Block 2171, lot 013
2151 46th Ave
- City’s use
- Single Family Residential
- Built
- 1940
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,100 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 12, 2026 | Completed final sign-off Aug 2026 | 2151 46th Av | Yiu Cheong Construction Co Inc | rear addition and interior rmeodel: 1/f remodel (e) bedroom, family room, and bathroom. 2/f: remodel (e) bedroom add a bathroom.Details
rear addition and interior rmeodel: 1/f remodel (e) bedroom, family room, and bathroom. 2/f: remodel (e) bedroom add a bathroom. | $230,000 |
| Jun 11, 2025 | Completed final sign-off Jul 2025 | 2151 46th Av | Voong's Roofing Company | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Jul 3, 2023 | Completed final sign-off Jul 2023 | 2151 46th Av | Yiu Cheong Construction Co Inc | build a garbage shed 5'x 3' and planter 13'x3' in the front landscape area by using brick. no additional work.Details
build a garbage shed 5'x 3' and planter 13'x3' in the front landscape area by using brick. no additional work. | $5,000 |
| Feb 13, 2018 | Completed final sign-off Jun 2026 | 2151 46th Av | removal of load bearing wall between kitchen and living room and kitchen remodel. new island and replace counter and cabinets.Details
removal of load bearing wall between kitchen and living room and kitchen remodel. new island and replace counter and cabinets. | $40,000 | |
| Mar 2, 2011 | Completed final sign-off May 2011 | 2151 46th Av | Tian Dao Construction Company Inc | (2) rear window replacement outer siding replacement (not visible from street). windows replace in kind. u-factor =0.40. kitchen remodel, 1-1/2 bathroom remodel. painting in and out. no structural work in kitchen and bathroom on 2nd floor. no new lighting.Details
(2) rear window replacement outer siding replacement (not visible from street). windows replace in kind. u-factor =0.40. kitchen remodel, 1-1/2 bathroom remodel. painting in and out. no structural work in kitchen and bathroom on 2nd floor. no new lighting. | $7,000 |
| Nov 21, 2007 | Completed final sign-off Dec 2007 | 2151 46th Av | revision to approval appl. 200707207373 delete existing toilet room at ground floor.Details
revision to approval appl. 200707207373 delete existing toilet room at ground floor. | ||
| Oct 16, 2007 | Completed final sign-off Dec 2007 | 2151 46th Av | revision to 200707207373. change (e) bedroom to storage room at ground floor. no insulation installed per plan.Details
revision to 200707207373. change (e) bedroom to storage room at ground floor. no insulation installed per plan. | ||
| Jul 20, 2007 | Completed final sign-off Dec 2007 | 2151 46th Av | comply to nov # 200799038. remove rear addition per plan. legalize (e) bed rm, bath rm, and hall at ground floor per plan. 1/2 bath on g/f.Details
comply to nov # 200799038. remove rear addition per plan. legalize (e) bed rm, bath rm, and hall at ground floor per plan. 1/2 bath on g/f. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Yiu Cheong Construction Co Inc (2), Tian Dao Construction Company Inc, Voong's Roofing Company
- Architects
- Jason Chan
- Engineers
- Michael Chan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.