Kevin O'connor
- Listed as
- architect, engineer
- Firm
- Kevin O'connor Inc
- On San Francisco permits
- Feb 2014 to Feb 2026
10 permits since 2000 (engineer on 9 permits, architect on 1 permit): 6 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Feb 2026 | 32 Gough St | Saint Bridget Construction Inc | partial foundation replacement.Details
partial foundation replacement. | $15,000 |
| Aug 7, 2025 | In progress issued Oct 2025 | 1431 31st Av | Handyman Heroes Inc. | revision to pa# 202309196867, to remove welding inspection. custom guardrail replaced with pre-manufactured stem.Details
revision to pa# 202309196867, to remove welding inspection. custom guardrail replaced with pre-manufactured stem. | |
| Oct 11, 2023 | Completed final sign-off Nov 2024 | 3054 Octavia St | Oarcon Inc | add additional dwelling unit (adu)@ 1st floor by converting rear part of garage. provide new kitchen and bathroom at adu. new adu per state government code sec 66314.Details
add additional dwelling unit (adu)@ 1st floor by converting rear part of garage. provide new kitchen and bathroom at adu. new adu per state government code sec 66314. | $150,000 |
| Nov 22, 2022 | In progress issued Mar 2025 | 4319 21st St | Jakcon, Inc | at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard.Details
at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard. | $75,000 |
| Jul 22, 2021 | Completed final sign-off Aug 2021 | 248 Colon Av | Cooke And Mccann Inc | revision to 2019 1031 6030. reduce excavation scope @ rear yard. add wood retaining wall to accommodated access to rear yard. change opening at 1st fire wallDetails
revision to 2019 1031 6030. reduce excavation scope @ rear yard. add wood retaining wall to accommodated access to rear yard. change opening at 1st fire wall | |
| Dec 24, 2019 | Completed final sign-off Jun 2021 | 56 Badger St | ground stroy: transform bedroom into two bedrooms; relocate stairways to upstairs, add three bathrooms. infill 3'x12.5' addition under esisting building. upper story: remodel kitchen and bathroom. remove 2 interior walls.Details
ground stroy: transform bedroom into two bedrooms; relocate stairways to upstairs, add three bathrooms. infill 3'x12.5' addition under esisting building. upper story: remodel kitchen and bathroom. remove 2 interior walls. | $45,000 | |
| Oct 14, 2016 | Completed final sign-off Oct 2017 | 1871 Church St | Collins Construction Inc | installation sequence to accommodate foundation constructionDetails
installation sequence to accommodate foundation construction | |
| Sep 6, 2016 | Completed final sign-off Apr 2021 | 1907 Oak St | Francisco Zarceno | soft story compliance 2012 iebc appendix a-4Details
soft story compliance 2012 iebc appendix a-4 | $50,000 |
| May 27, 2014 | Expired or cancelled cancelled Feb 2021 | 551 45th Av | add new rear deck.Details
add new rear deck. | $15,000 | |
| Feb 21, 2014 | Completed final sign-off Oct 2015 | 420 Alvarado St | Green Construction And Electric | to comply w/ nov # 201314441 & 201337261 #201310229876 for purpose dcp notification. installation of (n) deck per plans.Details
to comply w/ nov # 201314441 & 201337261 #201310229876 for purpose dcp notification. installation of (n) deck per plans. |