Verona Remodeling
- Based in
- Hayward
- On San Francisco permits
- Apr 2022 to Mar 2026
- Last 24 months
- 3 permits filed
12 permits since 2000: 10 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | Completed final sign-off Jul 2026 | 716 Fillmore St | replace cabinets in kitchen, in kind. no plumbing. add 1 electrical receptacle for new over, 240v.electrical permit separedDetails
replace cabinets in kitchen, in kind. no plumbing. add 1 electrical receptacle for new over, 240v.electrical permit separed | $20,000 |
| Dec 3, 2025 | Completed final sign-off Jul 2026 | 317 Precita Av | bathroom and kitchen renovation, relocate laundry, add new toilet in existing bathroom, new cabinets installation. rear horizontal addition deck and new door.Details
bathroom and kitchen renovation, relocate laundry, add new toilet in existing bathroom, new cabinets installation. rear horizontal addition deck and new door. | $55,000 |
| Mar 17, 2025 | In progress issued Mar 2025 | 1883 10th Av | replace siding & windows in kind. some rotten repair areas due to water damage approx 1500 sq. ftDetails
replace siding & windows in kind. some rotten repair areas due to water damage approx 1500 sq. ft | $46,000 |
| Mar 26, 2024 | Completed final sign-off Feb 2026 | 88 Yukon St | convert a portion of the ground floor storage area to habitable space. replace & reconfigure one entry stair, & relocate a full bathroom on the ground floor. remodel one kitchen & 3 bathrooms. add new windows & doors at the front facade. correction to planning complaint #2023-006519 enfDetails
convert a portion of the ground floor storage area to habitable space. replace & reconfigure one entry stair, & relocate a full bathroom on the ground floor. remodel one kitchen & 3 bathrooms. add new windows & doors at the front facade. correction to planning complaint #2023-006519 enf | $400,000 |
| Feb 16, 2024 | In progress issued Feb 2024 | 27 Parker Av | replace floor and cabinets in the kitchen (no electrical and plumbing)Details
replace floor and cabinets in the kitchen (no electrical and plumbing) | $10,000 |
| Oct 27, 2023 | Completed final sign-off Dec 2024 | 2052 Greenwich St | revision to 202308094078. replace (e) door with window. (n) sliding door at exterior. (n) glass door replaces (e) wood door. revised lighting plan.Details
revision to 202308094078. replace (e) door with window. (n) sliding door at exterior. (n) glass door replaces (e) wood door. revised lighting plan. | |
| Aug 9, 2023 | Completed final sign-off Jan 2025 | 2052 Greenwich St | creating new work room at level 1, door and window at rear facade, new lighting and power at work room. voluntary seismic retrofit. new bathroom at level 1, replace garage door. replace gas furnaces for both units.Details
creating new work room at level 1, door and window at rear facade, new lighting and power at work room. voluntary seismic retrofit. new bathroom at level 1, replace garage door. replace gas furnaces for both units. | $58,000 |
| Jun 8, 2023 | Completed final sign-off Aug 2023 | 723 Foerster St | convert laundry room to storage room. relocate water line and drain pipe. relocate electrical outlet and add some lighting. insulate room, and new non-bearing wall with door.Details
convert laundry room to storage room. relocate water line and drain pipe. relocate electrical outlet and add some lighting. insulate room, and new non-bearing wall with door. | $15,000 |
| Aug 31, 2022 | Completed final sign-off Oct 2022 | 1 Daniel Burnham Ct | unit #918. replace tile from bathtub walls. replace water valve. replace bathtub.Details
unit #918. replace tile from bathtub walls. replace water valve. replace bathtub. | $23,000 |
| May 31, 2022 | Completed final sign-off Aug 2022 | 58 Cumberland St | replace extg cabinets in the kitchen area. relocate the water and drain pipe for sink in the kitchen area.Details
replace extg cabinets in the kitchen area. relocate the water and drain pipe for sink in the kitchen area. | $19,000 |
| May 13, 2022 | Completed final sign-off Oct 2022 | 2054 Greenwich St | convert existing laundry room to bathroom, also relocate water and gas line for laundry machines.Details
convert existing laundry room to bathroom, also relocate water and gas line for laundry machines. | $20,000 |
| Apr 19, 2022 | Completed final sign-off Oct 2022 | 2054 Greenwich St | remove non bearing wall- minor modification interior partitionDetails
remove non bearing wall- minor modification interior partition | $800 |