Abigail Lubniewski
- Listed as
- architect
- On San Francisco permits
- Nov 2019 to Sep 2023
7 permits since 2000 (architect on 7 permits): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 6, 2023 | Completed final sign-off Dec 2024 | 3544 Baker St | Cook Construction | structural upgrades within (e) bldg envelope in preparation for a future addition, to be permitted seperately. no changes to architectural features.Details
structural upgrades within (e) bldg envelope in preparation for a future addition, to be permitted seperately. no changes to architectural features. | $80,000 |
| Jan 12, 2023 | Completed final sign-off Sep 2023 | 144 Clipper St | Christopher Gate Construction Inc | revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & libraryDetails
revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & library | $1,500 |
| Oct 7, 2022 | Completed final sign-off Sep 2023 | 144 Clipper St | Christopher Gate Construction Inc | interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, light fixtures and paint.Details
interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, light fixtures and paint. | $700,000 |
| Oct 8, 2021 | Completed final sign-off Mar 2022 | 70 Linda St | Blair Burke General Contractors Inc | remodel (e) bathroom. infill 1 lightwell. revision to 2021 0601 1333 (no plans)Details
remodel (e) bathroom. infill 1 lightwell. revision to 2021 0601 1333 (no plans) | $30,000 |
| Sep 8, 2021 | Completed final sign-off Feb 2023 | 36 Parnassus Av | Blair Burke General Contractors Inc | interior renovation to 2 story 2 unit residence. work only 1st/2nd fl to include new stair between 1st and 2nd fl. no exterior or facade work. no work in prow. no change useDetails
interior renovation to 2 story 2 unit residence. work only 1st/2nd fl to include new stair between 1st and 2nd fl. no exterior or facade work. no work in prow. no change use | $365,000 |
| Feb 8, 2021 | Completed final sign-off Oct 2021 | 1360 Dolores St | Blair Burke General Contractors Inc | rev to pa202008131669 including but not limited to adding a skylight in thektichen and oening up an (e) load bearing wall.Details
rev to pa202008131669 including but not limited to adding a skylight in thektichen and oening up an (e) load bearing wall. | $60,000 |
| Nov 19, 2019 | Never finaled issued Nov 2019, no final | 670 Clay St | 4 Diamond Construction Inc | new ada batroom, mop sink room, pantry, storage room, new ceiling & lighting, new millwork, new fan exhaust unit, elec panel relocationDetails
new ada batroom, mop sink room, pantry, storage room, new ceiling & lighting, new millwork, new fan exhaust unit, elec panel relocation | $152,500 |