Audrey Bauer
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Studio Maven
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to Apr 2026
22 permits since 2000 (architect on 20 permits, authorized agent-others on 1 permit, engineer on 1 permit): 16 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2026 | Completed final sign-off Aug 2026 | 827 Scott St | North Bay Construction | remove (e) exterior door for (e) lower level storage space at rear facade and install (n) windoow winth the (e)opening. infill wall below to match (e) siding. (n) exterior inswing door within driveway along side facade. (n) closet within (e) lower storage space - no sqft change.Details
remove (e) exterior door for (e) lower level storage space at rear facade and install (n) windoow winth the (e)opening. infill wall below to match (e) siding. (n) exterior inswing door within driveway along side facade. (n) closet within (e) lower storage space - no sqft change. | $15,000 |
| Jan 27, 2026 | Expired or cancelled withdrawn Feb 2026 | 827 Scott St | kitchen and bathroom remodel in kind, no change to sq.ft. refinishing of (e) ground level storage area - new interior materials and new interior walls, new window within (e) opening of swing door, new in-swing door within draveway. no new sq.ft.Details
kitchen and bathroom remodel in kind, no change to sq.ft. refinishing of (e) ground level storage area - new interior materials and new interior walls, new window within (e) opening of swing door, new in-swing door within draveway. no new sq.ft. | $90,000 | |
| Sep 17, 2025 | Completed final sign-off Apr 2026 | 1082 Ashbury St | North Bay Construction | reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls.Details
reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls. | $90,000 |
| Aug 26, 2025 | In progress issued Dec 2025 | 2454 22nd Av | Mission Home Remodeling Inc | interior remodel of existing kitchen & laundry room in place. conversion of powder room into full bathroom via the addition of 32 sq ft of interior inhabitable space within existing building envelope.nw deck & deck exterior stairs within rear yard set back. 369 sq ft total within rear yard setbackDetails
interior remodel of existing kitchen & laundry room in place. conversion of powder room into full bathroom via the addition of 32 sq ft of interior inhabitable space within existing building envelope.nw deck & deck exterior stairs within rear yard set back. 369 sq ft total within rear yard setback | $80,000 |
| Aug 12, 2025 | In progress issued Aug 2025 | 726 33rd Av | Mireles Construction Inc | revision to pa # 2025-0613-8674. new sink and toilet in different location in new bathroomDetails
revision to pa # 2025-0613-8674. new sink and toilet in different location in new bathroom | |
| Jul 1, 2025 | Completed final sign-off May 2026 | 364 Moscow St | Maximo Construction | rebuild exterior entry stairs to bring into compliance. new front facade windows, withing (e) window openings. new exterior swing door for garage level. no change to (e) garage door or (e) entry door. replace with (e) opening single winodw on south side facade.Details
rebuild exterior entry stairs to bring into compliance. new front facade windows, withing (e) window openings. new exterior swing door for garage level. no change to (e) garage door or (e) entry door. replace with (e) opening single winodw on south side facade. | $10,000 |
| Jun 13, 2025 | Completed final sign-off Dec 2025 | 726 33rd Av | Mireles Construction Inc | remodel of existing full bath, conversion of powder room to full bath via absorbing e hall closet, addition of new hall closet within entry area. replacement of 1 window in kind,non street facing. electrical subpanel breaker rearranged to new interior wall. total 134 sqDetails
remodel of existing full bath, conversion of powder room to full bath via absorbing e hall closet, addition of new hall closet within entry area. replacement of 1 window in kind,non street facing. electrical subpanel breaker rearranged to new interior wall. total 134 sq | $15,000 |
| May 8, 2024 | Completed final sign-off Jul 2025 | 20 Eagle St | Y W Builders Inc. | interior remodel of extg single family home with attached garage at 20 eagle street. no change to extg height. no square footage added, no change to extg curb cut. reconfiguration of interior stair & lvl 2 bedroom, nw powder rm on lvl1. nw inset entry door. nw electric garage door,Details
interior remodel of extg single family home with attached garage at 20 eagle street. no change to extg height. no square footage added, no change to extg curb cut. reconfiguration of interior stair & lvl 2 bedroom, nw powder rm on lvl1. nw inset entry door. nw electric garage door, | $200,000 |
| Aug 1, 2023 | Completed final sign-off Oct 2024 | 706 10th Av | North Bay Construction | replace i-kind 3 windows on front facade and (e) central atrium not included in pa 202207077943. aluminum-clad wood (n) windows, no change in size. max u-factor 0.30.Details
replace i-kind 3 windows on front facade and (e) central atrium not included in pa 202207077943. aluminum-clad wood (n) windows, no change in size. max u-factor 0.30. | $15,000 |
| Mar 2, 2023 | Completed final sign-off Jan 2025 | 3660 22nd St | Y W Builders Inc. | 2nd flr bathroom remodel: alteration to one structural shearwall; 3rd flr bathroom remodel: in master bath and 2nd bath, remove one non-structural wallDetails
2nd flr bathroom remodel: alteration to one structural shearwall; 3rd flr bathroom remodel: in master bath and 2nd bath, remove one non-structural wall | $10,000 |
| Oct 26, 2022 | Completed final sign-off Apr 2025 | 364 Moscow St | Maximo Construction | recommencement and completion of work approved under pa# 201109074019. 50% of work remaining. new exterior deck with firewall on south edge. new raised floor at garage level. remove 2 non-compliant rear yard sheds. interior kitchen remodel, bath relocation, & wall reconfiguration at 2nd fl.Details
recommencement and completion of work approved under pa# 201109074019. 50% of work remaining. new exterior deck with firewall on south edge. new raised floor at garage level. remove 2 non-compliant rear yard sheds. interior kitchen remodel, bath relocation, & wall reconfiguration at 2nd fl. | $20,000 |
| Oct 18, 2022 | Expired or cancelled withdrawn Mar 2023 | 17 Chula Ln | main house: renovation of (e) home with no change to (e) footprint or height.Details
main house: renovation of (e) home with no change to (e) footprint or height. | $500,000 | |
| Oct 18, 2022 | Expired or cancelled withdrawn Mar 2023 | 17 Chula Ln | detached garage: convert to adu. 1 story vertical addition with one bedroom and bathroom.Details
detached garage: convert to adu. 1 story vertical addition with one bedroom and bathroom. | $500,000 | |
| Jul 7, 2022 | Completed final sign-off Oct 2024 | 706 10th Av | North Bay Construction | interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope.Details
interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope. | $300,000 |
| Oct 29, 2020 | Never finaled filed Oct 2020, never issued | 270 Hearst Av | repair front steps, inkind. add bathroom in (e) closet. renovate (e) bathroom & kithcen in-kind. replace 5 rear windows, in-kind.repace (e) front double hung window in-kind. replace (e) front sliding window with new fixed windows flanked with double hung windows.Details
repair front steps, inkind. add bathroom in (e) closet. renovate (e) bathroom & kithcen in-kind. replace 5 rear windows, in-kind.repace (e) front double hung window in-kind. replace (e) front sliding window with new fixed windows flanked with double hung windows. | $50,000 | |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 127 Gambier St | Darc Ventures Inc Dba Spl Construction S | interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged.Details
interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged. | $70,000 |
| Sep 19, 2020 | Completed final sign-off Jun 2021 | 728 Lyon St | North Bay Construction | 3rd floor: enlarge doorway betweeen room & hallway, add opening between dining & living room. reconfigure three bathrooms. basement: add 3 doorways & partition walls.Details
3rd floor: enlarge doorway betweeen room & hallway, add opening between dining & living room. reconfigure three bathrooms. basement: add 3 doorways & partition walls. | $70,000 |
| Jul 23, 2019 | Completed final sign-off Jan 2024 | 191 Sussex St | Greenstar Builders Inc | 1 adu per ord. #95-17. new adu created @ new lower level.add kitchen,guest room,bathroom&bedroom@new level. add porch in rear@new lower level.interior renovation. garage gets smaller. no excavation. new permeable driveway per pc sec. 132.Details
1 adu per ord. #95-17. new adu created @ new lower level.add kitchen,guest room,bathroom&bedroom@new level. add porch in rear@new lower level.interior renovation. garage gets smaller. no excavation. new permeable driveway per pc sec. 132. | $150,000 |
| Aug 21, 2018 | Completed final sign-off May 2019 | 101 States St | North Bay Construction | replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bathDetails
replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bath | $30,000 |
| Apr 9, 2018 | Completed final sign-off May 2018 | 2415 Mission St | Ardo Construction Co. | revision to app#201801299759 to include the partial t.i. at 2415 mission. scope includes removal & addition of non-load bearing partitions & finishes. no ext. work. exterior work under separate permit. no change to egress, occ, or common areas. all work within b. occ. no work in common areas.Details
revision to app#201801299759 to include the partial t.i. at 2415 mission. scope includes removal & addition of non-load bearing partitions & finishes. no ext. work. exterior work under separate permit. no change to egress, occ, or common areas. all work within b. occ. no work in common areas. | |
| Aug 14, 2012 | Completed final sign-off Oct 2013 | 2310 Hyde St | Ventana 76 | #1- renovation of kitchen, master bedroom suite and minor interior remodel.Details
#1- renovation of kitchen, master bedroom suite and minor interior remodel. | $250,000 |
| Jul 23, 2010 | Completed final sign-off Nov 2010 | 2344 California St | Snow Construction | master bedroom & closet renovation. new master bathroom. remodel bathroom at 1st floorDetails
master bedroom & closet renovation. new master bathroom. remodel bathroom at 1st floor | $50,000 |