O'reilly Construction
- Based in
- San Bruno
- On San Francisco permits
- Sep 2020 to Sep 2026
- Last 24 months
- 11 permits filed
20 permits since 2000: 15 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 in progress. Typically 57 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2025 | Completed final sign-off Apr 2026 | 2831 Bryant St | rebuild (e) exterior front stair and landing and (n) handrailsDetails
rebuild (e) exterior front stair and landing and (n) handrails | $18,000 |
| Sep 16, 2024 | Completed final sign-off Aug 2025 | 1422 46th Av | first floor remodel (e) space to (n) media room, (n) laundry, (n) bath and bedroom. second floor remodel (e) 2 bedrooms, (2) bathrooms, (n) interior stair, (n) skylights and (n) rear deck with stairDetails
first floor remodel (e) space to (n) media room, (n) laundry, (n) bath and bedroom. second floor remodel (e) 2 bedrooms, (2) bathrooms, (n) interior stair, (n) skylights and (n) rear deck with stair | $155,000 |
| Aug 12, 2024 | Completed final sign-off Nov 2024 | 440 Guerrero St | at rear building - repair (e) rear exit stairs in kind, no more than 50%Details
at rear building - repair (e) rear exit stairs in kind, no more than 50% | $5,000 |
| May 31, 2024 | Completed final sign-off Aug 2024 | 916 Clement St | comply with abe #202405170105. install powered actuator at entry. replace door. renovate restroom for accessible compliance. extend hardrails at stairs.Details
comply with abe #202405170105. install powered actuator at entry. replace door. renovate restroom for accessible compliance. extend hardrails at stairs. | $18,000 |
| Aug 17, 2021 | In progress issued Aug 2024 | 260 Theresa St | unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndwDetails
unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndw | $100,000 |