Dj New Century Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Aug 2025 to Oct 2026
- Last 24 months
- 7 permits filed
7 permits since 2000: 1 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 4
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2026 | In progress issued Oct 2026 | 1710 45th Av | kitchen and bathroom remodel in kind. remove (e) bathtub and replace with shower pan in same footprint.Details
kitchen and bathroom remodel in kind. remove (e) bathtub and replace with shower pan in same footprint. | $10,000 |
| Jun 30, 2026 | In progress issued Oct 2026 | 779 24th Av | remodel: unit 781 - 1/f infill under sunroom, new media room, bedroom, bathroom, laundry, wetbar.Details
remodel: unit 781 - 1/f infill under sunroom, new media room, bedroom, bathroom, laundry, wetbar. | $125,000 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 832 Stockton St | remove (e) non-electric, plastic sign and replace with (n) plastic sign, existing metal frame to remain.Details
remove (e) non-electric, plastic sign and replace with (n) plastic sign, existing metal frame to remain. | $1,000 |
| Oct 22, 2025 | Completed final sign-off Jan 2026 | 764 15th Av | 3rd floor: remove the front old 4 windows and then install 4 new vinyl windows, same size, same opening, same location, street facingDetails
3rd floor: remove the front old 4 windows and then install 4 new vinyl windows, same size, same opening, same location, street facing | $1,000 |
| Sep 26, 2025 | In progress issued Sep 2025 | 24 Rausch St | bathroom remodel like for like. remove existing bath tub in restroom install new tub. toilet, tile, vanity, replace new outlet.Details
bathroom remodel like for like. remove existing bath tub in restroom install new tub. toilet, tile, vanity, replace new outlet. | $6,500 |
| Sep 25, 2025 | In progress issued Feb 2026 | 75 Regent St | to comply with nov 201862501 excavate 12" at e) 1st/f to create 8' ceiling height to all habitiable areas. recongifure & legalize 2 bedrooms, family rm, bath, laundry area, new sink, new door at front of building.Details
to comply with nov 201862501 excavate 12" at e) 1st/f to create 8' ceiling height to all habitiable areas. recongifure & legalize 2 bedrooms, family rm, bath, laundry area, new sink, new door at front of building. | $70,000 |
| Aug 5, 2025 | In progress issued Dec 2025 | 350 06th Av | interior remodel: 1st fl-remodel (e) bedrooms, bathroom, add a wetbar for unit #1. 2nd fl unit #1- remodel bathrooms, bedrooms, relocate kitchen. 3rd fl unit #2- remodel bathrooms, bedrooms & relocate kitchen.Details
interior remodel: 1st fl-remodel (e) bedrooms, bathroom, add a wetbar for unit #1. 2nd fl unit #1- remodel bathrooms, bedrooms, relocate kitchen. 3rd fl unit #2- remodel bathrooms, bedrooms & relocate kitchen. | $200,000 |