O'reilly Construction
- Based in
- San Bruno
- On San Francisco permits
- Sep 2020 to Sep 2026
- Last 24 months
- 11 permits filed
20 permits since 2000: 16 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1956 Fell St | 2nd floor, remove existing laundry equipment, install new shower, vanity and toilet, no wall stud demolition or construction.Details
2nd floor, remove existing laundry equipment, install new shower, vanity and toilet, no wall stud demolition or construction. | $18,000 |
| Jul 2, 2026 | In progress issued Aug 2026 | 3601 Ortega St | add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area.Details
add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area. | $150,000 |
| Nov 24, 2025 | Completed final sign-off Apr 2026 | 2831 Bryant St | rebuild (e) exterior front stair and landing and (n) handrailsDetails
rebuild (e) exterior front stair and landing and (n) handrails | $18,000 |
| Nov 13, 2025 | Completed final sign-off Apr 2026 | 1711 Haight St | add existing vacant commercial space (1715 haight st.) to (e) adjacent commercial space (1711 haight st.) no exterior changes. new massage rooms and lighting, (e) hvac systemDetails
add existing vacant commercial space (1715 haight st.) to (e) adjacent commercial space (1711 haight st.) no exterior changes. new massage rooms and lighting, (e) hvac system | $50,000 |
| Oct 31, 2025 | Completed final sign-off Feb 2026 | 827 Irving St | tenant improvment remodel (e) retail to excercise training space with new equipment fixtures and finishes and new lobby.Details
tenant improvment remodel (e) retail to excercise training space with new equipment fixtures and finishes and new lobby. | $30,000 |
| Oct 21, 2025 | Completed final sign-off Jul 2026 | 1 Marview Wy | at 1/f: remodel (e) 1/f spacew to family and remodel (e) master ste. at 2/f: remodel (e) kitchen and bathroom. work per plan.Details
at 1/f: remodel (e) 1/f spacew to family and remodel (e) master ste. at 2/f: remodel (e) kitchen and bathroom. work per plan. | $178,565 |
| Aug 29, 2025 | Completed final sign-off Dec 2025 | 640 Castro St | at 2nd floor unit 640 - remove (e) wall to enlarge opening to 7'4" remodel (e) dining room to bedroomDetails
at 2nd floor unit 640 - remove (e) wall to enlarge opening to 7'4" remodel (e) dining room to bedroom | $25,000 |
| Apr 24, 2025 | In progress issued Apr 2025 | 1715 Haight St | demo lath & plaster on walls strip to studs, per sfbc ab-017Details
demo lath & plaster on walls strip to studs, per sfbc ab-017 | $5,000 |
| Feb 28, 2025 | Completed final sign-off Mar 2025 | 1506 Lombard St | comply with nov 202426832 item #2: replace (e) rotted window with new wooden window.Details
comply with nov 202426832 item #2: replace (e) rotted window with new wooden window. | $1,200 |
| Feb 18, 2025 | In progress issued May 2026 | 639 Edinburgh St | abate complaint #2024-31597 - remodel (e) deck to achieve code compliance. install 1-hour fire rated walls at side lot lines.Details
abate complaint #2024-31597 - remodel (e) deck to achieve code compliance. install 1-hour fire rated walls at side lot lines. | $5,000 |
| Oct 11, 2024 | Completed final sign-off Nov 2024 | 448 Grove St | change of use, tenant improvement, remodel (e) hair salon to exercised training space w/ (n) locker room, change room, equipment fixtures & finishes.Details
change of use, tenant improvement, remodel (e) hair salon to exercised training space w/ (n) locker room, change room, equipment fixtures & finishes. | $30,000 |
| Sep 16, 2024 | Completed final sign-off Aug 2025 | 1422 46th Av | first floor remodel (e) space to (n) media room, (n) laundry, (n) bath and bedroom. second floor remodel (e) 2 bedrooms, (2) bathrooms, (n) interior stair, (n) skylights and (n) rear deck with stairDetails
first floor remodel (e) space to (n) media room, (n) laundry, (n) bath and bedroom. second floor remodel (e) 2 bedrooms, (2) bathrooms, (n) interior stair, (n) skylights and (n) rear deck with stair | $155,000 |
| Aug 14, 2024 | Completed final sign-off Oct 2024 | 579 Elizabeth St | remodel of master bathroom located at rear. replace existing window in kind. not street facing. mep will be under separte permitDetails
remodel of master bathroom located at rear. replace existing window in kind. not street facing. mep will be under separte permit | $20,000 |
| Aug 12, 2024 | Completed final sign-off Nov 2024 | 440 Guerrero St | at rear building - repair (e) rear exit stairs in kind, no more than 50%Details
at rear building - repair (e) rear exit stairs in kind, no more than 50% | $5,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 637 29th Av | remove 2 non structural interior walls, remodel kitchen, remodel bathroom at 2nd level unit. add plywood to stiffen 2nd fl walls.Details
remove 2 non structural interior walls, remodel kitchen, remodel bathroom at 2nd level unit. add plywood to stiffen 2nd fl walls. | $80,000 |
| May 31, 2024 | Completed final sign-off Aug 2024 | 916 Clement St | comply with abe #202405170105. install powered actuator at entry. replace door. renovate restroom for accessible compliance. extend hardrails at stairs.Details
comply with abe #202405170105. install powered actuator at entry. replace door. renovate restroom for accessible compliance. extend hardrails at stairs. | $18,000 |
| May 2, 2024 | Completed final sign-off Aug 2024 | 110 06th Av | unit#2: remodel (e) kitchen and bathrom in kind. electrical and plumbing by othersDetails
unit#2: remodel (e) kitchen and bathrom in kind. electrical and plumbing by others | $40,000 |
| Feb 26, 2024 | Completed final sign-off Nov 2024 | 114 Granville Wy | remodel extg kitchen, laundry, and bedroom closet.Details
remodel extg kitchen, laundry, and bedroom closet. | $75,000 |
| Aug 17, 2021 | Completed final sign-off Jul 2026 | 260 Theresa St | unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndwDetails
unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndw | $100,000 |
| Sep 11, 2020 | Completed final sign-off Mar 2024 | 518 Castro St | 1st fl: tenant improvement to existing vacant retail space for new pharmacy. new non-bearing non-rated partitions, new ada restroom to server pharmacy staff, new consult room, new lighting, new sales counter, new suspended ceiling, new outlets.Details
1st fl: tenant improvement to existing vacant retail space for new pharmacy. new non-bearing non-rated partitions, new ada restroom to server pharmacy staff, new consult room, new lighting, new sales counter, new suspended ceiling, new outlets. | $150,000 |