Block 2773, lot 023
4250 23rd St
- City’s use
- Single Family Residential
- Built
- 1896
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,800 sq ft
- Lot
- 4,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 11, 2026 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | to obtain final inspection for work approved under pa 202502210850. all work is complete.Details
to obtain final inspection for work approved under pa 202502210850. all work is complete. | |
| Nov 14, 2025 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | to obtain final inspection for work approved under: 202407196880. all work is complete.Details
to obtain final inspection for work approved under: 202407196880. all work is complete. | |
| Mar 26, 2025 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | revision to pa# 202412056258 and 202502210850: replace (e) furnace and replace ducts at 1/f. new ducted heat pump at second and third floors. additional pad footings in crawl space.Details
revision to pa# 202412056258 and 202502210850: replace (e) furnace and replace ducts at 1/f. new ducted heat pump at second and third floors. additional pad footings in crawl space. | $15,000 |
| Feb 21, 2025 | Expired or cancelled expired Mar 2026 | 4250 23rd St | Perez Construction Llc. | revision to pa#202412056258. replace existing windows with new in-kind. remodel kitchen. new wall at stair. enlarge bedroom 5Details
revision to pa#202412056258. replace existing windows with new in-kind. remodel kitchen. new wall at stair. enlarge bedroom 5 | $30,000 |
| Dec 5, 2024 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | attic build out. new connecting stair to habitavke attic floor. new 8'x8' dormer. new skylights. two new windows, replace 3 (e) windows. remodel two bathroom laundry room and closets.Details
attic build out. new connecting stair to habitavke attic floor. new 8'x8' dormer. new skylights. two new windows, replace 3 (e) windows. remodel two bathroom laundry room and closets. | $100,000 |
| Nov 20, 2024 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | voluntary foundation strenthening consisting of the replacement of weathered unreinforced brick foundations with conventionally reinforced concrete spread footings along the perimeter of the house. this is a revision to pa#: 202407196880Details
voluntary foundation strenthening consisting of the replacement of weathered unreinforced brick foundations with conventionally reinforced concrete spread footings along the perimeter of the house. this is a revision to pa#: 202407196880 | $20,000 |
| Jul 19, 2024 | Expired or cancelled expired Mar 2026 | 4250 23rd St | Perez Construction Llc. | remove walls at living room to open the space. relocated the powder room. shift wall at bedroom 5 and remodel bathroom 4. new foundation at north wall. no change to elevations view from streetDetails
remove walls at living room to open the space. relocated the powder room. shift wall at bedroom 5 and remodel bathroom 4. new foundation at north wall. no change to elevations view from street | $50,000 |
| Jun 7, 2023 | Completed final sign-off May 2024 | 4250 23rd St | Valley View Roofing Llc | reroofingDetails
reroofing | $7,000 |
| Apr 10, 2018 | Never finaled issued Apr 2018, no final | 4250 23rd St | street spaceDetails
street space | ||
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 4250 23rd St | street spaceDetails
street space | ||
| Mar 6, 2012 | Completed final sign-off Apr 2012 | 4250 23rd St | Goffo Construction Inc | cosmetic kitchen remodel with new cabinets and counters in same layout. appliances all replaced in same locationDetails
cosmetic kitchen remodel with new cabinets and counters in same layout. appliances all replaced in same location | $16,000 |
| Dec 30, 2010 | Expired or cancelled withdrawn May 2012 | 4250 23rd St | addition of living space within (e) attic & replacement of (e) roof material.Details
addition of living space within (e) attic & replacement of (e) roof material. | $180,000 | |
| Mar 5, 2010 | Never finaled issued Mar 2010, no final | 4250 23rd St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Nov 16, 2009 | Never finaled issued Nov 2009, no final | 4250 23rd St | street spaceDetails
street space | ||
| Apr 6, 2007 | Completed final sign-off Nov 2007 | 4250 23rd St | Whipple Construction Inc | remodel 3 bathrooms, replace tile and and fixtures in same. no structural work. fluorescent lighting or controlled by motion sensor.Details
remodel 3 bathrooms, replace tile and and fixtures in same. no structural work. fluorescent lighting or controlled by motion sensor. | $80,000 |
| May 2, 2002 | Expired or cancelled cancelled Jun 2003 | 4250 23rd St | add interior stair;modify attic & upgrade structure for use as fam rm; add dormerDetails
add interior stair;modify attic & upgrade structure for use as fam rm; add dormer | $70,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Perez Construction Llc. (7), Goffo Construction Inc, Valley View Roofing Llc, Whipple Construction Inc
- Architects
- Gisela Schmoll (5), Sandra Vivanco
- Engineers
- Victor Ramos (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.