Nina Nazarov
- License
- 53125
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- On San Francisco permits
- Nov 2024 to Sep 2025
2 permits since 2000 (architect on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Neu Haus (2)
- Engineers
- Victor Ramos (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2025 | In progress issued Oct 2025 | 593 Waller St | Neu Haus | revision to 202409170930. change in elevator shaft design. unit 591 - remodel 2 bathroom in kind at 3rd fl, add sauna to 4th fl saunaDetails
revision to 202409170930. change in elevator shaft design. unit 591 - remodel 2 bathroom in kind at 3rd fl, add sauna to 4th fl sauna | $20,000 |
| Nov 27, 2024 | In progress issued Sep 2025 | 591 Waller St | Neu Haus | addition of a residential elevator on the rear midblock-facing exterior corner of the building. new stair layout, and kichen remodel with new walk-in pantry space. new non-occupiable flat roof over elevator addtion.Details
addition of a residential elevator on the rear midblock-facing exterior corner of the building. new stair layout, and kichen remodel with new walk-in pantry space. new non-occupiable flat roof over elevator addtion. | $200,000 |