Block 6549, lot 015
144 Clipper St
- City’s use
- Single Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,555 sq ft
- Lot
- 2,850 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 20, 2024 | Completed final sign-off Sep 2024 | 144 Clipper St | Liaison Landscapes Inc | extend existing 110 (v) circuit into landscape for future use. trench a 18" depth and stub up junction box above the landscape grade.Details
extend existing 110 (v) circuit into landscape for future use. trench a 18" depth and stub up junction box above the landscape grade. | $800 |
| Jan 12, 2023 | Completed final sign-off Sep 2023 | 144 Clipper St | Christopher Gate Construction Inc | revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & libraryDetails
revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & library | $1,500 |
| Oct 7, 2022 | Completed final sign-off Sep 2023 | 144 Clipper St | Christopher Gate Construction Inc | interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, light fixtures and paint.Details
interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, light fixtures and paint. | $700,000 |
| Apr 22, 2022 | Completed final sign-off May 2022 | 144 Clipper St | replace like for like - dry rot at garage door. repair trim around garage in kind. no work on door itself.Details
replace like for like - dry rot at garage door. repair trim around garage in kind. no work on door itself. | $2,000 | |
| Nov 12, 2019 | Completed final sign-off Sep 2020 | 144 Clipper St | repair (e) rear deck; less than 50% - addendum to permit pa# 2019-1001-3170 to address dry rot. not visible from street.Details
repair (e) rear deck; less than 50% - addendum to permit pa# 2019-1001-3170 to address dry rot. not visible from street. | $2,500 | |
| Oct 1, 2019 | Completed final sign-off Sep 2020 | 144 Clipper St | reroof flat 20 x 10 extension, replace like for like water damage and dry rot. including decking and siding as needed. not visible from street. less than 50%Details
reroof flat 20 x 10 extension, replace like for like water damage and dry rot. including decking and siding as needed. not visible from street. less than 50% | $5,000 | |
| Sep 11, 2013 | Never finaled issued Sep 2013, no final | 144 Clipper St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Feb 3, 2009 | Completed final sign-off Aug 2009 | 144 Clipper St | Peter Harris Construction Inc | strenghten an (e) victorian staircase by updating the system of beams, posts & headers of the opening (replace 2 (e) & add 1 new beam)-interior only.Details
strenghten an (e) victorian staircase by updating the system of beams, posts & headers of the opening (replace 2 (e) & add 1 new beam)-interior only. | $5,000 |
| Feb 8, 2007 | Completed final sign-off Jun 2007 | 144 Clipper St | Peter Harris Construction Inc | revision to pa#200506235879. delete master bath (sheet a1.2)Details
revision to pa#200506235879. delete master bath (sheet a1.2) | |
| Jun 19, 2006 | Completed final sign-off Oct 2008 | 144 Clipper St | structural revision to pa# 2005/06/23/5879 project is under construction: revision to roof framing at front to limit disruption to (e) roof framing, revised 7/s5 to reflect as-built condition.Details
structural revision to pa# 2005/06/23/5879 project is under construction: revision to roof framing at front to limit disruption to (e) roof framing, revised 7/s5 to reflect as-built condition. | ||
| Jun 23, 2005 | Completed final sign-off Apr 2007 | 144 Clipper St | interior remodel to include reworking of (e)bathrooms,new interior stair to garage and addition of entry foyer.new bath & modify hallway upstairs,new closet,a master bedroom.new storage-garage.exterior work to include 2'deep horiz.addition at entry & bath upstairs,new stair at rear to garage storageDetails
interior remodel to include reworking of (e)bathrooms,new interior stair to garage and addition of entry foyer.new bath & modify hallway upstairs,new closet,a master bedroom.new storage-garage.exterior work to include 2'deep horiz.addition at entry & bath upstairs,new stair at rear to garage storage | $170,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Christopher Gate Construction Inc (2), Peter Harris Construction Inc (2), Liaison Landscapes Inc
- Architects
- Abigail S Lubniewski (2), Scott Colson
- Engineers
- Cheng Tang (2), David Yadegar, Dil Kazzaz
Find contractors for work like this