Proline Construction
- Based in
- Redwood City
- On San Francisco permits
- Mar 2026 to Sep 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 2512 Broadway | revision to existing permit#202603067073, change skylight from walkable skylight to standard skylight, (n) deck to replace existing.Details
revision to existing permit#202603067073, change skylight from walkable skylight to standard skylight, (n) deck to replace existing. | |
| Mar 6, 2026 | In progress issued Jun 2026 | 2512 Broadway | the project is an infill addition of a new powder room and bar at level 2, w/ a new walkable skylight roof. the infill will be in between two (e) walls that extend one story above the roof of the infill. no structural upgrades or seismic retrofit will be required.Details
the project is an infill addition of a new powder room and bar at level 2, w/ a new walkable skylight roof. the infill will be in between two (e) walls that extend one story above the roof of the infill. no structural upgrades or seismic retrofit will be required. | $31,821 |