Hong's Custom Builders Pc
- Based in
- Daly City
- On San Francisco permits
- Mar 2012 to Apr 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 21 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2024 | Completed final sign-off Jul 2024 | 2155 Hayes St | remodel (2) (e) bathrooms. remodel in kind.Details
remodel (2) (e) bathrooms. remodel in kind. | $15,000 |
| Mar 19, 2024 | Completed final sign-off Feb 2025 | 1720 Polk St | revision to pa# 202311160921. new scope includes demolition of non-structural partition.Details
revision to pa# 202311160921. new scope includes demolition of non-structural partition. | |
| Nov 16, 2023 | Completed final sign-off Feb 2025 | 1720 Polk St | interior renovation of an (e) donut and pastry shop into a new donut and pastry shop in addition to new cooking equipment. project includes interior improvements including finishes, equipment and exterior details. project includes necessary documentation for accessibility.Details
interior renovation of an (e) donut and pastry shop into a new donut and pastry shop in addition to new cooking equipment. project includes interior improvements including finishes, equipment and exterior details. project includes necessary documentation for accessibility. | $100,000 |
| Oct 31, 2022 | Completed final sign-off May 2023 | 1555 38th Av | convert (e) ground floor unconditioned foyer to conditioned space with a new exterior door; 2 new skylights and new rear yard facing french door is proposed within (e) sliding door openingDetails
convert (e) ground floor unconditioned foyer to conditioned space with a new exterior door; 2 new skylights and new rear yard facing french door is proposed within (e) sliding door opening | $30,000 |
| Jan 19, 2022 | Completed final sign-off Nov 2022 | 350 Judah St | g/f: commericial tenant improvement - interior renovation from (e) bakery to (n) restaurant.Details
g/f: commericial tenant improvement - interior renovation from (e) bakery to (n) restaurant. | $100,000 |
| Apr 23, 2021 | Completed final sign-off Apr 2022 | 25 Chaves Av | kitchen remodel, new exterior deck within the rear yard setback.Details
kitchen remodel, new exterior deck within the rear yard setback. | $100,000 |
| Oct 2, 2020 | Completed final sign-off Oct 2020 | 266 Bright St | rev to 201910245523: (n) concrete slab at rear rear per plan. no interior work to be doneunder this permit. refer to approved permit pa201910245523.Details
rev to 201910245523: (n) concrete slab at rear rear per plan. no interior work to be doneunder this permit. refer to approved permit pa201910245523. | |
| Oct 24, 2019 | Completed final sign-off Oct 2020 | 266 Bright St | 1/f: add one media room, 1 bathroom & 1 storage room. add new woode deck at rear on 2/f. all per plans.Details
1/f: add one media room, 1 bathroom & 1 storage room. add new woode deck at rear on 2/f. all per plans. | $35,000 |
| Feb 11, 2019 | Completed final sign-off Apr 2019 | 377 Dellbrook Av | remodel 2 (ex) bathrooms w/ new in-wall toilet system & 1 kitchen. bathrooms & kitchen layout to remain w/ new range location & opening to dining room to be widened w/ bar top.Details
remodel 2 (ex) bathrooms w/ new in-wall toilet system & 1 kitchen. bathrooms & kitchen layout to remain w/ new range location & opening to dining room to be widened w/ bar top. | $40,000 |
| Jan 17, 2019 | Completed final sign-off Mar 2019 | 740 Great Hy | remove existing cabinets, countertop and fixtures in kitchen.Details
remove existing cabinets, countertop and fixtures in kitchen. | $7,000 |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 1312 Anza St | revision to app#201801128596. revise stair configuration between 1st and 2nd floors only.Details
revision to app#201801128596. revise stair configuration between 1st and 2nd floors only. | |
| Jan 26, 2018 | Completed final sign-off Nov 2018 | 1312 Anza St | 1st flr rear addition. create (n) bdrm space. create (n) deck above bdrm space with open railings. (n) sliding doors off of deck at rear of 2nd flr. (n) egress door @ front of public way.Details
1st flr rear addition. create (n) bdrm space. create (n) deck above bdrm space with open railings. (n) sliding doors off of deck at rear of 2nd flr. (n) egress door @ front of public way. | $60,000 |
| Jan 12, 2018 | Completed final sign-off Nov 2018 | 1312 Anza St | 1st flr: remove built in nw stair connection to level above. 2nd flr nw stair connection to leve below, remodel kitchen and powder rm, nw gas fire place, replace railing to 3rd fl. 3rd flr recofigure mas bth & closet. remodel guest bth. nw hydronic heating nw fl.Details
1st flr: remove built in nw stair connection to level above. 2nd flr nw stair connection to leve below, remodel kitchen and powder rm, nw gas fire place, replace railing to 3rd fl. 3rd flr recofigure mas bth & closet. remodel guest bth. nw hydronic heating nw fl. | $70,000 |
| Dec 29, 2014 | Completed final sign-off Apr 2015 | 456 Magellan Av | demolition of existing bathroom, installation of new bathroom, shower pan; installation of new tiles; installation of new bathroom fixtures. no structural work doneDetails
demolition of existing bathroom, installation of new bathroom, shower pan; installation of new tiles; installation of new bathroom fixtures. no structural work done | $10,000 |
| Dec 29, 2014 | Completed final sign-off Jun 2015 | 224 Teresita Bl | demolition of existing cabinets, countertops and back splash tiles; instalation of new cabinets. installation of new countertops. installation of new applliances. no structural work to be doneDetails
demolition of existing cabinets, countertops and back splash tiles; instalation of new cabinets. installation of new countertops. installation of new applliances. no structural work to be done | $12,000 |
| Feb 24, 2014 | Completed final sign-off Feb 2014 | 144 Alhambra St | replace 2 windows with fiberglass wood clad windows.Details
replace 2 windows with fiberglass wood clad windows. | $1,800 |
| Sep 23, 2013 | Completed final sign-off Nov 2013 | 630 Ortega St | demo existing stucco at front face of house. re-stucco front face of house. replace 3 windows at front of house. u factor not > .4Details
demo existing stucco at front face of house. re-stucco front face of house. replace 3 windows at front of house. u factor not > .4 | $13,000 |
| Sep 23, 2013 | Completed final sign-off Oct 2013 | 2454 Chestnut St | replace two windows on second floor at front of building; u factor not >.4Details
replace two windows on second floor at front of building; u factor not >.4 | $3,000 |
| Jun 24, 2013 | Completed final sign-off Jun 2013 | 58 Country Club Dr | demo existing cabinets and counters, install new cabinets and counters. new floor tiles in kitchen. comply with complaint 201309131Details
demo existing cabinets and counters, install new cabinets and counters. new floor tiles in kitchen. comply with complaint 201309131 | $13,000 |
| Mar 5, 2013 | Completed final sign-off May 2013 | 4007 24th St | remodeling extg restaurant change extg cooking equipment dinning room seatings. lightings, provided accessible entrance and restroom.Details
remodeling extg restaurant change extg cooking equipment dinning room seatings. lightings, provided accessible entrance and restroom. | $28,000 |
| Feb 8, 2013 | Never finaled issued Feb 2013, no final | 111 Chestnut St | remodel kitchen and 2 bathrooms, installation of tiles @ entire unit, replace in kindDetails
remodel kitchen and 2 bathrooms, installation of tiles @ entire unit, replace in kind | $27,000 |
| Dec 28, 2012 | Expired or cancelled expired Dec 2014 | 2274 Lombard St | barrier removal work only. change (e) restroom to accessible restroom.Details
barrier removal work only. change (e) restroom to accessible restroom. | $10,000 |
| Mar 19, 2012 | Completed final sign-off Jun 2012 | 2150 Chestnut St | revision: fireplace remodel at waiting area.Details
revision: fireplace remodel at waiting area. | $5,000 |
| Mar 13, 2012 | Never finaled issued Mar 2012, no final | 2150 Chestnut St | remodel interior floor and walls at dining area for new restaurant tenant. construct built in furniture per plan. improve (e) restrooms.Details
remodel interior floor and walls at dining area for new restaurant tenant. construct built in furniture per plan. improve (e) restrooms. | $75,000 |