Block 6630, lot 041
527 29th St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,122 sq ft
- Lot
- 2,850 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 12, 2025 | Completed final sign-off Mar 2025 | 527 29th St | M P Roofing Inc | reroofing no hot worksDetails
reroofing no hot works | $15,000 |
| Aug 5, 2024 | Completed final sign-off Apr 2025 | 527 29th St | Huff Construction Company Inc | rev to pa# 2023-0323-4225: remove/replace roof at area of work. replace front builidng wall at attic level (reroofing under sep permit)Details
rev to pa# 2023-0323-4225: remove/replace roof at area of work. replace front builidng wall at attic level (reroofing under sep permit) | $5,000 |
| Jun 7, 2024 | Completed final sign-off Apr 2025 | 527 29th St | Huff Construction Company Inc | rev 202303234225- reframe front porch and replace finishes in kind due to dry rot. replace and repair more than 50% of porch facing street.Details
rev 202303234225- reframe front porch and replace finishes in kind due to dry rot. replace and repair more than 50% of porch facing street. | $18,000 |
| Jun 4, 2024 | Completed final sign-off Mar 2025 | 527 29th St | Huff Construction Company Inc | replace (4) wood, double hung windows at front of building with 4 wood clad, double hung windows. same openings.Details
replace (4) wood, double hung windows at front of building with 4 wood clad, double hung windows. same openings. | $13,000 |
| Apr 17, 2024 | Completed final sign-off Apr 2025 | 527 29th St | Huff Construction Company Inc | remodel (2) existing bathrooms with new fixtures and finishes. one bath on 1/f and one bath on 2/f. non structural remodel. remodel in-kind.Details
remodel (2) existing bathrooms with new fixtures and finishes. one bath on 1/f and one bath on 2/f. non structural remodel. remodel in-kind. | $39,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2025 | 527 29th St | Huff Construction Company Inc | convert (e) attic into (n) conditional space 3rd story w/ 2 bedrooms, 1 bath, 1 powder rm, 2 (n) interior stairs connecting (n) 3rd story to (e) 2nd story. 3 (n) heat pump space heating, 3 (n) domers on (e) pitched roof. adding 497 sf in converted attic.Details
convert (e) attic into (n) conditional space 3rd story w/ 2 bedrooms, 1 bath, 1 powder rm, 2 (n) interior stairs connecting (n) 3rd story to (e) 2nd story. 3 (n) heat pump space heating, 3 (n) domers on (e) pitched roof. adding 497 sf in converted attic. | $80,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2019 | 527 29th St | Morena Llc /Dba: Tony's Windows & Glass | all vinyl replacement sash and frame assembly up bed: replace within existing opening 1 casement shash of stationary safety panel @ lower section downstairs family room: 1st and 2 replace with in kind single hung windows: maintain bedroom e.r.w opening. work not visible from street.Details
all vinyl replacement sash and frame assembly up bed: replace within existing opening 1 casement shash of stationary safety panel @ lower section downstairs family room: 1st and 2 replace with in kind single hung windows: maintain bedroom e.r.w opening. work not visible from street. | $3,885 |
| Apr 11, 2008 | Completed final sign-off May 2008 | 527 29th St | Amber - Tru Construction Inc. | remove areas of rot around windows @ rear of building & replace framing & siding. nothing visible from street.Details
remove areas of rot around windows @ rear of building & replace framing & siding. nothing visible from street. | $4,000 |
| Jun 26, 2007 | Expired or cancelled cancelled Aug 2021 | 527 29th St | revise (e) house 4'-9" to allow for new garage proposal. convert attic level to legal habitable space (bedrooms, bathrooms). construct new interior stair and deck stair. new rear addition of 4'-0" depth.Details
revise (e) house 4'-9" to allow for new garage proposal. convert attic level to legal habitable space (bedrooms, bathrooms). construct new interior stair and deck stair. new rear addition of 4'-0" depth. | $200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Huff Construction Company Inc (5), Amber - Tru Construction Inc., M P Roofing Inc, Morena Llc /Dba: Tony's Windows & Glass
- Architects
- Jorge Carbonell
- Engineers
- Michael Hom
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.