Back to bathroom remodel contractors
O'reilly Construction
- Based in
- San Bruno
- On San Francisco permits
- Sep 2020 to Sep 2026
- Last 24 months
- 11 permits filed
20 permits since 2000: 15 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 15 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2026 | In progress issued Aug 2026 | 3601 Ortega St | add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area.Details
add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area. | $150,000 |
| Oct 21, 2025 | Completed final sign-off Jul 2026 | 1 Marview Wy | at 1/f: remodel (e) 1/f spacew to family and remodel (e) master ste. at 2/f: remodel (e) kitchen and bathroom. work per plan.Details
at 1/f: remodel (e) 1/f spacew to family and remodel (e) master ste. at 2/f: remodel (e) kitchen and bathroom. work per plan. | $178,565 |
| Sep 16, 2024 | Completed final sign-off Aug 2025 | 1422 46th Av | first floor remodel (e) space to (n) media room, (n) laundry, (n) bath and bedroom. second floor remodel (e) 2 bedrooms, (2) bathrooms, (n) interior stair, (n) skylights and (n) rear deck with stairDetails
first floor remodel (e) space to (n) media room, (n) laundry, (n) bath and bedroom. second floor remodel (e) 2 bedrooms, (2) bathrooms, (n) interior stair, (n) skylights and (n) rear deck with stair | $155,000 |
| Aug 14, 2024 | Completed final sign-off Oct 2024 | 579 Elizabeth St | remodel of master bathroom located at rear. replace existing window in kind. not street facing. mep will be under separte permitDetails
remodel of master bathroom located at rear. replace existing window in kind. not street facing. mep will be under separte permit | $20,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 637 29th Av | remove 2 non structural interior walls, remodel kitchen, remodel bathroom at 2nd level unit. add plywood to stiffen 2nd fl walls.Details
remove 2 non structural interior walls, remodel kitchen, remodel bathroom at 2nd level unit. add plywood to stiffen 2nd fl walls. | $80,000 |