Block 5717, lot 044
368 Highland Ave
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,919 sq ft
- Lot
- 2,696 sq ft
- Zoning
- RH2
- Construction type
- WOO
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 2, 2021 | Completed final sign-off Jun 2022 | 368 Highland Av | 2k Builders Llc | rebuild deck in back of house.Details
rebuild deck in back of house. | $30,000 |
| May 17, 2019 | Expired or cancelled withdrawn Aug 2021 | 368 Highland Av | rear yard horizontal addition to 1st flr for master bedrm & bath. remove interior walls on (e) 2nd flr. (n) 2nd flr exterior deck over addition. (n) mat slab @ (e) 1st flr to increase ceiling height. reconfigure 1st flr.Details
rear yard horizontal addition to 1st flr for master bedrm & bath. remove interior walls on (e) 2nd flr. (n) 2nd flr exterior deck over addition. (n) mat slab @ (e) 1st flr to increase ceiling height. reconfigure 1st flr. | $190,000 | |
| Jul 30, 2013 | Completed final sign-off Oct 2013 | 368 Highland Av | Able Window Inc. | install 6 essence fiberglass/wood windows like for like, 1 at entry by stairs, 2 at master bedroom, 2 at girls room and 1 at baby's room. visible from street. u-factor 0.40 max.Details
install 6 essence fiberglass/wood windows like for like, 1 at entry by stairs, 2 at master bedroom, 2 at girls room and 1 at baby's room. visible from street. u-factor 0.40 max. | $7,488 |
| Apr 25, 2013 | Completed final sign-off Jan 2015 | 368 Highland Av | Sp Environmental Inc | demolish entry deck/stairway, rebuild deck/stairway structural in place. clean/dispose of all debris, prepair around for new concrete slab as a base for new wooden stairway structure, install #3 rebar,pour 6" conc slab position galvanized 5/8" anchors as mud sill holders,pressure treated wd redwood.Details
demolish entry deck/stairway, rebuild deck/stairway structural in place. clean/dispose of all debris, prepair around for new concrete slab as a base for new wooden stairway structure, install #3 rebar,pour 6" conc slab position galvanized 5/8" anchors as mud sill holders,pressure treated wd redwood. | $16,600 |
| Mar 4, 2009 | Never finaled issued Mar 2009, no final | 368 Highland Av | street spaceDetails
street space |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.