Back to kitchen remodel contractors
Hong's Custom Builders Pc
- Based in
- Daly City
- On San Francisco permits
- Mar 2012 to Apr 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 21 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2021 | Completed final sign-off Apr 2022 | 25 Chaves Av | kitchen remodel, new exterior deck within the rear yard setback.Details
kitchen remodel, new exterior deck within the rear yard setback. | $100,000 |
| Feb 11, 2019 | Completed final sign-off Apr 2019 | 377 Dellbrook Av | remodel 2 (ex) bathrooms w/ new in-wall toilet system & 1 kitchen. bathrooms & kitchen layout to remain w/ new range location & opening to dining room to be widened w/ bar top.Details
remodel 2 (ex) bathrooms w/ new in-wall toilet system & 1 kitchen. bathrooms & kitchen layout to remain w/ new range location & opening to dining room to be widened w/ bar top. | $40,000 |
| Jan 17, 2019 | Completed final sign-off Mar 2019 | 740 Great Hy | remove existing cabinets, countertop and fixtures in kitchen.Details
remove existing cabinets, countertop and fixtures in kitchen. | $7,000 |
| Jan 12, 2018 | Completed final sign-off Nov 2018 | 1312 Anza St | 1st flr: remove built in nw stair connection to level above. 2nd flr nw stair connection to leve below, remodel kitchen and powder rm, nw gas fire place, replace railing to 3rd fl. 3rd flr recofigure mas bth & closet. remodel guest bth. nw hydronic heating nw fl.Details
1st flr: remove built in nw stair connection to level above. 2nd flr nw stair connection to leve below, remodel kitchen and powder rm, nw gas fire place, replace railing to 3rd fl. 3rd flr recofigure mas bth & closet. remodel guest bth. nw hydronic heating nw fl. | $70,000 |
| Jun 24, 2013 | Completed final sign-off Jun 2013 | 58 Country Club Dr | demo existing cabinets and counters, install new cabinets and counters. new floor tiles in kitchen. comply with complaint 201309131Details
demo existing cabinets and counters, install new cabinets and counters. new floor tiles in kitchen. comply with complaint 201309131 | $13,000 |
| Feb 8, 2013 | Never finaled issued Feb 2013, no final | 111 Chestnut St | remodel kitchen and 2 bathrooms, installation of tiles @ entire unit, replace in kindDetails
remodel kitchen and 2 bathrooms, installation of tiles @ entire unit, replace in kind | $27,000 |