Block 4274, lot 011A
1378 York St
- City’s use
- Single Family Residential
- Built
- 1953
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,475 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 8, 2025 | Completed final sign-off Mar 2025 | 1378 York St | Shelter Cove Construction | revision to pa 202211156502 limited to additional structural calcs and correction to special inspection requirements - no high strength bolting requiredDetails
revision to pa 202211156502 limited to additional structural calcs and correction to special inspection requirements - no high strength bolting required | |
| Jul 11, 2023 | Completed final sign-off Aug 2023 | 1378 York St | Mike Mccurdy Roofing Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,800 |
| Apr 6, 2023 | Never finaled issued Apr 2023, no final | 1378 York St | Fulcrum Point Construction | revise pa# 2022-1115-6502: to revise property line foundaation detailingDetails
revise pa# 2022-1115-6502: to revise property line foundaation detailing | |
| Nov 15, 2022 | Completed final sign-off Mar 2025 | 1378 York St | Fulcrum Point Construction | new windows to replace (e) at rear bedrooms at 1st & 2nd fl. new roof skylights with 1 hr fr parapet. replace siding at rear. new trellis and garden structure. reconfigure interior stair. reconfigure primary bedroom suite, laundry to replace (e) at 1st fl. new pwder room at 1st fl.Details
new windows to replace (e) at rear bedrooms at 1st & 2nd fl. new roof skylights with 1 hr fr parapet. replace siding at rear. new trellis and garden structure. reconfigure interior stair. reconfigure primary bedroom suite, laundry to replace (e) at 1st fl. new pwder room at 1st fl. | $175,000 |
| May 7, 2009 | Completed final sign-off Jun 2009 | 1378 York St | Dura Foam, Inc | reroofing.Details
reroofing. | $6,325 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fulcrum Point Construction (2), Dura Foam, Inc, Mike Mccurdy Roofing Inc, Shelter Cove Construction
- Architects
- James Hill (2), James Hill
- Engineers
- Victor Ramos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.