Am Construction Inc | revision to 202308094078. replace (e) door with window. (n) sliding door at exterior. (n) glass door replaces (e) wood door. revised lighting plan.Details
revision to 202308094078. replace (e) door with window. (n) sliding door at exterior. (n) glass door replaces (e) wood door. revised lighting plan. | |
| Oct 27, 2023 | In progress filed Oct 2023, not yet issued | 701 Kansas St | rear horizontal and vertical addition.additon of anew unit with dedicated entrace off 19th st,an accessory dwelling unit over an (e)garage.scope of work includes an interior remodel @ all fls with(n)exterior finishes.Details
rear horizontal and vertical addition.additon of anew unit with dedicated entrace off 19th st,an accessory dwelling unit over an (e)garage.scope of work includes an interior remodel @ all fls with(n)exterior finishes. | $850,000 | |
| Aug 9, 2023 | Completed final sign-off Jan 2025 | 2052 Greenwich St | Verona Remodeling, Am Construction Inc | creating new work room at level 1, door and window at rear facade, new lighting and power at work room. voluntary seismic retrofit. new bathroom at level 1, replace garage door. replace gas furnaces for both units.Details
creating new work room at level 1, door and window at rear facade, new lighting and power at work room. voluntary seismic retrofit. new bathroom at level 1, replace garage door. replace gas furnaces for both units. | $58,000 |
| Jul 5, 2023 | Completed final sign-off Sep 2023 | 410 24th Av | change of use from retail to gym. paint, plastering, replace old drywall, replace outlet covers, change light fixtures. no layout changes, no shower, no juice bar, no hot tub.Details
change of use from retail to gym. paint, plastering, replace old drywall, replace outlet covers, change light fixtures. no layout changes, no shower, no juice bar, no hot tub. | $5,000 | |
| Jun 8, 2023 | Completed final sign-off Aug 2023 | 723 Foerster St | Verona Remodeling | convert laundry room to storage room. relocate water line and drain pipe. relocate electrical outlet and add some lighting. insulate room, and new non-bearing wall with door.Details
convert laundry room to storage room. relocate water line and drain pipe. relocate electrical outlet and add some lighting. insulate room, and new non-bearing wall with door. | $15,000 |
| Jun 5, 2023 | Completed final sign-off Aug 2023 | 92 Judah St | only a change of use: no architectural modificaiton to be made. changing from restaurant to art studio.Details
only a change of use: no architectural modificaiton to be made. changing from restaurant to art studio. | ||
| Feb 15, 2023 | Completed final sign-off Apr 2023 | 567 Kansas St | revision to pa #202208301568. demolish & infill interior staircase. re-frame interior passageway.Details
revision to pa #202208301568. demolish & infill interior staircase. re-frame interior passageway. | $1,000 |