Glenn James Perrin
- Based in
- San Lorenzo
- On San Francisco permits
- Oct 2009 to Apr 2016
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2016 | Completed final sign-off Nov 2019 | 420 14th St | installation of one new dwelling unit per ordinance no 30-15, unit to be on ground floor, inside existing building envelope, refer to soft story pa #201505206775.Details
installation of one new dwelling unit per ordinance no 30-15, unit to be on ground floor, inside existing building envelope, refer to soft story pa #201505206775. | $70,000 |
| May 20, 2015 | Completed final sign-off Aug 2018 | 420 14th St | soft storey retrofit program mandatory seismic strengthening per ord. 66-13Details
soft storey retrofit program mandatory seismic strengthening per ord. 66-13 | $90,000 |
| Mar 7, 2014 | Completed final sign-off Jun 2014 | 20 Santa Clara Av | replace in kind in fire damage garage ceiling insulation drywall, 3 doors, 1 garage door, paint, 1 window not visible from street fixed prime and repaint basement level (5/8" type - x drywall)Details
replace in kind in fire damage garage ceiling insulation drywall, 3 doors, 1 garage door, paint, 1 window not visible from street fixed prime and repaint basement level (5/8" type - x drywall) | $40,000 |
| Nov 14, 2013 | Completed final sign-off Jun 2014 | 2930 Jackson St | updating toilet and lavatory and shower enclosure - new sheetrock, tile and paint; no structura workDetails
updating toilet and lavatory and shower enclosure - new sheetrock, tile and paint; no structura work | $7,500 |
| Jul 19, 2013 | Completed final sign-off Nov 2013 | 1370 Florida St | renovate kitchen & pantry, replace 2 windows, not visable from streetDetails
renovate kitchen & pantry, replace 2 windows, not visable from street | $42,000 |
| Jun 7, 2012 | Completed final sign-off Oct 2012 | 50 Alma St | relocate 2nd floor bathroom, add closet space, divide large (e) bedroom into 2 bedrooms. add egregss windows in 2nd floor bedroom. enclose porch to create bedroom #3.Details
relocate 2nd floor bathroom, add closet space, divide large (e) bedroom into 2 bedrooms. add egregss windows in 2nd floor bedroom. enclose porch to create bedroom #3. | $70,000 |
| Feb 17, 2011 | Completed final sign-off Aug 2011 | 420 14th St | tear out & rebuild in kind, top front bay window & surrounding structure due to dryrotDetails
tear out & rebuild in kind, top front bay window & surrounding structure due to dryrot | $15,000 |
| Nov 24, 2009 | Completed final sign-off Jun 2010 | 44 25th Av | 2nd floor area around 4 windows, dry rot repairs in kind. 3rd floor area around balcony deck, dry rot repairs in kind. approx 140 sq ft total areaDetails
2nd floor area around 4 windows, dry rot repairs in kind. 3rd floor area around balcony deck, dry rot repairs in kind. approx 140 sq ft total area | $4,000 |
| Oct 9, 2009 | Completed final sign-off Jun 2010 | 44 25th Av | 2nd floor rear bedroom, 8 windows in kind, 3rd fl rear sunroom, 4 windows, 3 french doorsDetails
2nd floor rear bedroom, 8 windows in kind, 3rd fl rear sunroom, 4 windows, 3 french doors | $30,000 |