Hong's Custom Builders Pc
- Based in
- Daly City
- On San Francisco permits
- Mar 2012 to Apr 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 21 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 8 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 1312 Anza St | revision to app#201801128596. revise stair configuration between 1st and 2nd floors only.Details
revision to app#201801128596. revise stair configuration between 1st and 2nd floors only. | |
| Jan 12, 2018 | Completed final sign-off Nov 2018 | 1312 Anza St | 1st flr: remove built in nw stair connection to level above. 2nd flr nw stair connection to leve below, remodel kitchen and powder rm, nw gas fire place, replace railing to 3rd fl. 3rd flr recofigure mas bth & closet. remodel guest bth. nw hydronic heating nw fl.Details
1st flr: remove built in nw stair connection to level above. 2nd flr nw stair connection to leve below, remodel kitchen and powder rm, nw gas fire place, replace railing to 3rd fl. 3rd flr recofigure mas bth & closet. remodel guest bth. nw hydronic heating nw fl. | $70,000 |