Back to kitchen remodel contractors
O'reilly Construction
- Based in
- San Bruno
- On San Francisco permits
- Sep 2020 to Sep 2026
- Last 24 months
- 11 permits filed
20 permits since 2000: 15 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 in progress. Typically 28 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2026 | In progress issued Aug 2026 | 3601 Ortega St | add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area.Details
add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area. | $150,000 |
| Oct 21, 2025 | Completed final sign-off Jul 2026 | 1 Marview Wy | at 1/f: remodel (e) 1/f spacew to family and remodel (e) master ste. at 2/f: remodel (e) kitchen and bathroom. work per plan.Details
at 1/f: remodel (e) 1/f spacew to family and remodel (e) master ste. at 2/f: remodel (e) kitchen and bathroom. work per plan. | $178,565 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 637 29th Av | remove 2 non structural interior walls, remodel kitchen, remodel bathroom at 2nd level unit. add plywood to stiffen 2nd fl walls.Details
remove 2 non structural interior walls, remodel kitchen, remodel bathroom at 2nd level unit. add plywood to stiffen 2nd fl walls. | $80,000 |
| May 2, 2024 | Completed final sign-off Aug 2024 | 110 06th Av | unit#2: remodel (e) kitchen and bathrom in kind. electrical and plumbing by othersDetails
unit#2: remodel (e) kitchen and bathrom in kind. electrical and plumbing by others | $40,000 |
| Feb 26, 2024 | Completed final sign-off Nov 2024 | 114 Granville Wy | remodel extg kitchen, laundry, and bedroom closet.Details
remodel extg kitchen, laundry, and bedroom closet. | $75,000 |
| Aug 17, 2021 | In progress issued Aug 2024 | 260 Theresa St | unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndwDetails
unit legalization at grnd flr udu. demo unpermitted bathrm & stair at rear. install dr & window at rear wall. construct (n) landing, replace front bedrm window. (n) alcove at garage entry to unit. 2nd flr- (n) opening btwn kitchen & storage. remove roof deck & stair. replace (e) rear wall dr w/ wndw | $100,000 |