Micheal Chan
- Listed as
- architect, designer, engineer
- Firm
- Michael Chan Engineering
- Based in
- San Francisco
- On San Francisco permits
- Mar 2015 to Sep 2026
63 permits since 2000 (engineer on 60 permits, architect on 2 permits, designer on 1 permit): 41 completed, 8 in progress, 8 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1370 20th Av | 1.) add a spiral stair to connect 1st floor and 2nd floor living space. 2.) convert (e) laundry/ storage room to a media room with a (n) wet bar.Details
1.) add a spiral stair to connect 1st floor and 2nd floor living space. 2.) convert (e) laundry/ storage room to a media room with a (n) wet bar. | $30,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 233 30th St | Mireles Construction Inc | replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line.Details
replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line. | $10,000 |
| Aug 23, 2026 | In progress filed Aug 2026, not yet issued | 83 Lisbon St | front building. to comply with n.o.v. #202289263. in 1st floor of unit# 1 (front building) add a new adu per state program.Details
front building. to comply with n.o.v. #202289263. in 1st floor of unit# 1 (front building) add a new adu per state program. | $125,000 | |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 718 37th Av | interior remodel: 1st floor: remodel (e) bedrooms, family room, and bathroom, add a powder room, replace (e) garage door with (n) garage door. 2nd floor: remodel (e) bathroom, kitchen, living and dining room, add a full bathroom, replace living room window. subject to ab112Details
interior remodel: 1st floor: remodel (e) bedrooms, family room, and bathroom, add a powder room, replace (e) garage door with (n) garage door. 2nd floor: remodel (e) bathroom, kitchen, living and dining room, add a full bathroom, replace living room window. subject to ab112 | $250,000 | |
| May 22, 2026 | In progress issued Jun 2026 | 2015 22nd Av | K&H Construction Development Inc | demo (e) alum. skylights, roof infill and rated parapets, condition (e) light well area (+69 gsf (n)+4 skylights, (n) parlor room, lighting, finishes and electrical, kitchen and bathroom remodel (n) layuots, replace tanked wh with (n) tankless gas wh, replace (e)hvac with (n) furnace ahu,Details
demo (e) alum. skylights, roof infill and rated parapets, condition (e) light well area (+69 gsf (n)+4 skylights, (n) parlor room, lighting, finishes and electrical, kitchen and bathroom remodel (n) layuots, replace tanked wh with (n) tankless gas wh, replace (e)hvac with (n) furnace ahu, | $73,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 311 Corbett Av | Roly Construction | voluntary structural upgrade: provide new plywood sheathing on grid line -2 on ground fl. add two new steel columns on grid line -a on the ground fl.Details
voluntary structural upgrade: provide new plywood sheathing on grid line -2 on ground fl. add two new steel columns on grid line -a on the ground fl. | $10,000 |
| Jan 23, 2026 | In progress filed Jan 2026, not yet issued | 424 Wilde Av | legalize unauthorized dwelling unit at ground floor pursuant to building code section 106a.3.1.3 & planning code 207.3. in association with nov# 202532925. reconfigure (e) stair from primary unit to garage.Details
legalize unauthorized dwelling unit at ground floor pursuant to building code section 106a.3.1.3 & planning code 207.3. in association with nov# 202532925. reconfigure (e) stair from primary unit to garage. | $70,000 | |
| Jul 17, 2025 | Completed final sign-off Aug 2025 | 419 42nd Av | Hong Shink Construction | revision to pa# 2024-0822-9257: bathroom fixtures, change steps in rear yard area.Details
revision to pa# 2024-0822-9257: bathroom fixtures, change steps in rear yard area. | $5,000 |
| Apr 29, 2025 | Completed final sign-off Jan 2026 | 1679 38th Av | Cht Properties Development | replacement of rear deck and stair of single family dwelllingDetails
replacement of rear deck and stair of single family dwellling | $38,000 |
| Feb 12, 2025 | In progress issued May 2025 | 540 45th Av | Cht Properties Development | widen existing garage door of single family dwelling; replace (e) garage door w/8'-0" garage doorDetails
widen existing garage door of single family dwelling; replace (e) garage door w/8'-0" garage door | $16,000 |
| Feb 7, 2025 | Completed final sign-off Jun 2025 | 174 Ralston St | Abn Construction Inc | kitchen remodel - interior work only. new cabinets, new appliances, minor changes to kitchen layout. 2/fDetails
kitchen remodel - interior work only. new cabinets, new appliances, minor changes to kitchen layout. 2/f | $22,500 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 1727 40th Av | Wynn L Builders Inc. | rev to pa# 2024-0805-7959: remove (1) existing post in 1st fl.Details
rev to pa# 2024-0805-7959: remove (1) existing post in 1st fl. | $2,000 |
| May 31, 2024 | Completed final sign-off Apr 2025 | 314 Utah St | Huey Construction Inc | rev to pa# 2024-0403-9241; relocate bath room and wet barDetails
rev to pa# 2024-0403-9241; relocate bath room and wet bar | |
| Mar 28, 2024 | Completed final sign-off Feb 2025 | 115 Upland Dr | He & Kuang Inc | interior remodel. 1/f: remodel bathroom. add an office, a media room, a bathroom. 2/f: remodel (e) kitchen and bathroom. add a bathroom. replace (3) termite damage front windows in-kind.Details
interior remodel. 1/f: remodel bathroom. add an office, a media room, a bathroom. 2/f: remodel (e) kitchen and bathroom. add a bathroom. replace (3) termite damage front windows in-kind. | $180,000 |
| Nov 3, 2023 | Completed final sign-off Sep 2024 | 367 Prague St | Neng Construction, Inc. | rear deck addition of single family dwellingDetails
rear deck addition of single family dwelling | $12,000 |
| Apr 6, 2023 | Never finaled issued Apr 2023, no final | 3425 Quintara St | Prosper Construction Dev Inc. | interior remodel on 2nd fl to widen wall opening in living room, one non-bearing wallDetails
interior remodel on 2nd fl to widen wall opening in living room, one non-bearing wall | $8,000 |
| Mar 30, 2023 | Expired or cancelled expired Mar 2026 | 401 Anderson St | Prosper Construction Dev Inc. | structural revision to pa 2022-1103-5797 - install new concrete footing per change conditionDetails
structural revision to pa 2022-1103-5797 - install new concrete footing per change condition | $20,000 |
| Mar 20, 2023 | Completed final sign-off Jan 2024 | 722 Duncan St | Perez Construction Llc. | revision to bpa#202301099855 & 202303012829, remove interior post on 2/fDetails
revision to bpa#202301099855 & 202303012829, remove interior post on 2/f | $3,000 |
| Mar 1, 2023 | Completed final sign-off Jan 2024 | 722 Duncan St | Perez Construction Llc. | rev to pa# 2023-0109-9855: install (2) 5'0"x4'0" 60 min fire rated fixed windows on 2nd fl. at the east side of the building remodel (e) bathroom on 3rd fl.Details
rev to pa# 2023-0109-9855: install (2) 5'0"x4'0" 60 min fire rated fixed windows on 2nd fl. at the east side of the building remodel (e) bathroom on 3rd fl. | $20,000 |
| Feb 28, 2023 | Completed final sign-off Nov 2023 | 634 Edna St | Prosper Construction Dev Inc. | interior remodel on 1st flr, convert existing storage space to an exercise room with a bathroom.Details
interior remodel on 1st flr, convert existing storage space to an exercise room with a bathroom. | $60,000 |
| Feb 17, 2023 | Expired or cancelled withdrawn Oct 2024 | 3449 22nd St | Roly Construction | structural revision to pa# 201809109581. soft story retrofit. install two simpson strong -wall high-strength wood shearwalls.Details
structural revision to pa# 201809109581. soft story retrofit. install two simpson strong -wall high-strength wood shearwalls. | |
| Oct 31, 2022 | Completed final sign-off May 2023 | 1555 38th Av | Hong's Custom Builders Pc | convert (e) ground floor unconditioned foyer to conditioned space with a new exterior door; 2 new skylights and new rear yard facing french door is proposed within (e) sliding door openingDetails
convert (e) ground floor unconditioned foyer to conditioned space with a new exterior door; 2 new skylights and new rear yard facing french door is proposed within (e) sliding door opening | $30,000 |
| Oct 27, 2022 | Completed final sign-off Jun 2025 | 608 Taraval St | Global Standard Construction Inc | convert existing 2nd floor office space to day care space. convert storage space to daycare space with two toilets at 1/f.Details
convert existing 2nd floor office space to day care space. convert storage space to daycare space with two toilets at 1/f. | $100,000 |
| Aug 30, 2022 | Completed final sign-off Jul 2023 | 1539 43rd Av | Zhizhao Liu Construction Co | 1st fl interior remodel. add 2 bedrooms, 2 bathrooms, a family room, a wet bar.Details
1st fl interior remodel. add 2 bedrooms, 2 bathrooms, a family room, a wet bar. | $70,000 |
| Jun 24, 2022 | Completed final sign-off Jul 2023 | 1563 18th Av | Gf Golden Foundation Co. | interior remodel in 1st fl: add a study room, an office, a family room, 2 bathrooms, and a powder room.Details
interior remodel in 1st fl: add a study room, an office, a family room, 2 bathrooms, and a powder room. | $70,000 |
| Jun 9, 2022 | Completed final sign-off Dec 2023 | 651 Panorama Dr | Rodscape | divide the garage to create additional living area (n) bathroom and (n) wet bar, add steps @ rear, add (9) windows, add sliding door @ rearDetails
divide the garage to create additional living area (n) bathroom and (n) wet bar, add steps @ rear, add (9) windows, add sliding door @ rear | $52,500 |
| May 25, 2022 | Never finaled issued May 2022, no final | 2034 29th Av | revision to pa 2021-0219-5047 concrete floor instead of pabers using existing drainage wooden stairs instead of concrete stairsDetails
revision to pa 2021-0219-5047 concrete floor instead of pabers using existing drainage wooden stairs instead of concrete stairs | ||
| Apr 26, 2022 | Completed final sign-off Aug 2023 | 48 Sanchez St | Dliu Construction | interior remodel. demo interior wall between rear entry & kitchen. replace kitchen finishes, fixtures & caseworks. modify interior wall between 2 baths. replace old wall with new. no change in building foot print. add recessed lighting.Details
interior remodel. demo interior wall between rear entry & kitchen. replace kitchen finishes, fixtures & caseworks. modify interior wall between 2 baths. replace old wall with new. no change in building foot print. add recessed lighting. | $60,000 |
| Apr 13, 2022 | Completed final sign-off Nov 2023 | 152 04th Av | revision to pa# 202109289335. 1st fl: reconfigure master bedroom & 2 baths layout. 2nd fl: add interior stairs access to backyard. 3rd fl: reconfigure 2 baths layout & interior stairs.Details
revision to pa# 202109289335. 1st fl: reconfigure master bedroom & 2 baths layout. 2nd fl: add interior stairs access to backyard. 3rd fl: reconfigure 2 baths layout & interior stairs. | ||
| Mar 9, 2022 | Never finaled issued Mar 2023, no final | 743 Carolina St | Sean Michael Mchugh Construction | revision to pa 202104269305: interior layout change; ground floor and basement popout in the rear yard, 2nd floor addition to the average depth of neighboring buildingDetails
revision to pa 202104269305: interior layout change; ground floor and basement popout in the rear yard, 2nd floor addition to the average depth of neighboring building | $70,000 |
| Feb 17, 2022 | Completed final sign-off Sep 2026 | 2014 45th Av | Victor Remodel & Construction | 2 story horizontal extension to the rear only. create habitable space. kitchen remodel at 2nd floor. adu under separate pa #202003126924.Details
2 story horizontal extension to the rear only. create habitable space. kitchen remodel at 2nd floor. adu under separate pa #202003126924. | $70,000 |
| Feb 7, 2022 | Completed final sign-off Jul 2023 | 1335 Bay St | R & D Construction Co Inc | erect new 2-story, type 5a, r-3 structure at rear for 1 adu per 162-16. (per ca gov code sec 65852.2. (no work to front r-2, 4 unit structure on lot)Details
erect new 2-story, type 5a, r-3 structure at rear for 1 adu per 162-16. (per ca gov code sec 65852.2. (no work to front r-2, 4 unit structure on lot) | $83,200 |
| Oct 21, 2021 | Completed final sign-off Mar 2022 | 3450 03rd St | Spotlight Construction Groups Inc | permit to clarify (e) conditions (sq footage and use of building) no work under this permit.Details
permit to clarify (e) conditions (sq footage and use of building) no work under this permit. | |
| Sep 17, 2021 | Never finaled issued Sep 2021, no final | 335 Casitas Av | Castle Construction | revision to pa# 202011199292. relocaate laundry at 1/f, relocate 1/2 bath from 1/f to 2/f, and relocate bath at 2/f. add guest bath at 1/f.Details
revision to pa# 202011199292. relocaate laundry at 1/f, relocate 1/2 bath from 1/f to 2/f, and relocate bath at 2/f. add guest bath at 1/f. | $1,000 |
| Aug 24, 2021 | Completed final sign-off Apr 2023 | 33 Walter U Lum Pl | C T W Mechanical | change of use & occupancy at basement lvl on walter u. lum place from m-retail to a-2 restaurant. including commercial kitchen, refrigeration units, seating area, storage, and accessibility upgrades. no changes to building facade or structural systems.Details
change of use & occupancy at basement lvl on walter u. lum place from m-retail to a-2 restaurant. including commercial kitchen, refrigeration units, seating area, storage, and accessibility upgrades. no changes to building facade or structural systems. | $400,000 |
| Aug 24, 2021 | Completed final sign-off Apr 2022 | 82 Lydia Av | C K Construction | partially convert existing garage space into habitable space. total conversion = 489 sf. including family room with wetbar, 1 bedroom, 1 den. no change to existing water heater or fau unit. no change to exterior or upper floor space.Details
partially convert existing garage space into habitable space. total conversion = 489 sf. including family room with wetbar, 1 bedroom, 1 den. no change to existing water heater or fau unit. no change to exterior or upper floor space. | $20,000 |
| Jun 4, 2021 | Completed final sign-off Apr 2024 | 774 45th Av | Bartkus Remodel, Adonis Building And Electrical | 1st fl: add a bathroom. 2nd fl: remodel (e) kitchen & bathroom, add a laundry room. 3rd fl: add a bathroom; replace (e) front windows in-kind.Details
1st fl: add a bathroom. 2nd fl: remodel (e) kitchen & bathroom, add a laundry room. 3rd fl: add a bathroom; replace (e) front windows in-kind. | $90,000 |
| Apr 26, 2021 | Never finaled issued Feb 2022, no final | 743 Carolina St | Sean Michael Mchugh Construction | interior remodel. convert part of ground floor into habitable space. add bedroom, family room & bathroom on ground floor. relocate staircase. relocate kitchen, bathroom & bedroom on 2nd floor.Details
interior remodel. convert part of ground floor into habitable space. add bedroom, family room & bathroom on ground floor. relocate staircase. relocate kitchen, bathroom & bedroom on 2nd floor. | $50,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2021 | 61 Elk St | R & D Construction Co Inc | remove (e) wall between kitchen and diniing roomDetails
remove (e) wall between kitchen and diniing room | $4,000 |
| Feb 17, 2021 | Completed final sign-off Aug 2021 | 1473 Church St | revision to pa# 202012019976 . structural revision. add new 4x12 headers per building inspector's request.Details
revision to pa# 202012019976 . structural revision. add new 4x12 headers per building inspector's request. | ||
| Feb 1, 2021 | Completed final sign-off Jan 2022 | 1239 Plymouth Av | Dbf Construction Co Inc | revision to no plan pa# 202006138703: interior remodel. 1st fl add 1 bedroom, 1 guest room, 1 family room, 1 full bath, 1 powder room. 2nd fl add 1 bathroom, convert (e) dining room to study room. relocate kitchen.Details
revision to no plan pa# 202006138703: interior remodel. 1st fl add 1 bedroom, 1 guest room, 1 family room, 1 full bath, 1 powder room. 2nd fl add 1 bathroom, convert (e) dining room to study room. relocate kitchen. | $100,000 |
| Feb 1, 2021 | Completed final sign-off Sep 2025 | 2742 Bush St | comply with planning enforcement case# 2018-009028cua. legalize unauthorized dwelling unit on 1st floor as an adu in the front building per government code #68652.2. verify (e) structure complies with lateral force oer 2019 sfebc 506.4.3 change of occupancy from r-3 to r-2. (n) heat pump in side yd.Details
comply with planning enforcement case# 2018-009028cua. legalize unauthorized dwelling unit on 1st floor as an adu in the front building per government code #68652.2. verify (e) structure complies with lateral force oer 2019 sfebc 506.4.3 change of occupancy from r-3 to r-2. (n) heat pump in side yd. | $35,000 | |
| Jan 26, 2021 | Never finaled issued Jul 2021, no final | 1730 26th Av | voluntary existing footing strengthening; voluntary add new plywood shear walls @ 1st floorDetails
voluntary existing footing strengthening; voluntary add new plywood shear walls @ 1st floor | $20,000 | |
| Jan 21, 2021 | Completed final sign-off Aug 2021 | 572 Liberty St | Woodteck Construction, Llc | rear deck replacement in kind for single family dwelling.Details
rear deck replacement in kind for single family dwelling. | $8,000 |
| Dec 17, 2020 | Completed final sign-off Nov 2021 | 1271 43rd Av | Deluxe Custom Construction | interior remodel: in 2nd fl, remodel (e) kitchen & bathroom. add a full bathroom.Details
interior remodel: in 2nd fl, remodel (e) kitchen & bathroom. add a full bathroom. | $55,000 |
| Nov 19, 2020 | Never finaled issued Jun 2021, no final | 335 Casitas Av | Castle Construction | in 1st/fl: relocate family room, add a guest bedroom, a study room, and a powder room, remodel (e) bathroom. in 2nd/fl: add a bathroom, remodel (e) bathroom.Details
in 1st/fl: relocate family room, add a guest bedroom, a study room, and a powder room, remodel (e) bathroom. in 2nd/fl: add a bathroom, remodel (e) bathroom. | $60,000 |
| Nov 19, 2020 | Completed final sign-off Dec 2021 | 374 Mangels Av | Lcy Contruciton Inc | single family dwelling renovation - add family room, bedroom, bathroom & entry foyer (596 sf) on 1st fl. relocate (e) kitchen & bedroom and remodel (e) bathroom on 2nd fl. add 2'x2' skylight. total habitable space under 500 sqft.Details
single family dwelling renovation - add family room, bedroom, bathroom & entry foyer (596 sf) on 1st fl. relocate (e) kitchen & bedroom and remodel (e) bathroom on 2nd fl. add 2'x2' skylight. total habitable space under 500 sqft. | $100,000 |
| Nov 3, 2020 | Expired or cancelled withdrawn Nov 2021 | 3450 03rd St | Spotlight Construction Groups Inc | revision to pa# 201912068965. structural revisions. to infill the existing opening in the 3rd floor.Details
revision to pa# 201912068965. structural revisions. to infill the existing opening in the 3rd floor. | $50,000 |
| Mar 12, 2020 | Completed final sign-off Sep 2026 | 2016 45th Av | Victor Remodel & Construction | to comply w/ nov #2020019902. legalize adu at 1st fl per state adu gov code section 6585202. horizontal extension under pa# 202202178169Details
to comply w/ nov #2020019902. legalize adu at 1st fl per state adu gov code section 6585202. horizontal extension under pa# 202202178169 | $5,000 |
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 566 29th Av | First Restaurant Builders | revision to pa #201308235160 & 201805108750. move wall between garage & lower unit. retain (e) bay window on front facade. adjust interior layout of lower unit.Details
revision to pa #201308235160 & 201805108750. move wall between garage & lower unit. retain (e) bay window on front facade. adjust interior layout of lower unit. | |
| Sep 16, 2019 | Completed final sign-off Sep 2020 | 2239 42nd Av | Foundation Soil Stabilization | provide soil permeation grouting for existing single family dwelling.Details
provide soil permeation grouting for existing single family dwelling. | $18,000 |
| Jul 10, 2019 | Completed final sign-off May 2020 | 2239 42nd Av | Best & Builidng Construction Inc | renovation of (e) sfd. remodel (e) kitchen & bathroom and add master bathroom on 2/f. remove load-bearing wall & replace sheetrock on 2/f. add 3 skylights, add 1-hr fire rated parapet on the south side. repair stucco and stud at facade.Details
renovation of (e) sfd. remodel (e) kitchen & bathroom and add master bathroom on 2/f. remove load-bearing wall & replace sheetrock on 2/f. add 3 skylights, add 1-hr fire rated parapet on the south side. repair stucco and stud at facade. | $80,000 |
| Apr 29, 2019 | Completed final sign-off Oct 2019 | 500 Hyde St | J T & M Hardwood Flooring Construcing | apt 601: non structural inter remodel: relocate (e) kitchen, remodel (e) bathrm, new bedroom, emergency escape and rescue windows not req'd for unit sixth floor above grade per cbc 1030.1Details
apt 601: non structural inter remodel: relocate (e) kitchen, remodel (e) bathrm, new bedroom, emergency escape and rescue windows not req'd for unit sixth floor above grade per cbc 1030.1 | $40,000 |
| Feb 7, 2019 | Completed final sign-off May 2019 | 770 California St | J T & M Hardwood Flooring Construcing | non-structural interior remodel apt 306. relocate (e) kitchen, remodel (e) bathroom. provide new bedroom.Details
non-structural interior remodel apt 306. relocate (e) kitchen, remodel (e) bathroom. provide new bedroom. | $30,000 |
| Feb 7, 2019 | Expired or cancelled revoked May 2019 | 173 Gambier St | Jmc General Construction | 1st fl - relocate(e)stair, add 3 bedrm, 2 full bath, relocate laundry, strengthening(e)rear foundation. replace water damaged lower roof; remove brick chimney; 2nd fl -relocate (e) kitchen to rear; remove(e)rear bedrm; install new interior stair.remodel kitchen/bathrm.roof deck under separate permitDetails
1st fl - relocate(e)stair, add 3 bedrm, 2 full bath, relocate laundry, strengthening(e)rear foundation. replace water damaged lower roof; remove brick chimney; 2nd fl -relocate (e) kitchen to rear; remove(e)rear bedrm; install new interior stair.remodel kitchen/bathrm.roof deck under separate permit | $175,000 |
| May 16, 2017 | Expired or cancelled withdrawn Feb 2018 | 1345 Taylor St | revision to approved pa 201609076934 provide bew footins at grid line aDetails
revision to approved pa 201609076934 provide bew footins at grid line a | $5,000 | |
| Sep 27, 2016 | Completed final sign-off May 2017 | 112 Virginia Av | R & D Construction Co Inc | voluntary work - foundation strengthening & structural strengthening at 1st floor.Details
voluntary work - foundation strengthening & structural strengthening at 1st floor. | $30,000 |
| Sep 9, 2016 | Expired or cancelled withdrawn Jan 2017 | 887 45th Av | kitchen remodel of lower unit of existing duplex. install beam for removal of interior wall. add laundry closet at (e) bathroomDetails
kitchen remodel of lower unit of existing duplex. install beam for removal of interior wall. add laundry closet at (e) bathroom | $35,000 | |
| Oct 21, 2015 | Completed final sign-off Oct 2016 | 305 Nevada St | Allied Teamwork Construction Co | 1st fl: remove 2 extg bedroom at rear. legalize 2 bedroom , 1 and 1/2 bath rm, game rm. upgrade elect/plmg. relocate interior stair. add nw steps up to street level. nw laundryroom, replace old window, strengthening extg foundation. 2nd fl: remodel extg kitchen, relocate exgt bathroom.Details
1st fl: remove 2 extg bedroom at rear. legalize 2 bedroom , 1 and 1/2 bath rm, game rm. upgrade elect/plmg. relocate interior stair. add nw steps up to street level. nw laundryroom, replace old window, strengthening extg foundation. 2nd fl: remodel extg kitchen, relocate exgt bathroom. | $150,000 |
| Oct 20, 2015 | Completed final sign-off Jun 2016 | 79 Arbor St | R & D Construction Co Inc | 1st flr: (n)2 bedrm, full bath, (n) interior stair up to 2nd fl, remove rear stair, (n) rear deck; 2nd floor (n) master bedrooms, 1 full bath,(n) laundry rooms, (n) windows; 3rd floor - remodel (e) kitchen, relocate and remodel (e) bathroom, change bedroom to dining room, replace 4 windows with newDetails
1st flr: (n)2 bedrm, full bath, (n) interior stair up to 2nd fl, remove rear stair, (n) rear deck; 2nd floor (n) master bedrooms, 1 full bath,(n) laundry rooms, (n) windows; 3rd floor - remodel (e) kitchen, relocate and remodel (e) bathroom, change bedroom to dining room, replace 4 windows with new | $150,000 |
| Aug 25, 2015 | Completed final sign-off Dec 2015 | 770 California St | M H M Construction | interior remodel 108: relocate kitchen, remodel existing bath. provide new denDetails
interior remodel 108: relocate kitchen, remodel existing bath. provide new den | $25,000 |
| May 15, 2015 | Completed final sign-off Jul 2015 | 1106 Bush St | M H M Construction | unit # 704: interior remodel non-structural alteration. relocate extg kitchen. remodel extg bathroom. provide 2 new bedrooms. no egress windows req'd 7th floor above.Details
unit # 704: interior remodel non-structural alteration. relocate extg kitchen. remodel extg bathroom. provide 2 new bedrooms. no egress windows req'd 7th floor above. | $35,000 |
| Mar 3, 2015 | Completed final sign-off Jun 2015 | 3750 Geary Bl | Simply Building Inc | barrier removal, vacant restaurant. replace (e) restroom fixtures, restrom door and door hardware.Details
barrier removal, vacant restaurant. replace (e) restroom fixtures, restrom door and door hardware. | $5,000 |