Thuy Fontelera
- Listed as
- architect, engineer
- Firm
- Element Structural Engineers
- Based in
- Newark
- On San Francisco permits
- Mar 2015 to Sep 2026
14 permits since 2000 (engineer on 13 permits, architect on 1 permit): 5 completed, 5 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 1330 Howard St | Edgewood Builders Inc | revision to pa 202403188022 new accessible restrooms and kitchenette; new egress stairs from 2nd floor and basement; new accessible on-grade entranceDetails
revision to pa 202403188022 new accessible restrooms and kitchenette; new egress stairs from 2nd floor and basement; new accessible on-grade entrance | $88,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 690 Miramar Av | Aspect Builders Llc. | replace e) foundation and voluntary structural strengthing, design does not comply with asce 7.Details
replace e) foundation and voluntary structural strengthing, design does not comply with asce 7. | $80,000 |
| Nov 19, 2025 | In progress issued Nov 2025 | 2536 Baker St | Murphymckenna Construction | voluntary seismic retrofit to the existing sfr as noted below: selective seismic improvements in the transverse (n-s) directions, crawl space retrofit, seismic forces have been reduced to 0.75 of new design per sf-ebc section 304.3.2.Details
voluntary seismic retrofit to the existing sfr as noted below: selective seismic improvements in the transverse (n-s) directions, crawl space retrofit, seismic forces have been reduced to 0.75 of new design per sf-ebc section 304.3.2. | $40,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 69 Green St | Novo Construction Inc | cosmetic facade restoration at 2nd flr. existing windows to be reinstalled at some openings.Details
cosmetic facade restoration at 2nd flr. existing windows to be reinstalled at some openings. | $300,000 |
| Dec 12, 2024 | Completed final sign-off Jul 2025 | 26 Valerton Ct | T R E Construction And Management Inc | renovations for (e) 2 bathrooms and kitchen. cabinet, fixtures & finishes. expanding the width of opening from living room to dining room/kitchenDetails
renovations for (e) 2 bathrooms and kitchen. cabinet, fixtures & finishes. expanding the width of opening from living room to dining room/kitchen | $120,000 |
| Feb 9, 2024 | In progress issued Feb 2024 | 1330 Howard St | Edgewood Builders Inc | upgrade electrical service. concrete pad and supporting structure for (n) electrical equipment. accessiblity improvement- float & finish (n) accessible landing at (e) restroom; new accessible grab bar & toilet paper dispenser @ restroom.Details
upgrade electrical service. concrete pad and supporting structure for (n) electrical equipment. accessiblity improvement- float & finish (n) accessible landing at (e) restroom; new accessible grab bar & toilet paper dispenser @ restroom. | $6,850 |
| Mar 1, 2023 | Expired or cancelled expired Jun 2025 | 32 Parker Av | Williams Construction | foundation improvement for future roof deck addition.Details
foundation improvement for future roof deck addition. | $25,000 |
| Jul 7, 2022 | Completed final sign-off Oct 2024 | 706 10th Av | North Bay Construction | interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope.Details
interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope. | $300,000 |
| Feb 25, 2019 | Expired or cancelled cancelled Nov 2022 | 717 Union St | convert garage & workshop to 2 adu per ordinance# 162-16. enlarge refuse area, provide new resident storage. new exterior egress windows to street. lower (e) floor slab & foundation. soft story under pa# 2019/02/25/3748.Details
convert garage & workshop to 2 adu per ordinance# 162-16. enlarge refuse area, provide new resident storage. new exterior egress windows to street. lower (e) floor slab & foundation. soft story under pa# 2019/02/25/3748. | $120,000 | |
| Feb 25, 2019 | Expired or cancelled cancelled Nov 2022 | 717 Union St | voluntary soft story retrofit under ab-094. adu under pa# 2019/02/25/3757-s.Details
voluntary soft story retrofit under ab-094. adu under pa# 2019/02/25/3757-s. | $120,000 | |
| Jun 12, 2017 | Completed final sign-off Jul 2019 | 500 Haight St | All Bay Construction Inc | residential - soft story per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 2017-0612-9015 (address for commercial spaces are 500, 508, 518, 520 and 530 haight)Details
residential - soft story per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 2017-0612-9015 (address for commercial spaces are 500, 508, 518, 520 and 530 haight) | $180,000 |
| Jun 12, 2017 | Completed final sign-off Jul 2019 | 500 Haight St | All Bay Construction Inc | commercial - soft story retrofit per sfebc ch 4 2016 cebc appen a-4 mandatory soft story upgrade including steel moment frames and drag connections shear plywood on (e) walls. mandatory accessibility upgrades to commercial spaces including new on grade entrance ramps and (e) restroom improvements.Details
commercial - soft story retrofit per sfebc ch 4 2016 cebc appen a-4 mandatory soft story upgrade including steel moment frames and drag connections shear plywood on (e) walls. mandatory accessibility upgrades to commercial spaces including new on grade entrance ramps and (e) restroom improvements. | $118,400 |
| Oct 19, 2015 | Completed final sign-off Jun 2018 | 17 Uranus Tr | G-Max Construction | addition to the rear of mid and upper floors to replace existing deck remodel of kitchen, powder, master bedroom and bathDetails
addition to the rear of mid and upper floors to replace existing deck remodel of kitchen, powder, master bedroom and bath | $200,000 |
| Mar 13, 2015 | Expired or cancelled expired Sep 2019 | 940 Jones St | Barry M Nadell Construction Inc | 1st flr soft story improvements in cluding new moment frames, shear walls foundations, and transfer connections.Details
1st flr soft story improvements in cluding new moment frames, shear walls foundations, and transfer connections. | $68,000 |