Daren Wagoner
- Listed as
- architect, engineer
- Firm
- Barker Wagoner Architects
- Based in
- Redwood City
- On San Francisco permits
- Apr 2010 to Sep 2026
25 permits since 2000 (architect on 24 permits, engineer on 1 permit): 8 completed, 4 in progress, 3 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 1330 Howard St | Edgewood Builders Inc | revision to pa 202403188022 new accessible restrooms and kitchenette; new egress stairs from 2nd floor and basement; new accessible on-grade entranceDetails
revision to pa 202403188022 new accessible restrooms and kitchenette; new egress stairs from 2nd floor and basement; new accessible on-grade entrance | $88,000 |
| Aug 21, 2026 | In progress issued Aug 2026 | 140 Noe St | Bay Best Construction Inc | removing non-bearing wall between the unit & storage. relocating the water-heater from storage to exterior tankless(plumbing). installation of new recess lights(electrical). new flooring & paint. converting storage to closet.Details
removing non-bearing wall between the unit & storage. relocating the water-heater from storage to exterior tankless(plumbing). installation of new recess lights(electrical). new flooring & paint. converting storage to closet. | $35,000 |
| Dec 20, 2024 | Expired or cancelled expired May 2026 | 138 Noe St | to comply with nov #202431292. remove (e) non load bearing partitions at (e) kitchen & bedroom. remodel (e) kitchen including (n) sink & plumbing. add (n) bathroom with lavatory, water closet & drop in tub/shower. replace (e) bathtub, water closet & lavatory (e) bathroom with new layout.Details
to comply with nov #202431292. remove (e) non load bearing partitions at (e) kitchen & bedroom. remodel (e) kitchen including (n) sink & plumbing. add (n) bathroom with lavatory, water closet & drop in tub/shower. replace (e) bathtub, water closet & lavatory (e) bathroom with new layout. | $4,500 | |
| Mar 18, 2024 | In progress issued Apr 2024 | 1330 Howard St | Edgewood Builders Inc | replace e) storefront window system at front in-kind. replace e) section door w/ n) section door. replace falling second fl concrete exterior lightwell wall w/ n) wall. add plywood & re-root e) roof accessibility improvement (structural work roof framing). new front entry landing & ramp.Details
replace e) storefront window system at front in-kind. replace e) section door w/ n) section door. replace falling second fl concrete exterior lightwell wall w/ n) wall. add plywood & re-root e) roof accessibility improvement (structural work roof framing). new front entry landing & ramp. | $12,000 |
| Feb 9, 2024 | In progress issued Feb 2024 | 1330 Howard St | Edgewood Builders Inc | upgrade electrical service. concrete pad and supporting structure for (n) electrical equipment. accessiblity improvement- float & finish (n) accessible landing at (e) restroom; new accessible grab bar & toilet paper dispenser @ restroom.Details
upgrade electrical service. concrete pad and supporting structure for (n) electrical equipment. accessiblity improvement- float & finish (n) accessible landing at (e) restroom; new accessible grab bar & toilet paper dispenser @ restroom. | $6,850 |
| May 30, 2023 | Never finaled issued May 2023, no final | 38 Wilder St | Modern Art Construction | revision to 201806283250 front facade, remove 1 window, change direction of stair railing from vertival to hotizontal. change material and direction of rain screen on front facade. no change in bldg or height. no structural workDetails
revision to 201806283250 front facade, remove 1 window, change direction of stair railing from vertival to hotizontal. change material and direction of rain screen on front facade. no change in bldg or height. no structural work | |
| Aug 4, 2021 | Expired or cancelled cancelled Jan 2026 | 398 11th St | Edgewood Builders Inc | change of use from retail (15) to office (10). add 2 new restrooms and drinking fountains. upgrade (e) walls to 1hr fire barrier walls.Details
change of use from retail (15) to office (10). add 2 new restrooms and drinking fountains. upgrade (e) walls to 1hr fire barrier walls. | $10,000 |
| Jun 3, 2021 | Expired or cancelled cancelled Jan 2026 | 721 Brannan St | new perimeter fence, door, and gateDetails
new perimeter fence, door, and gate | $12,000 | |
| Aug 27, 2020 | Never finaled filed Aug 2020, never issued | 425 Mason St | new opening in 1st fl for natural light & circulation. (n) primary egress stair. expand (e) mezzanine area. reopen (e) openings along derby st. replace storefront windows. renovate (e) rooftop lounge area & roof deck/garden. (n) restrooms & kitchnettes. legalize roof deck a-2 occupancy.Details
new opening in 1st fl for natural light & circulation. (n) primary egress stair. expand (e) mezzanine area. reopen (e) openings along derby st. replace storefront windows. renovate (e) rooftop lounge area & roof deck/garden. (n) restrooms & kitchnettes. legalize roof deck a-2 occupancy. | $2,000,000 | |
| Sep 17, 2019 | Expired or cancelled cancelled Mar 2024 | 1330 Howard St | Edgewood Builders Inc | new storefronts at front facade. new stairs & elevator. new accessible entry with interior ramp. new accessible restrooms. new a-3 accesembly on roof deck & infill second floor area. new accessible kitchenette.Details
new storefronts at front facade. new stairs & elevator. new accessible entry with interior ramp. new accessible restrooms. new a-3 accesembly on roof deck & infill second floor area. new accessible kitchenette. | $1,000,000 |
| Aug 22, 2019 | Never finaled issued Aug 2019, no final | 528 Haight St | Edgewood Builders Inc | add bathroom to e dwelling unit, new vanity, fiberglass shower unit, new interior partitionsDetails
add bathroom to e dwelling unit, new vanity, fiberglass shower unit, new interior partitions | $3,000 |
| May 17, 2019 | Expired or cancelled withdrawn Aug 2021 | 368 Highland Av | rear yard horizontal addition to 1st flr for master bedrm & bath. remove interior walls on (e) 2nd flr. (n) 2nd flr exterior deck over addition. (n) mat slab @ (e) 1st flr to increase ceiling height. reconfigure 1st flr.Details
rear yard horizontal addition to 1st flr for master bedrm & bath. remove interior walls on (e) 2nd flr. (n) 2nd flr exterior deck over addition. (n) mat slab @ (e) 1st flr to increase ceiling height. reconfigure 1st flr. | $190,000 | |
| Feb 25, 2019 | Expired or cancelled cancelled Nov 2022 | 717 Union St | convert garage & workshop to 2 adu per ordinance# 162-16. enlarge refuse area, provide new resident storage. new exterior egress windows to street. lower (e) floor slab & foundation. soft story under pa# 2019/02/25/3748.Details
convert garage & workshop to 2 adu per ordinance# 162-16. enlarge refuse area, provide new resident storage. new exterior egress windows to street. lower (e) floor slab & foundation. soft story under pa# 2019/02/25/3748. | $120,000 | |
| Feb 25, 2019 | Expired or cancelled cancelled Nov 2022 | 717 Union St | voluntary soft story retrofit under ab-094. adu under pa# 2019/02/25/3757-s.Details
voluntary soft story retrofit under ab-094. adu under pa# 2019/02/25/3757-s. | $120,000 | |
| Feb 21, 2019 | Completed final sign-off Jul 2019 | 721 Brannan St | Edgewood Builders Inc | 1st & 2nd flr of building b. tenant improvement incl new lobby, employee kitchenettes, shower, new stairs and non-load bearing interior partitionsDetails
1st & 2nd flr of building b. tenant improvement incl new lobby, employee kitchenettes, shower, new stairs and non-load bearing interior partitions | $95,000 |
| Jun 28, 2018 | Completed final sign-off May 2024 | 38 Wilder St | third floor & roof deck addition. first & second floor addition & remodel. enlarge to (4) bedroom, (3) bath with new media room & office. provide nfpa 13d fire sprinkler system throughoutDetails
third floor & roof deck addition. first & second floor addition & remodel. enlarge to (4) bedroom, (3) bath with new media room & office. provide nfpa 13d fire sprinkler system throughout | $240,000 | |
| Jun 12, 2017 | Completed final sign-off Jul 2019 | 500 Haight St | All Bay Construction Inc | commercial - soft story retrofit per sfebc ch 4 2016 cebc appen a-4 mandatory soft story upgrade including steel moment frames and drag connections shear plywood on (e) walls. mandatory accessibility upgrades to commercial spaces including new on grade entrance ramps and (e) restroom improvements.Details
commercial - soft story retrofit per sfebc ch 4 2016 cebc appen a-4 mandatory soft story upgrade including steel moment frames and drag connections shear plywood on (e) walls. mandatory accessibility upgrades to commercial spaces including new on grade entrance ramps and (e) restroom improvements. | $118,400 |
| Mar 30, 2017 | Completed final sign-off Dec 2017 | 144 Noe St | Edgewood Builders Inc | remodel kitchen, new partitions, remodel (e) bathroom, new lighting, demolition of walls & doors.Details
remodel kitchen, new partitions, remodel (e) bathroom, new lighting, demolition of walls & doors. | $55,000 |
| Sep 30, 2016 | Completed final sign-off Sep 2017 | 398 11th St | Edgewood Builders Inc | 3rd floor t.i. incuding new accessible restrooms and shower, conference rooms, offices, and cafe area. new elevator and 1st floor elevator lobby w. new storefront to replace exist. roll up. n/a for maherDetails
3rd floor t.i. incuding new accessible restrooms and shower, conference rooms, offices, and cafe area. new elevator and 1st floor elevator lobby w. new storefront to replace exist. roll up. n/a for maher | $324,000 |
| Nov 13, 2014 | Completed final sign-off Mar 2015 | 3979 24th St | Edgewood Builders Inc | note added to plans clarifying fire resistive rating requirement for new structural work per field inspector request 201405095327Details
note added to plans clarifying fire resistive rating requirement for new structural work per field inspector request 201405095327 | |
| Sep 4, 2014 | Expired or cancelled withdrawn Mar 2015 | 940 Jones St | first floor soft story retrofit per sfbc chaptrer 34b 2012 iebc appendix a-4. including new moment frames, shear walls, foundations & transfer connections, removal of (e) windows & new doors in (e) opening as needed for new shear wall configuration.Details
first floor soft story retrofit per sfbc chaptrer 34b 2012 iebc appendix a-4. including new moment frames, shear walls, foundations & transfer connections, removal of (e) windows & new doors in (e) opening as needed for new shear wall configuration. | $88,000 | |
| Aug 28, 2014 | Completed final sign-off Mar 2015 | 3979 24th St | Edgewood Builders Inc | revision to 201405095372: enlarge size of new accessible bathroom. relocate door. structrual modifications to address field conditions including new beams and foundation improvementsDetails
revision to 201405095372: enlarge size of new accessible bathroom. relocate door. structrual modifications to address field conditions including new beams and foundation improvements | $4,600 |
| May 9, 2014 | Completed final sign-off Mar 2015 | 3979 24th St | Edgewood Builders Inc | seismic upgrade consisting of ordinary moment frames, foundations, & shear walls. required accessibility improvements per 20% rule including automatic door opener & accessible bathroom upgrade.Details
seismic upgrade consisting of ordinary moment frames, foundations, & shear walls. required accessibility improvements per 20% rule including automatic door opener & accessible bathroom upgrade. | $70,000 |
| Apr 6, 2012 | Expired or cancelled expired May 2023 | 38 Wilder St | revision to appl #2010.04.30.1425 to delete remodel of existing 1st floor bathroom & change location of countertop & built-in bench in kitchen.Details
revision to appl #2010.04.30.1425 to delete remodel of existing 1st floor bathroom & change location of countertop & built-in bench in kitchen. | ||
| Apr 30, 2010 | Expired or cancelled expired May 2023 | 38 Wilder St | legalize (e) bedrm & bath @ garage(1st) flr & protect stair & vest in garage w/5/8" & rated door @ 1st flr. relcoate kitchen convert (e) kitchen to ma. bedrm, remodel 2nd flr bath, remove non-struct walls, remvoe ceiling in liv & kitchen & insulate joistbay,replace front window, door, add skylight.Details
legalize (e) bedrm & bath @ garage(1st) flr & protect stair & vest in garage w/5/8" & rated door @ 1st flr. relcoate kitchen convert (e) kitchen to ma. bedrm, remodel 2nd flr bath, remove non-struct walls, remvoe ceiling in liv & kitchen & insulate joistbay,replace front window, door, add skylight. | $85,000 |