Verona Remodeling
- Based in
- Hayward
- On San Francisco permits
- Apr 2022 to Mar 2026
- Last 24 months
- 3 permits filed
12 permits since 2000: 10 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 in progress. Typically 5 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | Completed final sign-off Jul 2026 | 716 Fillmore St | replace cabinets in kitchen, in kind. no plumbing. add 1 electrical receptacle for new over, 240v.electrical permit separedDetails
replace cabinets in kitchen, in kind. no plumbing. add 1 electrical receptacle for new over, 240v.electrical permit separed | $20,000 |
| Dec 3, 2025 | Completed final sign-off Jul 2026 | 317 Precita Av | bathroom and kitchen renovation, relocate laundry, add new toilet in existing bathroom, new cabinets installation. rear horizontal addition deck and new door.Details
bathroom and kitchen renovation, relocate laundry, add new toilet in existing bathroom, new cabinets installation. rear horizontal addition deck and new door. | $55,000 |
| Mar 26, 2024 | Completed final sign-off Feb 2026 | 88 Yukon St | convert a portion of the ground floor storage area to habitable space. replace & reconfigure one entry stair, & relocate a full bathroom on the ground floor. remodel one kitchen & 3 bathrooms. add new windows & doors at the front facade. correction to planning complaint #2023-006519 enfDetails
convert a portion of the ground floor storage area to habitable space. replace & reconfigure one entry stair, & relocate a full bathroom on the ground floor. remodel one kitchen & 3 bathrooms. add new windows & doors at the front facade. correction to planning complaint #2023-006519 enf | $400,000 |
| Feb 16, 2024 | In progress issued Feb 2024 | 27 Parker Av | replace floor and cabinets in the kitchen (no electrical and plumbing)Details
replace floor and cabinets in the kitchen (no electrical and plumbing) | $10,000 |
| May 31, 2022 | Completed final sign-off Aug 2022 | 58 Cumberland St | replace extg cabinets in the kitchen area. relocate the water and drain pipe for sink in the kitchen area.Details
replace extg cabinets in the kitchen area. relocate the water and drain pipe for sink in the kitchen area. | $19,000 |