Back to bathroom remodel contractors
Hong's Custom Builders Pc
- Based in
- Daly City
- On San Francisco permits
- Mar 2012 to Apr 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 21 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2024 | Completed final sign-off Jul 2024 | 2155 Hayes St | remodel (2) (e) bathrooms. remodel in kind.Details
remodel (2) (e) bathrooms. remodel in kind. | $15,000 |
| Oct 24, 2019 | Completed final sign-off Oct 2020 | 266 Bright St | 1/f: add one media room, 1 bathroom & 1 storage room. add new woode deck at rear on 2/f. all per plans.Details
1/f: add one media room, 1 bathroom & 1 storage room. add new woode deck at rear on 2/f. all per plans. | $35,000 |
| Feb 11, 2019 | Completed final sign-off Apr 2019 | 377 Dellbrook Av | remodel 2 (ex) bathrooms w/ new in-wall toilet system & 1 kitchen. bathrooms & kitchen layout to remain w/ new range location & opening to dining room to be widened w/ bar top.Details
remodel 2 (ex) bathrooms w/ new in-wall toilet system & 1 kitchen. bathrooms & kitchen layout to remain w/ new range location & opening to dining room to be widened w/ bar top. | $40,000 |
| Dec 29, 2014 | Completed final sign-off Apr 2015 | 456 Magellan Av | demolition of existing bathroom, installation of new bathroom, shower pan; installation of new tiles; installation of new bathroom fixtures. no structural work doneDetails
demolition of existing bathroom, installation of new bathroom, shower pan; installation of new tiles; installation of new bathroom fixtures. no structural work done | $10,000 |
| Feb 8, 2013 | Never finaled issued Feb 2013, no final | 111 Chestnut St | remodel kitchen and 2 bathrooms, installation of tiles @ entire unit, replace in kindDetails
remodel kitchen and 2 bathrooms, installation of tiles @ entire unit, replace in kind | $27,000 |